Contractor
LOCKHEED MARTIN CORPORATION
- UEI
- HDHVQ4EF8A89
- Parent UEI
- ZFN2JJXBLZT3
- Resolved by
- uei
- Confidence
- 1.000
Active from Oct 31, 2007 to Aug 5, 2026.
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| NNG09FA40C INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | National Aeronautics and Space Administration | CA | Sep 30, 2009 | $198,769,611 |
| NNG08HZ00C TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | National Aeronautics and Space Administration | CA | Oct 31, 2007 | $509,533,193 |
| 80GSFC21C0011 MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A | National Aeronautics and Space Administration | CA | May 26, 2026 | $220,462,628 |
| NNM07AA01C HINODE - FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS. HINODE IS A CONTINUATION OF A JOINT INTERNATIONAL VENTURE BETWEEN THE U.S, G.B., AND JPN TO ADVANCE OUR UNDERSTANDING OF WHAT POWERS THE SOLAR ATMOSPHERE AND DRIVES SOLAR ERUPTIONS. | National Aeronautics and Space Administration | CA | Mar 9, 2026 | $66,059,549 |
| 80GSFC26C0015 HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES | National Aeronautics and Space Administration | CA | May 13, 2026 | $16,945,134 |
| NNG07HW20C SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT. THIS CONTRACT IS FOR THE DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE SUVI IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE SUVI INSTRUMENT PROVIDES A BROADBAND IMAGING IN THE EXTREME ULTRAVIOLET WAVELENGTH RANGE TO MONITOR THE ENTIRE DYNAMIC RANGE OF SOLAR FEATURES, FROM CORONAL HOLES TO FLARES, AS WELL AS THE ESTIMATE OF TEMPERATURE AND EMISSION MEASURE. THESE DATA ARE USED FOR GEOMAGNETIC STORM FORECASTS AND FORECASTS OF SOLAR ENERGETIC PARTICLE EVENTS RELATED TO FLARES. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE SUVI FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO SUVI EMULATORS (SUVIES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL SUVI MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | National Aeronautics and Space Administration | CA | Mar 5, 2026 | $338,991,819 |
| NNG04EA00C ATMOSPHERIC IMAGE ASSEMBLY MISSION OPERATIONS AND DATA ANALYSIS FOR THE NASA SOLAR DYNAMICS OBSERVATORY | National Aeronautics and Space Administration | CA | Apr 1, 2026 | $146,711,460 |
| 80MSFC24CA015 TECHNOLOGY MATURATION FOR ASTROPHYSICS SPACE TELESCOPES (TECHMAST) | National Aeronautics and Space Administration | CA | Apr 6, 2026 | $4,759,424 |
| N0017322C6001 RD FOR EUVST EPSILON MISSION TO LM SOLAR AND ASTROPHYSICAL LABORATORY | Department of Defense | CA | Mar 30, 2026 | $33,759,708 |
| 1305M224C0039 ** MISSION CRITICAL REQUIREMENT FOR NOAA/OMAO_PRODUCTION OF UP TO FOUR (4) FULLY MODIFIED C130J AIRCRAFT | Department of Commerce | GA | Mar 6, 2026 | $461,039,171 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier HDHVQ4EF8A89, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.