NAICS code
Research and Development in the Physical, Engineering, and Life Sciences
- NAICS code
- 541710
- Latest action
- Aug 4, 2026
Fewer than the minimum comparable awards under this NAICS code.
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| DEAC5207NA27344 TAS::89 0240::TAS THIS PERFORMANCE-BASED MANAGEMENT CONTRACT (PBMC) IS FOR THE MANAGEMENT AND OPERATION OF THE LAWRENCE LIVERMORE NATIONAL LABORATORY (LLNL). THE CONTRACTOR SHALL, IN ACCORDANCE WITH THE PROVISIONS OF THIS CONTRACT, ACCOMPLISH THE MISSIONS AND PROGRAMS ASSIGNED BY THE U.S. DEPARTMENT OF ENERGY (DOE) AND MANAGE AND OPERATE THE LABORATORY. THE LABORATORY IS ONE OF DOES OFFICE OF DEFENSE PROGRAM MULTI-PROGRAM LABORATORIES. THE LABORATORY IS A FEDERALLY FUNDED RESEARCH AND DEVELOPMENT INSTITUTION (ESTABLISHED IN ACCORDANCE WITH THE FEDERAL ACQUISITION REGULATION (FAR) PART 35 AND OPERATED UNDER THIS MANAGEMENT AND OPERATING (M&O) CONTRACT, AS DEFINED IN FAR 17.6 AND DEAR 917.6. | LAWRENCE LIVERMORE NATIONAL SECURITY, LLC | Department of Energy | CA | May 8, 2007 | $60,213,858,745 |
| DEAC3243AL00036 MANAGEMENT AND OPERATION OF LOS ALAMOS NATIONAL LABORATORY (M&O CONTRACT-W-7405-ENG-36) | REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | Department of Energy | NM | May 6, 2026 | $35,295,925,219 |
| DEAC0576RL01830 BATTELLE MEMORIAL INSTITUTE/PACIFIC NORTHWEST LABORATORY OPERATING AND MANAGING CONTRACT | BATTELLE MEMORIAL INSTITUTE | Department of Energy | WA | Oct 12, 1978 | $34,746,252,962 |
| DEAC0276SF00515 OPERATION AND MAINTENANCE LINEAR ACCELLERATOR | THE LELAND STANFORD JUNIOR UNIVERSITY | Department of Energy | CA | Nov 20, 1978 | $24,976,833,219 |
| DEAC0205CH11231 THIS PERFORMANCE-BASED MANAGEMENT CONTRACT (PBMC) IS FOR THE MANAGEMENT AND OPERATION OF THE ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY (LBNL). THE CONTRACTOR SHALL, IN ACCORDANCE WITH THE PROVISIONS OF THIS CONTRACT, ACCOMPLISH THE MISSIONS AND PROGRAMS ASSIGNED BY THE U.S. DEPARTMENT OF ENERGY (DOE) AND MANAGE AND OPERATE THE LABORATORY. THE LABORATORY IS ONE OF THE DOE?S OFFICE OF SCIENCE (SC) MULTI-PROGRAM LABORATORIES. THE LABORATORY IS A FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) ESTABLISHED IN ACCORDANCE WITH THE FEDERAL ACQUISITION REGULATION (FAR) PART 35 AND OPERATED UNDER THIS MANAGEMENT AND OPERATING (M&O) CONTRACT, AS DEFINED IN FAR 17.6 AND DEAR 917.6. | THE REGENTS OF THE UNIVERSITY OF CALIFORNIA | Department of Energy | CA | Apr 19, 2005 | $21,256,597,249 |
| DEAC0206CH11357 PERFORMANCE-BASED CONTRACT FOR MANAGEMENT AND OPERATION OF ARGONNE NATIONAL LABORATORY | UCHICAGO ARGONNE, LLC | Department of Energy | IL | Jul 31, 2006 | $18,015,991,227 |
| NNJ06TA25C ORION CREW EXPLORATION VEHICLE CONTRACT | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | CO | Mar 26, 2026 | $15,716,527,609 |
| F0470102C0002 DE-OB MOD. R&D- SPACE: OTHER (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT) | LOCKHEED MARTIN CORP | Department of Defense | CA | Mar 11, 2026 | $7,293,203,068 |
| DEAC0506OR23177 MANAGEMENT AND OPERATION OF THE THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY (APPROPRIATED FUNDS: -$5,181,387.76; NON-APPROPRIATED FUNDS: $0) | JEFFERSON SCIENCE ASSOCIATES, LLC | Department of Energy | VA | Mar 30, 2026 | $3,388,410,365 |
| NAS503127 THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS. | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | National Aeronautics and Space Administration | MD | Jun 6, 2003 | $1,792,300,654 |
| MSFC0200308DNAS803060 FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE TO SUPPORT THE CXO | SMITHSONIAN INSTITUTION | National Aeronautics and Space Administration | MA | Mar 13, 2026 | $1,406,417,924 |
| DEAC0207CH11358 MULTI-PROGRAM NATIONAL PHYSICAL RESEARCH INCLUDING RARE EARTHS AND USE OF AMES MPC. | IOWA STATE UNIVERSITY OF SCIENCE AND TECHNOLOGY | Department of Energy | IA | Dec 4, 2006 | $1,150,625,344 |
| GSFC0200208DNAS502105 OBLIGATE ADDITIONAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE FOR JWST SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM (NIRCAM) | UNIVERSITY OF ARIZONA | National Aeronautics and Space Administration | AZ | May 13, 2026 | $466,115,825 |
| NNJ04AA03C ISS CARGO MISSION CONTRACT (CMC) | LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC | National Aeronautics and Space Administration | TX | Mar 4, 2026 | $415,122,097 |
| NNJ06HC01C TEST AND EVALUATION CONTRACT PRIMARY MISSION OF WSTF INCLUDING MATERIALS COMPONENTS TESTING | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | NM | Mar 4, 2026 | $270,899,316 |
| GSFC0200210DNAS502139 SOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT. | THE LELAND STANFORD JUNIOR UNIVERSITY | National Aeronautics and Space Administration | CA | Oct 15, 2002 | $186,336,824 |
| NNM06AA75C THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM. | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | TX | Jun 29, 2026 | $184,270,441 |
| NNG04EA00C ATMOSPHERIC IMAGE ASSEMBLY MISSION OPERATIONS AND DATA ANALYSIS FOR THE NASA SOLAR DYNAMICS OBSERVATORY | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | CA | Apr 1, 2026 | $146,711,460 |
| GSFC0200005DNAS500147 GAMMA RAY LARGE AREA SPACE TELESCOPE (GLAST). THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING NASA REVIEWS&DIRECTED ENGINEERING ANALYSIS, OBSERVATION PLANNING, MISSION SCHEDULING, SATELLITE OPERATIONS, SCIENCE DATA PROCESSING SUPPORT, SPACECRAFT HEALTH/SAFETY/PERFORMANCE ANALYSIS, INSTRUMENT PERFORMANCE SUPPORT ANALYSIS, FLIGHT/GROUND SYSTEM&SOFTWARE, AND ANOMALY RESOLUTION&ANALYSIS. | THE LELAND STANFORD JUNIOR UNIVERSITY | National Aeronautics and Space Administration | CA | May 3, 2000 | $132,603,830 |
| GSFC0200004DNAS500136 SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM | THE PENNSYLVANIA STATE UNIVERSITY | National Aeronautics and Space Administration | PA | Mar 17, 2026 | $83,541,958 |
| NNM07AA01C HINODE - FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS. HINODE IS A CONTINUATION OF A JOINT INTERNATIONAL VENTURE BETWEEN THE U.S, G.B., AND JPN TO ADVANCE OUR UNDERSTANDING OF WHAT POWERS THE SOLAR ATMOSPHERE AND DRIVES SOLAR ERUPTIONS. | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | CA | Mar 9, 2026 | $66,059,549 |
| GSFC0200210DNAS502140 EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO) | THE REGENTS OF THE UNIVERSITY OF COLORADO | National Aeronautics and Space Administration | CO | Oct 15, 2002 | $61,617,391 |
| NNN16AA09T VAN ALLEN PROBE PHASE E EXTENDED MISSION THE CONTRACTOR SHALL PERFORM THE WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THE OVERALL SCOPE OF WORK TO BE PERFORMED WILL SUPPORT ALL OF NASA'S MISSION DIRECTORATES. THESE EFFORTS CAN BE CHARACTERIZED AS AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT (ARDES). THE GENERAL NATURE OF THE TASKS TO BE DEVELOPED WILL BE TO CONDUCT SUPPORTING RESEARCH AND ADVANCED TECHNOLOGY DEVELOPMENT DESIGNED TO MAKE CONTRIBUTIONS TO SPACE SCIENCE AND SPACE EXPLORATION AND ASSIST NASA IN THE FORMULATION AND EXECUTION OF ITS PROGRAMS BY PROVIDING NASA WITH TECHNICAL ADVICE, STUDIES, AND REPORTS OF INVESTIGATIONS. EFFORTS UNDERTAKEN BY THE CONTRACTOR, IN THE PERFORMANCE OF THE ASSIGNED TASKS, WHICH INCLUDE TECHNOLOGY TRANSFER, PARTNERING AND COMMERCIALIZATION ACTIVITIES, SHALL SEEK TO ENHANCE THE VALUE AND CONTRIBUTION OF TECHNOLOGY TO THE NATION IS TECHNOLOGICAL COMPETITIVENESS, PROSPERITY, QUALITY OF LIFE, AND OTHER NATIONAL PRIORITIES. INDIVIDUAL TASK ORDERS WILL FALL WITHIN ONE OF TWO BROAD CATEGORIES: 1) ESSENTIAL RESEARCH CAPABILITY OF SPACE SYSTEMS ENGINEERING, AND RELATED WORK IN THE SUPPORTING ESSENTIAL RESEARCH CAPABILITIES OF SYSTEMS TEST AND EVALUATION, INFORMATION TECHNOLOGY, AND SIMULATION, MODELING AND OPERATIONS ANALYSIS. TASK ORDERS WITHIN THE CATEGORY OF ESSENTIAL RESEARCH CAPABILITIES ARE INTENDED TO PRESERVE THE NATION IS CAPABILITIES TO PERFORM ROBOTIC SPACE MISSIONS OVER THE FULL MISSION LIFE CYCLE FROM CONCEPT FORMULATION THROUGH MISSION OPERATIONS AND DATA ANALYSIS. NASA IS CONTRACTING FOR SUPPORT IN SEVERAL KEY RESEARCH, ENGINEERING AND DEVELOPMENT COMPETENCIES THAT ARE FUNDAMENTAL TO THE PERFORMANCE OF THESE MISSIONS. 2) OTHER AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT. TASK ORDERS WITHIN THE CATEGORY OF OTHER AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT ARE INTENDED TO INCLUDE A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM RESPONSIBILITIES AND ASSIGNMENTS. REGARDLESS OF CATEGORY, TASK ORDERS MAY BE ISSUED RELATED TO AUTONOMOUS DEEP-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, EXPERIMENTS, INSTRUMENTS OR OTHER DEVICES THAT MAY BE CARRIED AS PAYLOADS ON THE SPACE SHUTTLE OR ON OTHER SPACECRAFT. TASK ASSIGNMENTS WILL EXPLICITLY DESCRIBE A BROAD RANGE OF HARDWARE, SOFTWARE, SYSTEMS ENGINEERING, SCIENTIFIC ANALYSIS, AND MANAGEMENT EFFORTS INCLUDING PROGRAM AND PROJECT MANAGEMENT AND ADMINISTRATION. | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | National Aeronautics and Space Administration | MD | Jun 22, 2026 | $57,814,837 |
| W31P4Q21FC003 ENGINEERING SUPPORT FOR THE AVIATION AND MISSILE CENTER (AVMC), SYSTEMS READINESS DIRECTORATE (SRD) RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SYSTEM ASSESSMENT (SA) | MTA INC | Department of Defense | AL | Mar 19, 2026 | $49,576,339 |
| NNM07AB07C THE HINODE PHASE E MISSION IS A CONTINUATION OF A JOINT "INTERNATIONAL" VENTURE TO ADVANCE OUR UNDERSTANDING OF THE SUN THROUGH OBSERVATION IN EARTH'S ORBIT. THE CONTINUATION OF THIS PHASE IS TITLED, "HINODE," FORMERLY KNOWN AS SOLAR-B X-RAY TELESCO | SMITHSONIAN INSTITUTION | National Aeronautics and Space Administration | MA | Mar 2, 2026 | $49,218,185 |
Related records
Derived from awards these records share, ordered by how many.
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this NAICS code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the NAICS code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.