PSC code
SPACE VEHICLE COMPONENTS
- PSC code
- 1820
- Latest action
- Sep 16, 2026
Fewer than the minimum comparable awards under this PSC code.
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| MSFC0199911DNAS800016 ACQUISITION OF EXTERNAL TANKS FOR THE SPACE SHUTTLE PROGRAM | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | LA | Mar 3, 2026 | $2,922,489,906 |
| NNJ10TB01C EXTRAVEHICULAR SPACE OPERATIONS CONTRACT (ESOC) | HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC. | National Aeronautics and Space Administration | TX | Sep 30, 2010 | $1,607,542,933 |
| NNM12AA82C INTERIM CRYOGENIC PROPULSION STAGE FOR SLS | THE BOEING COMPANY | National Aeronautics and Space Administration | AL | Sep 28, 2012 | $1,539,113,847 |
| NNG10XA05C ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE VISIBLE INFRARED IMAGER RADIOMETER (VIRS) INSTRUMENT AND SUPPORT. | RAYTHEON COMPANY | National Aeronautics and Space Administration | CA | Sep 22, 2010 | $1,259,763,043 |
| NNG10XA06C ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE CROSS TRACK INFRARED SOUNDER (CRIS) INSTRUMENT AND SUPPORT. | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | IN | Sep 20, 2010 | $833,924,616 |
| NNG11XA04C THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. | NORTHROP GRUMMAN SYSTEMS CORPORATION | National Aeronautics and Space Administration | CA | Sep 13, 2011 | $611,992,541 |
| NNG10XA01C ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT. | BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | National Aeronautics and Space Administration | CO | Sep 10, 2010 | $499,668,300 |
| NNG12FD66C THE CONTRACTOR SHALL PROVIDE RESOURCES NECESSARY TO SUPPORT ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH AND -APOPHIS EXPLORER (OSIRIS-REX,-APEX) PROJECT FOR THE SAMPLE RETURN OF ASTEROIDS. | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | CO | Apr 22, 2026 | $456,973,860 |
| JSC00199710DNAS997150 TAS::80 0115::TAS GAS CHROMATOGRAPH -MASS SPECTROMETER PER | HAMILTON SUNDSTRAND CORPORATIO | National Aeronautics and Space Administration | CT | Mar 4, 2026 | $347,137,718 |
| NNG09EK34C RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK. | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | CO | Apr 2, 2009 | $305,897,900 |
| NNJ06GA16C ENERGIA WILL PROVIDE HARDWARE AND SERVICES THAT SUPPORT INTERNATIONAL SPACE STATION | S P KOROLEV ROCKET AND SPACE PUBLIC CORPORATION ENERGIA | National Aeronautics and Space Administration | — | Mar 30, 2026 | $211,997,090 |
| NNG09FA40C INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | CA | Sep 30, 2009 | $198,769,611 |
| NNG10EK25C SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | TX | Jul 14, 2026 | $63,385,698 |
| NNG13FC02C THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, CODE, INTEGRATE AND TEST THE OSIRIS-REX FLIGHT DYNAMICS SYSTEM TO SUPPORT THE OSIRIS-REX LAUNCH AND FLIGHT OPERATIONS TO RETRIEVE A SAMPLE OF THE NEO AND RETURN THE SAMPLE TO EARTH. AFTER LAUNCH, KINETX SHALL PROVIDE OPERATIONS SUPPORT FOR 30 DAYS. THE SCOPE OF THIS SOW COVERS PHASE C/D OF THE OSIRIS-REX LIFE CYCLE. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. | KINETX INC | National Aeronautics and Space Administration | AZ | Jun 1, 2013 | $42,837,101 |
| NNG09EK06C DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT | UNIVERSITY OF CALIFORNIA, LOS ANGELES | National Aeronautics and Space Administration | CA | Jan 1, 2009 | $37,337,616 |
| NNM15AA15C MARSHALL GRAZING INCIDENT X-RAY SPECTROMETER (MAGIXS) | SMITHSONIAN INSTITUTION | National Aeronautics and Space Administration | MA | Jul 15, 2026 | $1,735,368 |
| F0470186C0022 SPACE VEHICLE COMPONENTS | NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | CA | Jul 15, 1987 | $0 |
Related records
Derived from awards these records share, ordered by how many.
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Sep 24, 2026. Miscoded awards stay miscoded here; we do not reassign codes.