Place of performance
Alabama
- State code
- AL
- Latest action
- Aug 8, 2026
Largest awards performed here
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| NNM07AB03C PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT. | THE BOEING COMPANY | National Aeronautics and Space Administration | AL | Aug 28, 2007 | $10,719,778,710 |
| HQ085621C0001 DESIGN, DEVELOPMENT, INTEGRATION, TEST, AND DELIVERY OF THE GROUND-BASED MIDCOURSE DEFENSE NEXT GENERATION INTERCEPTOR. | LOCKHEED MARTIN CORPORATION | Department of Defense | AL | Mar 13, 2026 | $7,997,154,914 |
| HQ014719C0004 GMD DEVELOPMENT AND SUSTAINMENT CONTRACT | THE BOEING COMPANY | Department of Defense | AL | Mar 23, 2026 | $5,018,451,126 |
| W9124G17C0104 AIRCRAFT MAINTENANCE- ARMY AND AIR FORCE | M1 SUPPORT SERVICES, L.P. | Department of Defense | AL | Mar 11, 2026 | $4,896,387,433 |
| 80MSFC20C0052 SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC) | THE BOEING COMPANY | National Aeronautics and Space Administration | AL | Oct 16, 2019 | $3,857,878,333 |
| 80MSFC23CA014 RAPID DDT&E AND DEMONSTRATION OF S SUSTAINABLE HUMAN LANDING SYSTEM INTEGRATED LANDER. | BLUE ORIGIN MANUFACTURING, LLC | National Aeronautics and Space Administration | AL | May 18, 2023 | $3,266,761,506 |
| N0002417C2301 OCT 2025 REVISED BILLING PRICE (RBP) AND DEOBLIGATION. | AUSTAL USA, LLC | Department of Defense | AL | Apr 2, 2026 | $3,081,786,039 |
| 47QFSA20F0057 MIGRATED ID04190086 SOFTWARE LIFE CYCLE DEVELOPMENT. THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE CLOSEOUT ACTIONS FOR THE REQUIREMENT. | SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | General Services Administration | AL | Mar 6, 2026 | $2,900,096,115 |
| 80MSFC18C0011 ENGINEERING SERVICES AND SCIENCE CAPABILITY AUGMENTATION (ESSCA) | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | AL | Mar 10, 2026 | $2,268,147,838 |
| HQ085625FE001 THIS CONTRACT COVERS THE GROUND-BASED MIDCOURSE DEFENSE (GMD) WEAPON SYSTEM (GWS) SYSTEMS ENGINEERING, DESIGN, DEVELOPMENT, INTEGRATION, TESTING, AND FIELDING OF SOFTWARE AND HARDWARE. | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | AL | Mar 11, 2026 | $2,121,422,394 |
| N0002419C2227 EPF 16 FUNDING | AUSTAL USA, LLC | Department of Defense | AL | Mar 26, 2026 | $1,885,427,097 |
| HQ085821C0015 TEAMS-NEXT MISSILE DEFENSE SYSTEMS ENGINEERING | PARSONS GOVERNMENT SERVICES INC. | Department of Defense | AL | Mar 4, 2026 | $1,749,716,190 |
| NNM12AA82C INTERIM CRYOGENIC PROPULSION STAGE FOR SLS | THE BOEING COMPANY | National Aeronautics and Space Administration | AL | Sep 28, 2012 | $1,540,101,537 |
| 70Z02322C93220001 THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE CLIN 3002 (PRODUCTION AND CLASSING OF OPC-B3). | AUSTAL USA, LLC | Department of Homeland Security | AL | Mar 19, 2026 | $1,420,176,932 |
| 47QFCA25F0009 SYSTEM SOFTWARE LIFECYCLE ENGINEERING SSLE | SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | General Services Administration | AL | Mar 13, 2025 | $1,020,436,622 |
| W58RGZ19C0003 THE PURPOSE OF THIS ACTION IS TO UPDATE THE SHIPPING INSTRUCTIONS FOR T901 ENGINES IMPROVED TURBINE ENGINE PROGRAM IN SUPPORT OF THE WARFIGHTER. | GENERAL ELECTRIC COMPANY | Department of Defense | AL | Mar 12, 2026 | $964,133,255 |
| W31P4Q19C0003 POLAND FMS, THE INTEGRATED AIR AND MISSILE DEFENSE (IAMD) BATTLE COMMAND SYSTEM (IBCS) | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | AL | Mar 12, 2026 | $881,790,267 |
| W31P4Q22F0031 INTEGRATED BATTLE COMMAND SYSTEM (IBCS) LOW RATE INITIAL PRODUCTION (LRIP) | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | AL | Mar 26, 2026 | $849,153,446 |
| W31P4Q21F0095 HARDWARE WITHIN THE LOOP (HWIL) MODELING & SIMULATION (M&S) DEVELOPMENT ENGINEERING SERVICES | SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | Department of Defense | AL | Mar 2, 2026 | $778,875,124 |
| W9124G17C0005 IERW | AMENTUM SERVICES, INC. | Department of Defense | AL | Mar 16, 2026 | $654,749,520 |
| W31P4Q21F0038 PROVIDE THE EXPERTISE TO DEVELOP, ENHANCE, EVALUATE AND MAINTAIN THE CURRENT SUITE OF DISTRIBUTED DIGITAL SIMULATION, AND SYSTEM OF SYSTEMS UNIQUE DEVELOPMENT FACILITIES FOR THE DEVCOM AVMC S3I DIRECTORATE, HARDWARE IN THE LOOP AREA. | TORCH TECHNOLOGIES INC | Department of Defense | AL | Feb 27, 2026 | $652,654,295 |
| W31P4Q23C0008 TEL 7 BOC SOW & LETTER UPDATE | LOCKHEED MARTIN CORPORATION | Department of Defense | AL | Mar 5, 2026 | $635,548,332 |
| HQ085622F0001 GWS | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | AL | Mar 12, 2026 | $635,302,507 |
| N0002423C2203 T-AGOS 25 CLASS - SHIP 1 | AUSTAL USA, LLC | Department of Defense | AL | Apr 27, 2026 | $634,220,235 |
| HQ085224F0005 LABOR: OPERATIONS AND MAINTENANCE | LOCKHEED MARTIN CORPORATION | Department of Defense | AL | Mar 18, 2026 | $627,971,275 |
Related records
Derived from awards these records share, ordered by how many.
Benchmarked categories
Buying agencies
Industry codes
- 311991 — Perishable Prepared Food Manufacturing18,391
- 324110 — Petroleum Refineries4,287
- 332994 — Small Arms, Ordnance, and Ordnance Accessories Manufacturing538
- 311999 — All Other Miscellaneous Food Manufacturing531
- 622110 — General Medical and Surgical Hospitals462
- 332722 — Bolt, Nut, Screw, Rivet, and Washer Manufacturing283
- 336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing274
- 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)274
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards whose primary place of performance is Alabama. Awards spanning several states are counted once, at the primary place the government recorded.
- 1Grouping is by primary place of performance, not by where the contractor is headquartered. A company in another state performing work here appears on this page. Awards come from USAspending.gov, last refreshed Aug 10, 2026.
- 2Published distribution over 46 awards performed in Alabama, computed Aug 10, 2026.