Contractor
EBL ENGINEERS, LLC
- UEI
- J4KBAQR8KGG6
- Parent UEI
- J4KBAQR8KGG6
- Resolved by
- uei
- Confidence
- 1.000
Active from May 21, 2025 to Aug 7, 2026.
What they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Engineering Services | 1 | $0 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 47QSMS25D008V FEDERAL SUPPLY SCHEDULE CONTRACT | General Services Administration | — | May 21, 2025 | — |
| 68HERC21D0013 C1DB - ARCHITECT-ENGINEER (A/E) IDIQ CONTRACT FOR THE STATES COVERED BY EPA REGIONS 1 THROUGH 4 | Environmental Protection Agency | — | Jul 20, 2026 | — |
| 89303024FMA400870 ADMINISTRATIVE ACTION | Department of Energy | DC | Jul 17, 2026 | $100,000 |
| 47PM0425D0020 INCORPORATING FAR 52.222-90 UNDER EO 14398 | General Services Administration | — | Jul 16, 2026 | — |
| 75N99024A00015 NIH IS SOLICITING A NON-PERSONAL SERVICES CONTRACT FROM HOSPITAL FACILITIES SUPPORT SERVICES PROVIDER (SP) WITH EXPERTISE, RELEVANT EXPERIENCE, PROVEN RECORD IN SUCCESSFULLY SUPPORTING OVERSIGHT OF FACILITIES FIRE & LIFE SAFETY SYSTEM OPERATION, | Department of Health and Human Services | — | Jul 15, 2026 | — |
| 140F0822D0227 THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT, CLARIFY ORDERING | Department of the Interior | — | Mar 26, 2026 | — |
| 47PF0019D0050 INCORPORATING FAR 52.222-90 UNDER EO 14398 | General Services Administration | — | Jul 1, 2026 | — |
| 140P2125F0211 EO 14398 FFP -- THE CONTRACTOR SHALL PROVIDE ALL LABOR FOR A/E SERVICES NECESSARY TO COMPLETE DESIGN OF FILENE CENTER FIRE SUPPRESSION SYSTEM REMODEL AT WOLF TRAP NATIONAL PARK, IN ACCORDANCE WITH THE STATEMENT OF WORK SENT WITH THE RFQ DATED 9/16/20 | Department of the Interior | VA | Jun 11, 2026 | $196,366 |
| 47PM1124F0005 NO COST TIME EXTENSION OF POP FROM 10/21/2026 THROUGH 1/29/2027 | General Services Administration | MD | May 8, 2026 | $146,923 |
| FA706023F0106 B56 RENOVATE POOL AND POOL HOUSE DESIGN IAW THE STATEMENT OF ARCHITECT AND ENGINEERING SERVICES (SAES). | Department of Defense | DC | May 6, 2026 | $553,735 |
| 47PC5426F0169 FDA-CDER 1ST & 2ND FLOOR MULTIPLE LABS PROJECT, 391 CALENDAR DAYS... FDA WHITE OAK, SILVER SPRING, MD | General Services Administration | MD | Apr 22, 2026 | $106,216 |
| 05GA0A24K0119 CONSTRUCTION ADMINISTRATION AND COMMISSIONING SERVICES FOR 1ST FL HVAC UPGRADES ZONES 2 5 AND 7 PERIOD OF PERFORMANCE SEPTEMBER 16, 2024 THRU SEPTEMBER 30, 2025 ZONE 7 SEPTEMBER 30, 2024 THRU JUNE 4, 2025 | Government Accountability Office | MD | Apr 21, 2026 | $275,607 |
| W912DR24F0381 SCOPE OF ARCHITECT/ENGINEER (A/E) SERVICES FOR THE DESIGN-BID-BUILD (DBB) ACQUISITION OF INSCOM FORT BELVOIR BLDG 712 AND BLDG 766 FIRE SUPPRESSION DESIGN FORT BELVOIR, VIRGINIA | Department of Defense | DC | Apr 15, 2026 | $336,974 |
| FA461025F0057 XUMU 24-3201, AIRFIELD DISTRICT PLAN (DP), VANDENBERG SFB, CA. THE ARCHITECT-ENGINEER (A-E) SHALL CONDUCT FIELD INVESTIGATIONS AND DEVELOP A COMPLETE AND USABLE AIRFIELD DISTRICT PLAN IN ACCORDANCE WITH STATEMENT OF WORK DATED 11 DECEMBER 2024. | Department of Defense | CA | Apr 1, 2026 | $676,895 |
| FA706026F0039 THE REQUIREMENT IS TO OBTAIN ARCHITECT-ENGINEER (A-E) DESIGN SERVICES FOR THE NECESSARY UPGRADES, REPAIRS, AND A NEW HIGH-VOLTAGE REDUNDANCY CONNECTION FOR ELECTRICAL SWITCHING STATIONS B18 AND B168 ON JOINT BASE ANACOSTIA-BOLLING (JBAB). | Department of Defense | DC | Mar 25, 2026 | $2,406,671 |
| W912DR22F0338 EXPEDITIONARY PROTOTYPE FACILITY (EPF), PAX RIVER, NAVAL AIR STATION, LEXINGTON PARK, MD | Department of Defense | MD | Mar 16, 2026 | $271,432 |
| 140PS126F0021 TITLE III A&E SUPPORT SERVICES FOR FORD'S THEATRE | Department of the Interior | DC | Mar 12, 2026 | $78,497 |
| W912DR24F0268 NRL B-216 CHILLERS, TRANSFORMER REPLACEMENT (PW 6759, 6760), NAVAL RESEARCH LABORATORY (NRL), DC | Department of Defense | MD | Mar 5, 2026 | $207,969 |
| FA706025F0157 THE REQUIREMENT IS TO OBTAIN ARCHITECT-ENGINEER (A-E) SERVICES TO DEVELOP A DETAILED WORK PLAN OUTLINING PROCESSES AND METHODS FOR SURVEYING 136 BUILDINGS AND INVENTORYING BACKFLOW PREVENTERS ON JOINT BASE ANACOSTIA-BOLLING (JBAB). | Department of Defense | DC | Mar 3, 2026 | $301,786 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier J4KBAQR8KGG6, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.