PSC code
ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING
- PSC code
- C211
- Latest action
- Aug 7, 2026
- p10
- $78,151
- p25
- $140,812
- p75
- $1,026,176
- p90
- $1,728,462
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| N4425522F4035 P454 MULTI MISSION DRY DOCK - PERFORM BIO-ASSAY TESTING IN SUPPORT OF PERMITTING OF M2D2 CONSTRUCTION, KITSAP, BREMERTON. | WSM PACIFIC SIOP, A JOINT VENTURE | Department of Defense | WA | Mar 2, 2026 | $249,779,629 |
| SAQMMA17C0244 ADDITION OF FUNDS FOR REA 175 AND RFP 119C. | PERINI MANAGEMENT SERVICES, INC. | Department of State | — | Apr 28, 2026 | $125,880,217 |
| GS11P08MKC0080 ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. | ZIMMER GUNSUL FRASCA ARCHITECTS LLP | General Services Administration | DC | Mar 10, 2026 | $123,836,350 |
| 15F06724C0001249 NATIONAL SECURITY & INTELLIGENCE CENTER OF EXCELLENCE (NS&I COE) DESIGN BUILD CONTRACT | BL HARBERT INTERNATIONAL LLC | Department of Justice | AL | Sep 13, 2024 | $83,263,878 |
| VA101CFMP0162 THE PURPOSE OF THIS MODIFICATION IS A TO REFLECT LABOR ESCALATION COSTS FOR CPS DUE TO PERIOD OF PERFORMANCE IS EXTENDED TO MARCH 31, 2027, AE CONTRACT FOR SAN FRANCISCO VAMC. | SKIDMORE, OWINGS & MERRILL LLP | Department of Veterans Affairs | CA | Apr 14, 2026 | $39,719,330 |
| 19AQMM21F1496 THIS IS A NO-COST PERIOD OF PERFORMANCE. | MCDONOUGH BOLYARD PECK, INC. | Department of State | VA | Apr 9, 2026 | $38,319,800 |
| SAQMMA16F1961 ADDITIONAL DESIGN SERVICES FOR THE TEGUCIGALPA NEW EMBASSY COMPOUND (NEC) | SHOP ARCHITECTS, INC. | Department of State | — | Jul 13, 2026 | $34,849,038 |
| VA101CFMP0088 THIS CONTRACT MODIFICATION IS TO PROVIDE ADDITIONAL CONSTRUCTION PERIOD SERVICES (CPS) FOR LIVERMORE PHASE A, CONTRACT VA101CFM-P-0088 MOD A00070, VAMC, LIVERMORE, CA. | HDR ARCHITECTURE, INC. | Department of Veterans Affairs | CA | Apr 17, 2026 | $28,377,154 |
| 19AQMM18F2818 FUNDING ONLY TITLE 2 SERVICES FOR MILAN NCC | SHOP ARCHITECTS, INC. | Department of State | NY | Jun 10, 2026 | $26,897,768 |
| N6945024C0014 ADD DESIGN STAGE SERVICES TO BASE CONTRACT | BURNS & MCDONNELL ENGINEERING COMPANY, INC. | Department of Defense | SC | Apr 16, 2026 | $22,580,770 |
| W912BV25FA069 MARINE CORPS INSTALLATION COMMAND MASTER PLANNING SUPPORT | HDR ENGINEERING, INC. | Department of Defense | CO | Mar 10, 2026 | $20,839,640 |
| N6945020F0195 HURRICANE SALLY REPAIRS - MODIFICATION FOR A NEW STRUCTURAL ASSESSMENT OF HANGAR 3260 AND THE STRUCTURAL REPAIRS TO HANGAR 3260 REPACKAGED AS A STANDALONE DESIGN-BUILD REQUEST FOR PROPOSAL | SCHMIDT-PRIME GROUP, LLC | Department of Defense | FL | Apr 13, 2026 | $19,148,792 |
| 140R6025F0014 THIS MODIFICATION ADDS IN-SITU DENSITY TESTING USING THE NUCLEAR DENSITY METHOD FOR 49 TEST PITS TO SUPPORT GEOTECHNICAL INVESTIGATION AND FLEXIBLE PIPELINE DESIGN. | FORSGREN ASSOCIATES INC | Department of the Interior | CO | Mar 24, 2026 | $19,016,413 |
| GS03P17AZC0008 THIS MODIFICAITON HEREBY INCORPORATE'S ENNEAD'S PROPOSAL, DATED 4/27/26, FOR ADDING CA SERVICES FOR THE RAMBO ELEVATOR PROJECT IN HARRISBURG, PA. | ENNEAD ARCHITECTS LLP | General Services Administration | NY | Jul 13, 2026 | $17,727,380 |
| W9127824F0103 THE A-E IS RESPONSIBLE FOR PREPARATION OF A MASTER SITE PLAN FOR PHASES 1-4 AND PLANNING CHARRETTE REPORT (PCR-II) FOR PHASES 1 AND 2 AS BASE BID WITH OPTIONS TO PREPARE 100% DESIGNS FOR PHASES 1 AND 2. | NATIVE TECHNOLOGY SOLUTIONS, LLC | Department of Defense | FL | Apr 27, 2026 | $15,737,301 |
| W912ER19F0130 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 07/31/2026 ON ALL LINE ITEMS. DESCOPE MODS 01 AND 08, ADJUST FUNDING FOR CLINS 0001, 0004, AND 0010. ADDING CLIN 0023 FOR ADDITIONAL FUNDING FOR CLIN 0004. | ATKINSREALIS USA INC. | Department of Defense | VA | Apr 28, 2026 | $15,085,865 |
| W9127824F0117 NAVY PORT OF CALLAO POP MOD | AECOM TECHNICAL SERVICES, INC. | Department of Defense | — | Mar 5, 2026 | $14,450,194 |
| 69056724F00040N WY NPS YELL 12(4), NORTHEAST ENTRANCE ROAD, PHASE 1 INTERMEDIATE THROUGH FINAL DESIGN PHASES | JACOBS ENGINEERING GROUP INC. | Department of Transportation | WA | May 13, 2024 | $12,564,687 |
| FA468620F0134 CONSTRUCTION REQUIREMENT FOR THE DESIGN OF THE REPAIR BLACK WELDER WATER INCLUDES COMPREHENSIVE HYDROLOGY ANALYSIS FOR 8 DAMS, 2 CANALS, 10 BRIDGES, AND REMOVAL AND RESTORATION OF LOWER BLACK WELDER SHED COMPONENTS ALL IN ACCORDANCE WITH THE SOW/SON. | REID MIDDLETON, INC. | Department of Defense | CA | Mar 19, 2026 | $12,286,194 |
| N6274222F0355 FY23 AIRCRAFT PARKING APRON, RAAF DARWIN, AUSTRALIA: MOD P00006 - ADDITIONAL DESIGN SUPPORT FOR ASBESTOS CONTAINING MATERIAL MITIGATION. | GHD SETIADI KAULA JOINT VENTURE | Department of Defense | — | Mar 18, 2026 | $12,213,417 |
| N6247820F4349 N6247820F4349, FY22 SPECIAL PROJECT RM17-1007 REPAIR WHARVES B20 AND B21, JBPHH, HAWAII. BASE PHASE 2. | MOFFATT & NICHOL - BURNS & MCDONNELL HAWAII | Department of Defense | HI | Mar 2, 2026 | $12,086,561 |
| 19AQMM18F0643 DESIGN SERVICES FOR PORT LOUIS NEC | RICHARD & KENNEDY ARCHITECTS, LLC | Department of State | AZ | May 1, 2026 | $11,797,151 |
| N6247321F4010 P3800 ACC | RLF AND SHERLOCK SMITH AND ADAMS JV | Department of Defense | CA | Mar 17, 2026 | $10,676,694 |
| 47PH0821F0013 THIS MODIFICATION IS TO EXTEND THE ARCHITECTURAL ENGINEERING SERVICES TASK ORDER THREE MONTHS FOR THE REPAIR & ALTERATION PROJECT AT THE HOLLOWAY U.S COURTHOUSE & U.S. POST OFFICE/COURTHOUSE BUILDING IN OKLAHOMA CITY, OK. | POND - FSB A JOINT VENTURE | General Services Administration | OK | Jun 2, 2026 | $10,487,223 |
| FA890323F0038 THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW), SET FORTH AS ATTACHMENT 1 TITLE II OVERSIGHT FOR DLA-E POL REPAIRS AT MULTIPLE EAST, WEST, AND CENTRAL CONUS SITES. | HDR ENGINEERING, INC. | Department of Defense | HI | Mar 31, 2026 | $9,981,177 |
Related records
Derived from awards these records share, ordered by how many.
Benchmarked as
Bought by
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.
- 2Published distribution over 34 awards, computed Aug 10, 2026 (snapshot 415866df1ffe).