PSC code
ARCHITECT AND ENGINEERING- CONSTRUCTION: SHIP CONSTRUCTION AND REPAIR FACILITIES
- PSC code
- C1ED
- Latest action
- May 6, 2026
Fewer than the minimum comparable awards under this PSC code.
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| N6274223F0301 THE ARCHITECT-ENGINEER SHALL PREPARE THE 65%-FINAL DESIGN PHASE AND OTHER SERVICES AS REQUESTED BY THIS TASK ORDER, P-676 POLARIS POINT SUBMARINE PIER, NAVAL BASE GUAM. | MNDPI PACIFIC JV | Department of Defense | GU | Apr 28, 2026 | $58,314,366 |
| N6274223F0336 TASK ORDER MODIFICATION NO. N6274223F0336-P00002, PCAS PHASE 3 FOR FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR-HICKAM, HAWAII. | MNDPI PACIFIC JV | Department of Defense | HI | Apr 20, 2026 | $31,015,251 |
| N4425524F4143 STRUCTURAL ASSESSMENT OF DD1 MECHANICAL TUNNEL AND LATERAL | WSP USA INC | Department of Defense | WA | May 4, 2026 | $13,948,403 |
| 47QFLA21F0039 SBIR PHASE III TASK ORDER NAVY COLD SPRAY CELLS | VRC METAL SYSTEMS, LLC | General Services Administration | DC | Jan 29, 2021 | $6,367,448 |
| W912BU23F0011 NO COST TIME EXTENSION MODIFIACTION | BRUCE S ROSENBLATT & ASSOCIATES LLC | Department of Defense | TN | Mar 10, 2026 | $2,184,034 |
| N4425524F5006 THIS TASK ORDER IS TO UPDATE THE INSTALLATION DEVELOPMENT PLAN (IDP) IN ACCORDANCE WITH CURRENT PRIORITIES AND GUIDANCE. THIS IDP INCLUDES CONSIDERATIONS FOR NAVAL STATION EVERETT SPECIAL AREAS AND UP TO FOUR AREA DEVELOPMENT PLANS (ADP). | MAKERS ARCHITECTURE AND URBAN DESIGN LLP | Department of Defense | WA | Apr 21, 2026 | $1,015,906 |
| W912BU24F0021 SOO AREA LIFT FLOATING CRANE 3489 NCTE 3 | THE SHEARER GROUP, INC. | Department of Defense | TX | Apr 3, 2026 | $843,500 |
| W912BU26FA019 TO 16 CEMVN UNIT C SPUDBARGE REPLACEMENT BARGE DESIGN DRAWINGS AND CALCULATIONS 3450 | THE SHEARER GROUP, INC. | Department of Defense | TX | May 6, 2026 | $797,500 |
| N4425523F4476 NO-COST TIME-ONLY MODIFICATION TO EXTEND THE CONTRACT COMPLETION DATE. | FATHOM ARCHITECTURE, LLC | Department of Defense | WA | Apr 1, 2026 | $667,372 |
| N4425519F4474 ARCHITECT-ENGINEER POST CONSTRUCTION AWARD SERVICES SUPPORTING P400. | WSP USA INC | Department of Defense | WA | Mar 27, 2026 | $538,829 |
| W912BU25FA021 SHEARER TO 12 LRB KOLBER EQUIPMENT RELOCATE 3503 | THE SHEARER GROUP, INC. | Department of Defense | OH | Mar 20, 2026 | $464,000 |
| W912BU24F0041 TSG 9-3 CELRE SOO STOP LOG BARGES NCTE#3 3553 | THE SHEARER GROUP, INC. | Department of Defense | TX | Apr 22, 2026 | $384,000 |
| W912BU26FA001 TO 16 ESSAYONS RESCUE BOAT DAVIT DESIGN 3560 | BRUCE S ROSENBLATT & ASSOCIATES LLC | Department of Defense | OR | Apr 8, 2026 | $144,223 |
| W912BU22F0092 DE-OBLIGATION OF $31,741.00 FROM THIS TASK ORDER | BRUCE S ROSENBLATT & ASSOCIATES LLC | Department of Defense | OR | Apr 27, 2026 | $120,923 |
| W912QR26PA024 CELRL M/V JACKIE LEE ANDERSON SINKING, MARINE FORENSIC INVESTIGATION (GENERATOR FUEL LINE ANALYSIS SERVICES). | SEA LTD | Department of Defense | IL | Apr 16, 2026 | $99,000 |
| W912BU22D0014 CAPACITY INCREASE FOR IDC | BRUCE S ROSENBLATT & ASSOCIATES LLC | Department of Defense | — | Mar 5, 2026 | — |
| 47QFLA21D0003 SBIR PHASE III IDIQ - COLD SPRAY | VRC METAL SYSTEMS, LLC | General Services Administration | — | Jan 29, 2021 | — |
Related records
Derived from awards these records share, ordered by how many.
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.