Contract award
ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC.
THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.
- PIID
- NAS503127
- Award key
- CONT_AWD_NAS503127_8000_-NONE-_-NONE-
- Recipient UEI
- W1NBN156CYF9
- Source as of
- —
Current award value
$1,792,300,6543
Obligated to date
$1,589,272,0702
Potential with options
$1,792,300,6543
- Awarding agency
- National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
- Place of performance
- Baltimore, Maryland
- Set-aside
- No set-aside used
- Pricing
- Cost No Fee
- Competition
- Not Competed1 offers received
- Period of performance
- Oct 1, 2003 — Jun 25, 2027Through Jun 25, 2027 if all options are exercised
- Benchmark category
- Unclassified
Transaction history
Every action recorded against this award, in the order the government reported them.
| Mod | Action date | Reason | Obligation | Value at action |
|---|---|---|---|---|
| 0 | Jun 6, 2003 | Initial award | $0.00 | $1,792,300,653.65 |
| 1 | Oct 1, 2003 | M | $2,500,000.00 | $1,792,300,653.65 |
| 2 | Oct 1, 2003 | M | $1,850,000.00 | $1,792,300,653.65 |
| 23 | Feb 17, 2005 | C | $10,482,013.00 | $1,792,300,653.65 |
| 24 | Mar 22, 2005 | B | $0.00 | $1,792,300,653.65 |
| 25 | Apr 5, 2005 | C | $3,500,000.00 | $1,792,300,653.65 |
| 27 | Jul 1, 2005 | M | $0.00 | $1,792,300,653.65 |
| 29 | Jul 27, 2005 | C | $600,000.00 | $1,792,300,653.65 |
| 30 | Sep 14, 2005 | C | $897,404.00 | $1,792,300,653.65 |
| 33 | Oct 12, 2005 | C | $1,150,000.00 | $1,792,300,653.65 |
| 34 | Nov 15, 2005 | C | $300,000.00 | $1,792,300,653.65 |
| 35 | Nov 30, 2005 | M | $302,500.00 | $1,792,300,653.65 |
| 36 | Dec 14, 2005 | C | $500,000.00 | $1,792,300,653.65 |
| 37 | Jan 6, 2006 | C | $1,000,000.00 | $1,792,300,653.65 |
| 38 | Feb 16, 2006 | C | $225,000.00 | $1,792,300,653.65 |
| 39 | Mar 1, 2006 | C | $2,716,660.00 | $1,792,300,653.65 |
| 40 | May 22, 2006 | C | $80,000.00 | $1,792,300,653.65 |
| 41 | Jun 22, 2006 | M | $0.00 | $1,792,300,653.65 |
| 42 | Jun 28, 2006 | C | $1,937,340.00 | $1,792,300,653.65 |
| 43 | Jul 19, 2006 | C | $50,000.00 | $1,792,300,653.65 |
| 44 | Jul 31, 2006 | B | $0.00 | $1,792,300,653.65 |
| 45 | Sep 14, 2006 | C | $37,000.00 | $1,792,300,653.65 |
| 46 | Sep 20, 2006 | C | $765,000.00 | $1,792,300,653.65 |
| 47 | Nov 29, 2006 | C | $662,000.00 | $1,792,300,653.65 |
| 48 | Nov 30, 2006 | C | $175,000.00 | $1,792,300,653.65 |
| 49 | Dec 7, 2006 | C | $726,200.00 | $1,792,300,653.65 |
| 50 | Jan 5, 2007 | M | $0.00 | $1,792,300,653.65 |
| 52 | Jan 16, 2007 | C | $1,000,000.00 | $1,792,300,653.65 |
| 53 | Feb 23, 2007 | C | $600,000.00 | $1,792,300,653.65 |
| 54 | Mar 20, 2007 | C | $3,000,000.00 | $1,792,300,653.65 |
| 55 | Jun 7, 2007 | B | $261,000.00 | $1,792,300,653.65 |
| 56 | Jun 14, 2007 | M | $0.00 | $1,792,300,653.65 |
| 57 | Jul 3, 2007 | C | $500,000.00 | $1,792,300,653.65 |
| 58 | Jul 19, 2007 | C | $75,000.00 | $1,792,300,653.65 |
| 59 | Jul 31, 2007 | C | $1,567,500.00 | $1,792,300,653.65 |
| 60 | Aug 21, 2007 | C | $208,466.00 | $1,792,300,653.65 |
| 61 | Sep 20, 2007 | C | $25,000.00 | $1,792,300,653.65 |
| 62 | Oct 10, 2007 | C | $88,000.00 | $1,792,300,653.65 |
| 63 | Oct 12, 2007 | C | $1,600,000.00 | $1,792,300,653.65 |
| 64 | Nov 15, 2007 | C | $282,000.00 | $1,792,300,653.65 |
| 65 | Nov 21, 2007 | M | $0.00 | $1,792,300,653.65 |
| 66 | Nov 27, 2007 | C | $700,000.00 | $1,792,300,653.65 |
| 67 | Dec 13, 2007 | C | $800,000.00 | $1,792,300,653.65 |
| 68 | Jan 3, 2008 | C | $1,173,444.00 | $1,792,300,653.65 |
| 69 | Jan 29, 2008 | C | $9,000,000.00 | $1,792,300,653.65 |
| 70 | Mar 17, 2008 | C | $480,000.00 | $1,792,300,653.65 |
| 71 | Mar 25, 2008 | C | $99,357.00 | $1,792,300,653.65 |
| 72 | Apr 22, 2008 | C | $332,000.00 | $1,792,300,653.65 |
| 73 | May 20, 2008 | B | $0.00 | $1,792,300,653.65 |
| 74 | May 22, 2008 | M | $0.00 | $1,792,300,653.65 |
| 75 | Jul 1, 2008 | C | $3,009,000.00 | $1,792,300,653.65 |
| 76 | Aug 28, 2008 | C | $42,441.30 | $1,792,300,653.65 |
| 77 | Sep 25, 2008 | C | $53,732.28 | $1,792,300,653.65 |
| 78 | Sep 30, 2008 | C | $8,635.26 | $1,792,300,653.65 |
| 79 | Oct 29, 2008 | B | $2,500,000.00 | $1,792,300,653.65 |
| 80 | Dec 11, 2008 | C | $3,200,000.00 | $1,792,300,653.65 |
| 81 | Dec 18, 2008 | C | $200,000.00 | $1,792,300,653.65 |
| 82 | Feb 2, 2009 | C | $85,700.00 | $1,792,300,653.65 |
| 83 | Mar 9, 2009 | C | $500,000.00 | $1,792,300,653.65 |
| 84 | Mar 13, 2009 | C | $750,000.00 | $1,792,300,653.65 |
| 85 | Mar 20, 2009 | C | $1,980,000.00 | $1,792,300,653.65 |
| 86 | Apr 22, 2009 | C | $3,199,000.00 | $1,792,300,653.65 |
| 87 | Jun 16, 2009 | M | $0.00 | $1,792,300,653.65 |
| 88 | Jun 29, 2009 | C | $500,098.00 | $1,792,300,653.65 |
| 89 | Jul 9, 2009 | C | $6,474,300.00 | $1,792,300,653.65 |
| 90 | Oct 8, 2009 | C | $157,000.00 | $1,792,300,653.65 |
| 91 | Oct 29, 2009 | M | $0.00 | $1,792,300,653.65 |
| 92 | Nov 2, 2009 | C | $1,000,000.00 | $1,792,300,653.65 |
| 93 | Nov 9, 2009 | C | $1,216,598.68 | $1,792,300,653.65 |
| 94 | Dec 3, 2009 | C | $1,200,482.00 | $1,792,300,653.65 |
| 95 | Dec 28, 2009 | C | $2,000,000.00 | $1,792,300,653.65 |
| 96 | Jan 15, 2010 | C | $0.00 | $1,792,300,653.65 |
| 97 | Jan 22, 2010 | C | $3,300,000.00 | $1,792,300,653.65 |
| 98 | Feb 26, 2010 | M | $0.00 | $1,792,300,653.65 |
| 99 | Mar 23, 2010 | C | $12,997,000.00 | $1,792,300,653.65 |
| 100 | Apr 8, 2010 | B | $0.00 | $1,792,300,653.65 |
| 101 | Jun 8, 2010 | M | $0.00 | $1,792,300,653.65 |
| 102 | Aug 5, 2010 | C | $1,083,369.00 | $1,792,300,653.65 |
| 103 | Sep 29, 2010 | C | $500,000.00 | $1,792,300,653.65 |
| 104 | Oct 1, 2010 | C | $2,000,000.00 | $1,792,300,653.65 |
| 105 | Oct 7, 2010 | C | $2,642,300.00 | $1,792,300,653.65 |
| 106 | Nov 22, 2010 | C | $810,000.48 | $1,792,300,653.65 |
| 107 | Dec 2, 2010 | M | $1,000,000.00 | $1,792,300,653.65 |
| 108 | Dec 13, 2010 | C | $2,300,000.00 | $1,792,300,653.65 |
| 109 | Jan 4, 2011 | C | $1,000,000.00 | $1,792,300,653.65 |
| 110 | Jan 21, 2011 | C | $1,231,295.00 | $1,792,300,653.65 |
| 111 | Feb 9, 2011 | C | $2,350,000.00 | $1,792,300,653.65 |
| 112 | Feb 24, 2011 | C | $2,900,000.00 | $1,792,300,653.65 |
| 113 | Mar 24, 2011 | C | $2,000,000.00 | $1,792,300,653.65 |
| 114 | May 2, 2011 | C | $1,100,000.00 | $1,792,300,653.65 |
| 115 | May 19, 2011 | C | $465,000.00 | $1,792,300,653.65 |
| 116 | May 23, 2011 | C | $4,285,000.00 | $1,792,300,653.65 |
| 117 | Jun 21, 2011 | B | $0.00 | $1,792,300,653.65 |
| 118 | Jun 23, 2011 | M | $0.00 | $1,792,300,653.65 |
| 119 | Jun 29, 2011 | C | $5,200,000.00 | $1,792,300,653.65 |
| 120 | Aug 22, 2011 | C | $3,305,695.00 | $1,792,300,653.65 |
| 121 | Sep 6, 2011 | C | $2,900,000.00 | $1,792,300,653.65 |
| 122 | Sep 27, 2011 | C | $1,700,000.00 | $1,792,300,653.65 |
| 123 | Nov 16, 2011 | C | $2,600,000.00 | $1,792,300,653.65 |
| 124 | Dec 16, 2011 | B | $3,037,953.00 | $1,792,300,653.65 |
| 125 | Jan 25, 2012 | C | $8,700,000.00 | $1,792,300,653.65 |
| 126 | Apr 6, 2012 | M | $0.00 | $1,792,300,653.65 |
| 127 | Apr 12, 2012 | C | $15,000,000.00 | $1,792,300,653.65 |
| 128 | Jun 20, 2012 | C | $2,000,000.00 | $1,792,300,653.65 |
| 129 | Jul 13, 2012 | C | $2,500,000.00 | $1,792,300,653.65 |
| 130 | Aug 16, 2012 | C | $5,000,000.00 | $1,792,300,653.65 |
| 131 | Dec 6, 2012 | C | $7,100,000.00 | $1,792,300,653.65 |
| 132 | Feb 20, 2013 | B | $0.00 | $1,792,300,653.65 |
| 133 | Mar 20, 2013 | C | $4,000,000.00 | $1,792,300,653.65 |
| 134 | Apr 15, 2013 | C | $4,000,000.00 | $1,792,300,653.65 |
| 135 | May 20, 2013 | C | $4,106,500.00 | $1,792,300,653.65 |
| 136 | Jun 12, 2013 | B | $6,000,000.00 | $1,792,300,653.65 |
| 137 | Aug 27, 2013 | C | $5,922,672.00 | $1,792,300,653.65 |
| 138 | Sep 23, 2013 | C | $8,000,000.00 | $1,792,300,653.65 |
| 139 | Dec 2, 2013 | C | $7,000,000.00 | $1,792,300,653.65 |
| 140 | Jan 13, 2014 | M | $0.00 | $1,792,300,653.65 |
| 141 | Jan 24, 2014 | B | $0.00 | $1,792,300,653.65 |
| 142 | Feb 11, 2014 | C | $3,900,000.00 | $1,792,300,653.65 |
| 143 | Mar 10, 2014 | C | $23,069,000.00 | $1,792,300,653.65 |
| 144 | Jun 4, 2014 | B | $0.00 | $1,792,300,653.65 |
| 145 | Jul 29, 2014 | C | $7,354,000.00 | $1,792,300,653.65 |
| 146 | Sep 25, 2014 | C | $3,000,000.00 | $1,792,300,653.65 |
| 147 | Oct 16, 2014 | C | $10,300,000.00 | $1,792,300,653.65 |
| 149 | Dec 4, 2014 | C | $6,000,000.00 | $1,792,300,653.65 |
| 150 | Jan 8, 2015 | C | $5,000,000.00 | $1,792,300,653.65 |
| 151 | Jan 29, 2015 | C | $6,000,000.00 | $1,792,300,653.65 |
| 152 | Feb 9, 2015 | C | $15,767,000.00 | $1,792,300,653.65 |
| 148 | Mar 3, 2015 | D | $0.00 | $1,792,300,653.65 |
| 153 | May 21, 2015 | C | $17,078,400.00 | $1,792,300,653.65 |
| 154 | Jun 24, 2015 | M | $0.00 | $1,792,300,653.65 |
| 155 | Jul 21, 2015 | C | $2,030,000.00 | $1,792,300,653.65 |
| 156 | Sep 16, 2015 | C | $4,976,413.00 | $1,792,300,653.65 |
| 157 | Oct 16, 2015 | C | $8,700,000.00 | $1,792,300,653.65 |
| 158 | Dec 7, 2015 | C | $3,250,000.00 | $1,792,300,653.65 |
| 159 | Dec 22, 2015 | C | $4,000,000.00 | $1,792,300,653.65 |
| 160 | Jan 15, 2016 | C | $7,000,000.00 | $1,792,300,653.65 |
| 161 | Feb 3, 2016 | M | $6,000,000.00 | $1,792,300,653.65 |
| 162 | Feb 12, 2016 | D | $0.00 | $1,792,300,653.65 |
| 163 | Mar 2, 2016 | C | $22,000,000.00 | $1,792,300,653.65 |
| 164 | Jun 23, 2016 | C | $12,360,893.00 | $1,792,300,653.65 |
| 165 | Sep 16, 2016 | C | $9,624,466.00 | $1,792,300,653.65 |
| 166 | Oct 11, 2016 | B | $15,000,000.00 | $1,792,300,653.65 |
| 167 | Dec 22, 2016 | C | $23,300,000.00 | $1,792,300,653.65 |
| 168 | Mar 16, 2017 | B | $0.00 | $1,792,300,653.65 |
| 169 | Mar 28, 2017 | C | $24,000,000.00 | $1,792,300,653.65 |
| 170 | May 2, 2017 | M | $0.00 | $1,792,300,653.65 |
| 171 | Jun 1, 2017 | M | $0.00 | $1,792,300,653.65 |
| 172 | Jul 18, 2017 | M | $0.00 | $1,792,300,653.65 |
| 173 | Jul 19, 2017 | C | $14,638,198.00 | $1,792,300,653.65 |
| 174 | Sep 18, 2017 | D | $0.00 | $1,792,300,653.65 |
| 175 | Sep 21, 2017 | C | $15,020,973.00 | $1,792,300,653.65 |
| 176 | Nov 2, 2017 | C | $18,000,000.00 | $1,792,300,653.65 |
| 177 | Dec 21, 2017 | C | $10,000,000.00 | $1,792,300,653.65 |
| 178 | Feb 22, 2018 | M | $0.00 | $1,792,300,653.65 |
| 180 | Mar 26, 2018 | C | $31,124,871.00 | $1,792,300,653.65 |
| 179 | Apr 3, 2018 | L | $0.00 | $1,792,300,653.65 |
| 181 | Apr 17, 2018 | B | $0.00 | $1,792,300,653.65 |
| 182 | Aug 2, 2018 | C | $10,000,000.00 | $1,792,300,653.65 |
| 183 | Sep 11, 2018 | C | $85,100,000.00 | $1,792,300,653.65 |
| 184 | Oct 1, 2018 | M | $0.00 | $1,792,300,653.65 |
| 185 | Nov 26, 2018 | B | $0.00 | $1,792,300,653.65 |
| 186 | Nov 26, 2018 | B | $10,820,000.00 | $1,792,300,653.65 |
| 187 | Dec 11, 2018 | B | $0.00 | $1,792,300,653.65 |
| 188 | Feb 13, 2019 | C | $17,000,000.00 | $1,792,300,653.65 |
| 189 | Jul 16, 2019 | M | $0.00 | $1,792,300,653.65 |
| 190 | Jul 31, 2019 | C | $70,728.56 | $1,792,300,653.65 |
| 191 | Sep 13, 2019 | C | $37,838,958.00 | $1,792,300,653.65 |
| 192 | Jan 15, 2020 | C | $11,266,751.00 | $1,792,300,653.65 |
| 193 | Apr 23, 2020 | B | $38,733,249.00 | $1,792,300,653.65 |
| 194 | Aug 31, 2020 | M | $0.00 | $1,792,300,653.65 |
| 195 | Sep 9, 2020 | B | $75,075,000.00 | $1,792,300,653.65 |
| 196 | Nov 13, 2020 | B | $0.00 | $1,792,300,653.65 |
| 197 | Jan 11, 2021 | B | $423,000.00 | $1,792,300,653.65 |
| 198 | Mar 25, 2021 | Y | $0.00 | $1,792,300,653.65 |
| 199 | May 3, 2021 | B | $0.00 | $1,792,300,653.65 |
| 200 | Jun 17, 2021 | C | $20,000,000.00 | $1,792,300,653.65 |
| 201 | Aug 6, 2021 | M | $0.00 | $1,792,300,653.65 |
| 202 | Sep 15, 2021 | M | $0.00 | $1,792,300,653.65 |
| 203 | Sep 28, 2021 | C | $35,886,694.44 | $1,792,300,653.65 |
| 204 | Oct 12, 2021 | B | $0.00 | $1,792,300,653.65 |
| 205 | Oct 22, 2021 | M | $1,334,000.00 | $1,792,300,653.65 |
| 206 | Jan 26, 2022 | C | $3,028,487.00 | $1,792,300,653.65 |
| 207 | Jan 31, 2022 | M | $19,900,000.00 | $1,792,300,653.65 |
| 208 | Apr 20, 2022 | M | $0.00 | $1,792,300,653.65 |
| 209 | May 16, 2022 | B | $21,512,981.00 | $1,792,300,653.65 |
| 273 | Jun 2, 2022 | C | $19,000,000.00 | $1,792,300,653.65 |
| 210 | Jun 30, 2022 | C | $20,000,000.00 | $1,792,300,653.65 |
| 211 | Jul 21, 2022 | M | $15,000,000.00 | $1,792,300,653.65 |
| 212 | Sep 14, 2022 | M | $25,000,000.00 | $1,792,300,653.65 |
| 213 | Sep 23, 2022 | C | $39,000,000.00 | $1,792,300,653.65 |
| 214 | Oct 18, 2022 | D | $0.00 | $1,792,300,653.65 |
| 215 | Dec 9, 2022 | M | $0.00 | $1,792,300,653.65 |
| 216 | Dec 29, 2022 | M | $0.00 | $1,792,300,653.65 |
| 217 | Mar 2, 2023 | M | $25,000,000.00 | $1,792,300,653.65 |
| 218 | May 23, 2023 | M | $0.00 | $1,792,300,653.65 |
| 219 | May 24, 2023 | M | $23,000,000.00 | $1,792,300,653.65 |
| 220 | Jul 7, 2023 | M | $131,593.96 | $1,792,300,653.65 |
| 221 | Jul 12, 2023 | C | $113,688.00 | $1,792,300,653.65 |
| 222 | Aug 8, 2023 | M | $0.00 | $1,792,300,653.65 |
| 223 | Aug 29, 2023 | M | $25,000,000.00 | $1,792,300,653.65 |
| 224 | Aug 29, 2023 | C | $30,000,000.00 | $1,792,300,653.65 |
| 225 | Sep 19, 2023 | C | $1,000,000.00 | $1,792,300,653.65 |
| 226 | Oct 25, 2023 | M | $0.00 | $1,792,300,653.65 |
| 227 | Jan 10, 2024 | M | $10,000.00 | $1,792,300,653.65 |
| 228 | Jan 23, 2024 | C | $25,000,000.00 | $1,792,300,653.65 |
| 229 | Feb 27, 2024 | M | $10,000,000.00 | $1,792,300,653.65 |
| 230 | Apr 30, 2024 | M | $3,200,000.00 | $1,792,300,653.65 |
| 231 | May 16, 2024 | M | $25,000,000.00 | $1,792,300,653.65 |
| 232 | Jun 4, 2024 | M | $0.00 | $1,792,300,653.65 |
| 233 | Jul 8, 2024 | M | $0.00 | $1,792,300,653.65 |
| 234 | Jul 17, 2024 | M | $0.00 | $1,792,300,653.65 |
| 235 | Jul 31, 2024 | A | $0.00 | $1,792,300,653.65 |
| 236 | Aug 2, 2024 | M | $0.00 | $1,792,300,653.65 |
| 237 | Aug 9, 2024 | C | $794,014.98 | $1,792,300,653.65 |
| 238 | Aug 9, 2024 | C | $71,639,538.00 | $1,792,300,653.65 |
| 239 | Aug 15, 2024 | M | $0.00 | $1,792,300,653.65 |
| 240 | Sep 12, 2024 | M | $0.00 | $1,792,300,653.65 |
| 241 | Sep 19, 2024 | M | $7,000,000.00 | $1,792,300,653.65 |
| 242 | Oct 4, 2024 | M | $0.00 | $1,792,300,653.65 |
| 243 | Dec 13, 2024 | B | $0.00 | $1,792,300,653.65 |
| 244 | Dec 19, 2024 | C | $12,000,000.00 | $1,792,300,653.65 |
| 245 | Jan 28, 2025 | M | $15,000,000.00 | $1,792,300,653.65 |
| 246 | Jan 28, 2025 | C | $8,900,000.00 | $1,792,300,653.65 |
| 247 | Feb 27, 2025 | M | $0.00 | $1,792,300,653.65 |
| 248 | Mar 11, 2025 | C | $12,000,000.00 | $1,792,300,653.65 |
| 249 | Mar 25, 2025 | M | $0.00 | $1,792,300,653.65 |
| 250 | Apr 16, 2025 | M | $0.00 | $1,792,300,653.65 |
| 251 | Apr 23, 2025 | M | $10,000,000.00 | $1,792,300,653.65 |
| 252 | Apr 29, 2025 | M | $12,000,000.00 | $1,792,300,653.65 |
| 253 | Apr 30, 2025 | M | $0.00 | $1,792,300,653.65 |
| 254 | May 2, 2025 | C | $7,250,000.00 | $1,792,300,653.65 |
| 255 | May 30, 2025 | C | $5,872.00 | $1,792,300,653.65 |
| 256 | Jun 10, 2025 | L | $0.00 | $1,792,300,653.65 |
| 257 | Jun 11, 2025 | C | $35,056,408.07 | $1,792,300,653.65 |
| 258 | Jun 27, 2025 | C | $10,136,584.00 | $1,792,300,653.65 |
| 259 | Jul 18, 2025 | C | $10,121,913.00 | $1,792,300,653.65 |
| 260 | Sep 11, 2025 | M | $0.00 | $1,792,300,653.65 |
| 261 | Sep 11, 2025 | C | $20,721,329.11 | $1,792,300,653.65 |
| 262 | Dec 2, 2025 | C | $20,000,000.00 | $1,792,300,653.65 |
| 263 | Jan 13, 2026 | M | $0.00 | $1,792,300,653.65 |
| 264 | Jan 21, 2026 | M | $0.00 | $1,792,300,653.65 |
| 265 | Jan 27, 2026 | C | $13,100,000.00 | $1,792,300,653.65 |
| 266 | Feb 9, 2026 | D | $0.00 | $1,792,300,653.65 |
| 267 | Feb 19, 2026 | C | $15,020,483.00 | $1,792,300,653.65 |
| 268 | Mar 19, 2026 | D | $0.00 | $1,792,300,653.65 |
| 269 | Mar 26, 2026 | C | $16,000,000.00 | $1,792,300,653.65 |
| 270 | May 13, 2026 | M | $0.00 | $1,792,300,653.65 |
| 271 | May 19, 2026 | B | $0.00 | $1,792,300,653.65 |
| 272 | May 22, 2026 | C | $30,000,000.00 | $1,792,300,653.65 |
| 274 | Jun 11, 2026 | M | $0.00 | $1,792,300,653.65 |
| 275 | Jun 11, 2026 | C | $264,521.37 | $1,792,300,653.65 |
| 276 | Jul 30, 2026 | C | $39,960,405.37 | $1,792,300,653.65 |
Provenance
Which source record produced each displayed rollup figure.
| Field | Source | File | Retrieved | Parser | Artifact hash |
|---|---|---|---|---|---|
| awarding_agency_id | USAspending.gov | — | Aug 10, 2026 | usaspending_contract_csv@2026.08.2 | 11bd8e835184 |
| contractor_id | USAspending.gov | — | Aug 10, 2026 | usaspending_contract_csv@2026.08.2 | 11bd8e835184 |
| current_award_value | USAspending.gov | — | Aug 10, 2026 | usaspending_contract_csv@2026.08.2 | 11bd8e835184 |
| naics_code | USAspending.gov | — | Aug 10, 2026 | usaspending_contract_csv@2026.08.2 | 11bd8e835184 |
| potential_award_value | USAspending.gov | — | Aug 10, 2026 | usaspending_contract_csv@2026.08.2 | 11bd8e835184 |
| psc_code | USAspending.gov | — | Aug 10, 2026 | usaspending_contract_csv@2026.08.2 | 11bd8e835184 |
| total_obligated | USAspending.gov | — | Aug 10, 2026 | usaspending_contract_csv@2026.08.2 | 11bd8e835184 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
This page is a record of one federal award, assembled from the transactions the government published against it. Note 1 describes where the rollup came from. Values are award values, not unit prices.
- 1Rollup values derive from 252 transaction records parsed from USAspending.gov, retrieved Aug 10, 2026 by transform awards@2026.08.1.
- 2Obligations are the sum of signed federal action obligations across all transactions; deobligations are negative and remain negative.
- 3Current and potential award values are taken from the latest reported action, not summed across modifications.