PSC code
R&D- SPACE: OTHER (ADVANCED DEVELOPMENT)
- PSC code
- AR93
- Latest action
- May 29, 2026
Fewer than the minimum comparable awards under this PSC code.
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| NNG08FD60C COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. NUSTAR IS A PRINCIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | CA | May 29, 2026 | $149,322,030 |
Related records
Derived from awards these records share, ordered by how many.
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.