Obligated to date
$471,787,8981
Awards
8
Agencies served
2

Active from Sep 5, 2019 to Jul 23, 2026.

Recent awards

AwardAgencyPlaceFirst actionCurrent value
80MSFC19C0042

SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)

National Aeronautics and Space AdministrationCASep 5, 2019$58,791,526
80GSFC18C0011

SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. (NCE)

National Aeronautics and Space AdministrationCAJun 17, 2026$111,084,170
80MSFC20C0043

THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.

National Aeronautics and Space AdministrationCAMar 17, 2026$54,982,511
80GSFC23CA028

TO PROVIDE A HIGH HERITAGE SPACECRAFT BUS AND A WIDE FIELD ULTRAVIOLET TELESCOPE TO CONDUCT A DEEP IMAGING SURVEY OF THE WHOLE SKY IN TWO BANDS OF ULTRAVIOLET LIGHT TO PROVIDE NEW INSIGHTS INTO GALAXY EVOLUTION AND THE LIFECYCLE OF STARS.

National Aeronautics and Space AdministrationCAMay 13, 2026$106,965,269
80GSFC22CA003

REVISED SOW REV D TO SCIENCE SUPPORT CENTER FOR ROMAN PROJECT INCREMENTAL FUNDING

National Aeronautics and Space AdministrationCAJun 2, 2026$53,296,381
NNG08FD60C

COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. NUSTAR IS A PRINCIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.

National Aeronautics and Space AdministrationCAMay 29, 2026$149,322,030
N6523623C8001

REALIGN FUNDING FROM CLIN 0002 TO 0003.

Department of DefenseCAMar 17, 2026$13,421,871
HR001122C0054

NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D)

Department of DefenseCAMar 12, 2026$5,026,632

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.

  1. 1Awards are attributed by Unique Entity Identifier U2JMKHNS5TG4, the government's own recipient identifier, not by name matching.
  2. 2Award records from USAspending.gov, last refreshed Aug 10, 2026.
CALIFORNIA INSTITUTE OF TECHNOLOGY federal contracts · BidBenchmark