Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| W9128F23F0065 PROVIDE 150MW OF POWER TO THE GRID AT PALO SECO POWER PLANT IN PUERTO RICO | WESTON SOLUTIONS INC | Department of Defense | PR | Mar 26, 2026 | $816,199,719 |
| W9128F23F0089 TEMPORARY POWER - SAN JUAN POWER PLANT - REA SETTLEMENT | WESTON SOLUTIONS INC | Department of Defense | PR | Mar 26, 2026 | $668,946,805 |
| W912EP22C0008 CR00011 - DOOR CHANGES. CHANGE OF THE ORIGINAL SPECIFIED DOORS MATERIAL, TYPE, FIRE RATING, DOOR FRAME, AND HARDWARE SET. | 4CONTRACTOR JV | Department of Defense | PR | Apr 2, 2026 | $294,110,597 |
| N6945022F0358 THE PURPOSE OF THIS MODIFICATION IS EXTEND THE CONTRACT COMPLETION DATE FROM MARCH 31, 2026 TO APRIL 27,2026 EXTENDING THE PERIOD OF PERFORMANCE BY 27 CALENDAR DAYS AND TO INCLUDE A PC INVOLVING ADDED WORK TO THE CONTRACT FOR PC097- B458 DEMO HEATER | ENVIRONMENTAL CHEMICAL CORPORATION | Department of Defense | FL | Apr 15, 2026 | $104,622,453 |
| W912QR24C0011 MOD A00003 TO WIDEN THE GTEB UTILITY TRENCH FROM 3 FEET TO 5 FEET. | WALSH CONSTRUCTION COMPANY II, LLC | Department of Defense | MI | Mar 17, 2026 | $99,226,973 |
| N4008519F6466 CONTRACT N62470-19-D-8023, N4008519F6466 GEIGER QUAD REPAIRS, PROJECT NO. FLO-190077 | APTIM FEDERAL SERVICES, LLC | Department of Defense | NC | Apr 20, 2026 | $82,560,916 |
| N6247826F0043 FY 2026 MCON PROJECT P-1013 - DESIGN DDG-1000 SHIP SUPPORT INFRASTRUCTURE UPGRADE, JOINT BASE PEARL HARBOR-HICKAM (JBPHH), HAWAII | NAN INC | Department of Defense | HI | Mar 4, 2026 | $66,250,100 |
| N6247825F0008 P935 ELECTRICAL DISTRIBUTION SYSTEM MODERNIZATION OPTION CLIN 1, OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE-ITEM IAO $785,849.00 | NAN INC | Department of Defense | HI | Mar 16, 2026 | $60,277,292 |
| N4008515C7701 UESC ANNUAL PAYMENT | PIEDMONT NATURAL GAS COMPANY, INC. | Department of Defense | NC | Apr 8, 2026 | $59,571,020 |
| 140P2023C0028 NAMA 216042 LINCOLN MEMORIAL REHABILITATION MODIFICATION 59 WORK ASSOCIATED WITH RFPS 223, 228, 229, 235, 237, 239, 241 AND 242 | CONSIGLI CONSTRUCTION CO., INC. | Department of the Interior | DC | Mar 10, 2026 | $57,375,012 |
| N6945022C0074 THIS MODIFICATION IS TO INCORPORATE SCOPE OF WORK ADDITION FOR BUILDING 1982 AND BUILDING 3713. | CCI GENERAL CONTRACTORS, LLC | Department of Defense | FL | Apr 1, 2026 | $57,364,590 |
| 140P2024C0054 GOGA 311373 ALCATRAZ PRISON HOSPITAL WING SEISMIC AND STABILIZE POCS: CO, JOHN_FIFE@NPS.GOV, CS, GABRIEL_CASTELLANOS@NPS.GOV | TUTOR PERINI CORPORATION | Department of the Interior | CA | Jun 28, 2024 | $50,786,320 |
| FA890325F0101 THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 16 JUNE 2025, BARRIER SYSTEM PROJECT AT RAF LAKENHEATH, UNITED KINGDOM, PROJECT NUMBERS: MSET 22-3003PA MSET 22-3003. | PERINI MANAGEMENT SERVICES, INC. | Department of Defense | — | Mar 10, 2026 | $48,201,584 |
| W912GB15C0007 CR048 EMERGENCY SEWER CLEANING CR049 FPCON GATE ACCESS DELAYSCR050 MISC MECH CHANGESCR051 REV RADIANT PANEL MOUNTINGCR052 REV WAREHOUSE SPRINKLER SYSTEMCR053 ADD BMS REQUIREMENTSCR054 ADDITIONAL FPCON EXERCISE DELAYSCR055 MISC. CIVIL CHANGES | BUNDESAMT FÜR BAUWESEN UND RAUMORDNUNG | Department of Defense | — | Mar 5, 2026 | $46,790,715 |
| 89243324CFE000088 COMPUTATIONAL SCIENCE AND ENGINEERING FACILITY MODIFICATION 0002 - THE PURPOSE OF THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE AND CHANGE THE CONTRACTING OFFICERS REPRESENTATIVE (COR). SBA REQUIREMENT #QR1701437364V | SILVER LAKE CONSTRUCTION LLC | Department of Energy | WV | Apr 17, 2026 | $45,624,446 |
| N3319122F4371 FY22 SPECIAL PROJECT RM17-2790, RENOVATE NAS II JOINT INTELLIGENCE CENTER BUILDING 639, NAVAL AIR STATION, SIGONELLA, ITALY | CH2M HILL CONSTRUCTORS, INC. | Department of Defense | — | Apr 10, 2026 | $40,647,599 |
| N6945023F0991 TRITON MAINTENANCE TRAINING FACILITY (TMTF) | RQ CONSTRUCTION, LLC | Department of Defense | FL | Mar 11, 2026 | $39,247,823 |
| FA520526C0002 PROJECT NO. QKKA171017, ADD/REPAIR FITNESS CENTER, B622, MISAWA AIR BASE, JAPAN | CMS K.K. | Department of Defense | — | Mar 2, 2026 | $37,000,744 |
| N4008520F4102 TIME EXTENSION, UPDATE WAWF CLAUSE ROUTING TABLE, INCORPORATE FAR 52.232-37 MULTIPLE PAYMENT ARRANGEMENTS. | APTIM FEDERAL SERVICES, LLC | Department of Defense | NC | Mar 12, 2026 | $36,867,137 |
| W912QR21C0018 THE SCOPE OF THIS CONTRACT INCLUDES THE DESIGN AND RENOVATION OF BUILDING B200 AND ASSOCIATED SITE IMPROVEMENTS, COMPLETE WITH SUFFICIENT SPACE WITH UP-TO-DATE FURNISHINGS AND EQUIPMENT TO SUPPORT THE NEEDS OF THE ARMY RESERVE TRAINING CENTER. | AMERESCO INC | Department of Defense | KY | Apr 23, 2026 | $35,030,546 |
| N6247324F4525 THE PURPOSE OF THIS MODIFICATION IS TO FURNISH AND REPLACE A NEW STOREFRONT SYSTEM AT BUILDING BEQ 1666 LOCATED AT MARINE AIR GROUND TASK FORCE TRAINING COMMAND/MARINE CORPS AIR GROUND COMBAT CENTER (MAGTFTC/MCAGCC). | KORTE CONSTRUCTION COMPANY | Department of Defense | CA | Apr 1, 2026 | $34,835,698 |
| N4008422F4517 THE CONTRACTOR SHALL FURNISH ALL LABOR MATERIAL EQUIPMENT, TRANSPORTATION AND SUPERVISION NECESSARY TO PERFORM THE EXTERIOR WALL REPAIR AS ADDITIONAL WORK IN CONSIDERATION FOR ADDITIONAL 268 DAYS . CONTRACT COMPLETION DATE WILL BE 24 AUGUST 2026. | MIRAIT.ONE- ACTY JV | Department of Defense | — | Apr 9, 2026 | $33,791,597 |
| N6247325F4372 N62473-24-D-5234/N6247325F4372 B464/B465 REPLACE HVAC PC000003 ADD OPTION 0005 REMOVE AND DISPOSE OF HAZARDOUS SOILS, WATER, AND MATERIALS | RQ CONSTRUCTION, LLC | Department of Defense | CA | Mar 5, 2026 | $33,533,921 |
| W912DW22C0011 REA - WALL FINISH CONTRACT FOR FY22 1SFG BARRACKS (B9176)REPAIR BUILDING 09176, PERMANENT PARTY UH ON JOINT BASE LEWIS-MCCHORD, WASHINGTONREFERENCE NO. R00025 | JABEZ-ABSHER SMALL BUSINESS JOINT VENTURE | Department of Defense | WA | Mar 3, 2026 | $32,715,839 |
| W912QR24C0034 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGESTHE FOLLOWING HAVE BEEN ADDED BY FULL TEXT:DESCRIPTION OF CHANGE R10003 (CR003-2) FINAL PART II REDUCE OFFICE COUNT FLOOR PLANE1. SCOPE:IT HAS BEEN DETERMINED NECESSARY AND IN THE | GBA BUILDERS LLC | Department of Defense | IA | Mar 18, 2026 | $32,601,317 |
Related records
Derived from awards these records share, ordered by how many.
Benchmarked as
Bought by
Performed in
- California128
- Maryland110
- Florida95
- Texas85
- North Carolina81
- Virginia80
- New Jersey62
- Kentucky50
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.
- 2Published distribution over 26 awards, computed Aug 10, 2026 (snapshot fce366b0a45b).