PSC code
SPACE VEHICLE COMPONENTS
- PSC code
- 1820
- Latest action
- Aug 5, 2026
Fewer than the minimum comparable awards under this PSC code.
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| MSFC0199911DNAS800016 ACQUISITION OF EXTERNAL TANKS FOR THE SPACE SHUTTLE PROGRAM | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | LA | Mar 3, 2026 | $2,922,489,906 |
| NNJ10TB01C EXTRAVEHICULAR SPACE OPERATIONS | HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC. | National Aeronautics and Space Administration | TX | Mar 26, 2026 | $1,607,542,933 |
| NNM12AA82C INTERIM CRYOGENIC PROPULSION STAGE FOR SLS | THE BOEING COMPANY | National Aeronautics and Space Administration | AL | Sep 28, 2012 | $1,540,101,537 |
| NNG10XA05C THIS MOD FINALIZES AWARD FEE PERIOD 27 FOR J3 & J4 VISIBLE INFRARED IMAGER RADIOMETER (VIRS) INSTRUMENTS AND SUPPORT | RAYTHEON COMPANY | National Aeronautics and Space Administration | CA | Mar 30, 2026 | $1,259,763,043 |
| NNG10XA06C ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE CROSS TRACK INFRARED SOUNDER (CRIS) INSTRUMENT AND SUPPORT. | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | IN | Sep 20, 2010 | $833,924,616 |
| NNG11XA04C THE OVERALL CONTRACT REQUIRES NORTHROP GRUMMAN (NG) TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE JOINT POLAR SATELLITE SYSTEM (JPSS)-1 ADVANCED TECHNOLOGY MICROWAVE SOUNDER (ATMS), JPSS-2 ATMS, JPSS-3 ATMS, JPSS-4 ATMS, AND ATMS ENGINEERING DEVELOPMENT UNIT (EDU) UPGRADE - QUICKSOUNDER | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | CA | Mar 19, 2026 | $611,992,541 |
| NNG10XA01C ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT. | BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | National Aeronautics and Space Administration | CO | Mar 3, 2026 | $499,666,379 |
| NNG12FD66C THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | CO | Apr 22, 2026 | $456,973,860 |
| JSC00199710DNAS997150 TAS::80 0115::TAS GAS CHROMATOGRAPH -MASS SPECTROMETER PER | HAMILTON SUNDSTRAND CORPORATIO | National Aeronautics and Space Administration | CT | Mar 4, 2026 | $347,137,718 |
| NNG09EK34C THE PURPOSE OF THIS MODIFICATION IS TO EXECUTE AN UNPRICED CHANGE ORDER FOR PHASE F SCOPE, TO BE DEFINITIZED LATER RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUTION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK. | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | CO | Mar 24, 2026 | $305,897,900 |
| NNJ06GA16C ENERGIA WILL PROVIDE HARDWARE AND SERVICES THAT SUPPORT INTERNATIONAL SPACE STATION | S P KOROLEV ROCKET AND SPACE PUBLIC CORPORATION ENERGIA | National Aeronautics and Space Administration | — | Mar 30, 2026 | $211,997,090 |
| NNG09FA40C INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | CA | Sep 30, 2009 | $198,769,611 |
| NNG10EK25C SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | TX | Jul 14, 2026 | $63,385,698 |
| NNG13FC02C THE CONTRACTOR SHALL PROVIDE FLIGHT DYNAMICS SYSTEM AND OPERATIONAL SUPPORT FOR THE ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY REGOLITH & APOPHIS EXPLORER (OSIRIS-REX, -APEX) MISSION FOR THE SAMPLE RETURN OF ASTEROIDS | KINETX INC | National Aeronautics and Space Administration | AZ | May 18, 2026 | $42,837,101 |
| NNG09EK06C THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION | UNIVERSITY OF CALIFORNIA, LOS ANGELES | National Aeronautics and Space Administration | CA | Jun 3, 2026 | $37,337,616 |
| NNM15AA15C MARSHALL GRAZING INCIDENT X-RAY SPECTROMETER (MAGIXS) | SMITHSONIAN INSTITUTION | National Aeronautics and Space Administration | MA | Jul 15, 2026 | $1,735,368 |
Related records
Derived from awards these records share, ordered by how many.
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.