PSC code
COMBAT, ASSAULT, AND TACTICAL VEHICLES, TRACKED
- PSC code
- 2350
- Latest action
- Sep 14, 2026
Fewer than the minimum comparable awards under this PSC code.
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| W56HZV17C0001 SPHS PRODUCTION | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 12, 2026 | $2,875,520,055 |
| W56HZV23C0024 EARLY ORDER MATERIAL IN SUPPORT OF THE FUTURE PURCHASE OF 197 AMPVS AND FACILITY CAPACITY EXPANSION EFFORTS TO INCREASE THE AMPV PRODUCTION RATE TO 197 VEHICLES PER YEAR. SUPPORTS UKRAINE EFFORTS. | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 3, 2023 | $2,479,580,090 |
| W56HZV15CA001 THIS ACTION IS COST PLUS INCENTIVE-FEE (CPIF) 52 MONTH ENGINEERING AND MANUFACTURING DEVELOPMENT CONTRACT, WITH THREE FIXED PRICE INCENTIVE (SUCCESSIVE TARGETS) (FPI(S)) OPTION YEARS OF LOW RATE INITIAL PRODUCTION (LRIP) FOR THE ARMORED MULTI-PURPOSE VEHICLE (AMPV) REQUIREMENT. THE AMPV FAMILY OF VEHICLES (FOV) IS A MATERIEL SOLUTION REPLACEMENT FOR THE M113 FOV TO MITIGATE CURRENT AND FUTURE CAPABILITY GAPS IN FORCE PROTECTION, MOBILITY, RELIABILITY, AND INTEROPERABILITY BY MISSION ROLE VARIANT TO SUPPORT THE ARMORED BRIGADE COMBAT TEAM (ABCT) ACROSS THE SPECTRUM OF CONFLICT. THE AMPV FOV WILL REPLACE THE FIVE MISSION ROLES CURRENTLY PERFORMED BY THE M113 FOV BY TRANSFERRING THE CURRENT M113 MISSION EQUIPMENT PACKAGES (MEP) TO A NEW VEHICLE PLATFORM. THE AMPV VEHICLE FLEET WILL CONSIST OF THE FOLLOWING FIVE VARIANTS TAILORED TO SPECIFIC MISSION ROLES WITHIN ABCT: GENERAL PURPOSE (GP) VEHICLE MISSION COMMAND (MCMD) VEHICLE MORTAR CARRIER (MC) VEHICLE MEDICAL EVACUATION (ME) VEHICLE AND MEDICAL TREATMENT (MT) VEHICLE. A TOTAL QUANTITY OF 29 VEHICLES WILL BE DELIVERED DURING EMD (INCLUDING SYSTEM SUPPORT PACKAGES, SPECIAL TOOLS AND TEST EQUIPMENT, AND BALLISTIC HULLS), WITH 52 (LRIP OPTION YEAR 1), 105 (LRIP OPTION YEAR 2), AND 130 (LRIP OPTION YEAR 3) VEHICLES ANTICIPATED DURING THE LRIP OPTION YEARS. RANGE PRICING IS INCLUDED IN THE CONTRACT FOR OPTION PERIODS 2 AND 3. | BAE SYSTEMS LAND AND ARMAMENTS L.P. | Department of Defense | PA | Dec 23, 2014 | $2,006,654,646 |
| W56HZV19C0036 UPDATED THE CONDITIONAL ACCEPTANCE FOR ALL LRIP 1 VEHICLES. | GENERAL DYNAMICS LAND SYSTEMS INC. | Department of Defense | MI | Mar 13, 2026 | $1,350,971,927 |
| W56HZV07C0096 MODIFICATION P00267 IS TO CONVERT CONTRACTOR ACQUIRED PROPERTY (CAP) UNDER W56HZV-07-C-0096 FOR TRANSFER AS GOVERNMENT FURNISHED PROPERTY (GFP) INTO CONTRACT W56HZV-22-C-0072 AT NO ADDITIONAL COST. | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | CA | Apr 30, 2026 | $1,261,334,950 |
| W56HZV22F0353 PRODUCTION OF 250 M1A2 SEPV3 ABRAMS TANKS FOR POLAND | GENERAL DYNAMICS LAND SYSTEMS INC. | Department of Defense | MI | May 1, 2026 | $1,167,292,894 |
| W912CH25F0096 THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS. | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 11, 2026 | $1,080,945,590 |
| W56HZV23F0395 HE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS. | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 25, 2026 | $895,701,646 |
| W56HZV18C0133 A4 UCA FOR PRODUCTION OF 164 BRADLEY M2A4 AND M7A4 VEHICLES | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Jun 14, 2018 | $816,970,968 |
| W912CH24F0170 SPHS PRODUCTION CONTRACT | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 12, 2026 | $798,670,653 |
| W56HZV19F0358 ABRAMS REQUIREMENTS CONTRACT, PRODUCTION TANK UPGRADES. THIS MODIFICATION DEOBLIGATES CLINS 0082AC AND 0092AC AS PART OF CREDIT FOR TRANSFERRED PROPERTY. | GENERAL DYNAMICS LAND SYSTEMS INC. | Department of Defense | MI | Apr 14, 2026 | $775,109,855 |
| W56HZV23C0026 ADMINISTRATIVE CHANGES TO THE PHASE 3 AND 4 DEVELOPMENT OF THE OPTIONALLY MANNED FIGHTING VEHICLE. | AMERICAN RHEINMETALL VEHICLES, LLC | Department of Defense | MI | Mar 3, 2026 | $697,724,218 |
| W56HZV23C0025 PHASE 3 AND 4 DEVELOPMENT WITH 7 PROTOTYPE DELIVERABLES OF THE OPTIONALLY MANNED FIGHTING VEHICLE. | GENERAL DYNAMICS LAND SYSTEMS INC. | Department of Defense | MI | Jun 26, 2023 | $679,159,184 |
| W912CH25F0270 M109A7 FOV FY25 PRODUCTION - MODIFICATION TO | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 12, 2026 | $405,256,848 |
| W56HZV17C0242 CONTRACTOR ACQUIRED PROPERTY TRANSFER | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 3, 2026 | $387,098,705 |
| W56HZV22F0140 ABRAMS REQUIREMENTS CONTRACT, PRODUCTION UPGRADE M1A1 TANKS TO SEPV3. | GENERAL DYNAMICS LAND SYSTEMS INC. | Department of Defense | MI | Apr 14, 2026 | $375,071,802 |
| W56HZV12C0358 ENGINEERING DESIGN, LOGISTICS, TEST, AND EVALUATION SUPPORT (R&D PHASE) OF THE BRADLEY ECP EFFORT. | BAE SYSTEMS LAND AND ARMAMENTS L.P. | Department of Defense | MI | Sep 14, 2012 | $324,894,838 |
| 0036 STRYKER VEHICLE | GM GDLS DEFENSE GROUP, L.L.C. | Department of Defense | MI | Jun 26, 2007 | $298,938,782 |
| W56HZV24F0149 PRODUCTION OF ROMANIAN SEPV3 ABRAMS FAMILY OF VEHICLES | GENERAL DYNAMICS LAND SYSTEMS INC. | Department of Defense | MI | Mar 13, 2026 | $292,155,765 |
| W912CH26F0026 ABRAMS REQUIREMENTS CONTRACT, M1A1 VEHICLES UPGRADED TO SEPV3 VARIANT. MODIFICATION TO UPDATE UNIT PRICES TO CORRECT ROUNDING. | GENERAL DYNAMICS LAND SYSTEMS INC. | Department of Defense | MI | Mar 24, 2026 | $210,349,722 |
| W56HZV22F0413 CONTRACT W56HZV22D0083, DELIVERY ORDER W56HZV22F0413 DESCRIPTION OF REQUIREMENT IS FOR THE OVERALL ACTION NOT FOR THE MOD ITSELF. | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Mar 2, 2026 | $196,299,231 |
| W56HZV23C0015 PRODUCTION OF 26 M88A2 COMBAT RECOVERY VEHICLES FOR FMS | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | AL | Dec 6, 2022 | $128,557,867 |
| W912CH25F0040 DELIVERY ORDER FOR 36 CATV GP UNDER CONTRACT W56HZV-22-D-0082 | BAE SYSTEMS LAND AND ARMAMENTS L.P. | Department of Defense | — | Oct 31, 2024 | $113,313,501 |
| W56HZV23C0078 M88A2 - UCA CONTRACT AWARD | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Sep 1, 2023 | $107,617,952 |
| W912CH26C0020 PROCUREMENT OF M88A2 HERCULES VEHICLES | BAE SYSTEMS LAND & ARMAMENTS L.P. | Department of Defense | PA | Dec 22, 2025 | $85,719,592 |
Related records
Derived from awards these records share, ordered by how many.
Benchmarked as
Bought by
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Sep 24, 2026. Miscoded awards stay miscoded here; we do not reassign codes.