Contractor
EA ENGINEERING, SCIENCE, AND TECHNOLOGY, INC., PBC
- UEI
- LEEMJD9WKDC9
- Parent UEI
- PEMXBCN41KT3
- Resolved by
- uei
- Confidence
- 1.000
Active from Mar 23, 2015 to Oct 16, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Commercial Building Construction | 5 | $765,483 |
| Engineering Services | 3 | $183,627 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 68HE0724F0147 R7 RES WASHINGTON COUNTY LEAD DISTRICT, OLD MINES, POTOSI, AND FURNACE CREEK SUPERFUND SITES OU1 RESIDENTIAL SOILS REMEDIATION WASHINGTON COUNTY, MISSOURI | Environmental Protection Agency | MO | Sep 13, 2024 | $12,578,621 |
| 47QRCA25DU110 ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC) | General Services Administration | — | Dec 17, 2024 | — |
| 68HE0524F0082 SFGLAES: LRROC PHASE II- RD SUPPORT, RA ENGINEERING AND QA CONSTRUCTION OVERSIGHT SUPPORT IN THE ROUGE RIVER AOC | Environmental Protection Agency | MI | Aug 1, 2024 | $1,076,170 |
| 47QRCA25DS007 ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) SMALL BUSINESS MULTIPLE AGENCY CONTRACT (MAC) | General Services Administration | — | Dec 19, 2024 | — |
| 68HE0924F0101 RAF ESO TASK ORDER LORENTZ BARREL AND DRUM OVERSIGHT AND RA SUPPORT | Environmental Protection Agency | CA | Sep 30, 2024 | $3,257,425 |
| 47QRAA19D005G FEDERAL SUPPLY SCHEDULE CONTRACT | General Services Administration | — | Mar 5, 2019 | — |
| 68HE0321F0071 DES TO NEWARK SOUTH GROUNDWATER PLUME SUPERFUND SITE | Environmental Protection Agency | DE | Sep 24, 2021 | $4,718,414 |
| 68HE0120F0034 REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), ISSUANCE OF A NEW TASK ORDER FOR THE BJAT SUPERFUND SITE. | Environmental Protection Agency | MA | Jul 30, 2020 | $1,720,498 |
| 68HE0320F0065 03S2 CROSSLEY FARM, 0U-2 LTRA, ESO SUITE | Environmental Protection Agency | PA | Jul 31, 2020 | $3,138,288 |
| 68HE0325F0095 EAST BASIN ROAD GROUNDWATER (A36K) OU01 $1,000,000.00 DES/EA ENGINEERING, CONTRACT: 68HE0318D0005, TASK ORDER: NEW GOVT RIFS: TO AWARD OF A NEW DES TASK ORDER FOR THE EAST BASIN ROAD GROUNDWATER SUPERFUND SITE. THIS WORK WILL INCLUDE A REMEDIAL IN | Environmental Protection Agency | PA | Sep 30, 2025 | $10,212,096 |
| 68HE0326F0132 NEW DES TO: FULTON AVE OU2 RD $483,211.14 FULTON AVE OU2 RD NEW DES TASK ORDER IN THE AMOUNT OF $483,211.14 ON BASE CLIN 0001. THE PERIOD OF PERFORMANCE IS 24 MONTHS. STATEMENT OF WORK TASKS: TASK 1 - GENERAL REQUIREMENTS SUBTASK 1.1 1.1: S | Environmental Protection Agency | NY | Sep 28, 2026 | $483,211 |
| 68HE0326F0136 THE PURPOSE OF THIS TASK ORDER IS TO SUPPORT THE DESIGN AND ENGINEERING SERVICES (DES) EFFORT FOR THE ROBINTECH, INC./NATIONAL PIPE COMPANY SUPERFUND SITE OPERABLE UNIT 1 (OU1) BY ASSEMBLING AND PROVIDING THE FULL SET OF DRAFT BASE DOCUMENTS NEEDED T | Environmental Protection Agency | NY | Sep 28, 2026 | $1,536,044 |
| 6913G626P800003 KINNEYTOWN ELUTRIATE ANALYSIS CONTRACT FOR EPA REGION 1 TBA PROGRAM FOR SITE AT KINNEYTOWN DAM, CT | Department of Transportation | CT | Nov 4, 2025 | $18,972 |
| 68HE0521F0150 TASK ORDER OTTAWA TOWNSHIP | Environmental Protection Agency | MD | Sep 27, 2021 | $179,961 |
| 0128 IGF::OT::IGF WILCOX OIL CO RI/FS NEW TASK ORDER FUNDING-CONTRACT NO. EP-W-06-004 | Environmental Protection Agency | TX | Sep 24, 2015 | $2,548,938 |
| 68HE0826F0065 REMEDIAL DESIGN ACTIVITIES FOR BILLINGS PCE SUPERFUND SITE OPERABLE UNIT 1 (OU1) | Environmental Protection Agency | CO | Sep 26, 2026 | $2,030,464 |
| 68HE0621F0028 LANE PLATING WORKS SUPERFUND SITE RAF DES TASK ORDER | Environmental Protection Agency | TX | Aug 23, 2021 | $1,223,595 |
| 68HE0925F0097 SELMA PRESSURE TREATING SUPERFUND SITE THROUGH SITE-SPECIFIC TECHNICAL ASSISTANCE TO CONDUCT EPA-LEAD REMEDIAL INVESTIGATION/FEASIBILITY STUDY, ENGINEERING EVALUATION AND COST ANALYSIS, AND/OR REMOVAL ACTION PHASES AS REQUIRED BY THE COMPREHENSIVE EN | Environmental Protection Agency | CA | Sep 29, 2025 | $4,722,929 |
| 68HE0626F0028 RAF DES WILCOX OIL DES - NEW TASK ORDER REQUEST FOR WILCOX OIL COMPANY REMEDIAL INVESTIGATION AND FEASIBILITY STUDY (RI/FS). | Environmental Protection Agency | OK | Sep 22, 2026 | $1,719,295 |
| 68HE0324F0075 THIS IS A REMEDIATION ACTION FRAMEWORK (RAF) REMEDIATION ENVIRONMENTAL SERVICES (RES) TASK ORDER (TO) TO PROVIDE REMEDIATION TO SOURCE MATERIAL AND PRINCIPAL THREAT WASTE IN OPERABLE UNIT 2 (OU2) CONTAMINATED SOILS AND SEDIMENTS AT THE JACKSON CERAMI | Environmental Protection Agency | PA | Sep 26, 2024 | $68,392,409 |
| 68HE0522F0134 AWARD OF DES TASK ORDER DONNELSVILE CONTAMINATED AQUIFER SUPERFUND SITE | Environmental Protection Agency | OH | Sep 21, 2022 | $5,916,920 |
| 68HE0318D0005 REMEDIAL ACQUISITION FRAMEWORK - RAF, DESIGN AND ENGINEERING SERVICES - DES. THE DES CONTRACT WILL PROVIDE SERVICES TO SUPPORT EPAS CLEANUP PROGRAMS, PRIMARILY THE SUPERFUND PROGRAM. THIS CONTRACT REQUIRES THE CONTRACTOR TO FURNISH ALL NECESSARY PERSONNEL WITH THE APPROPRIATE KNOWLEDGE AND EXPERTISE, MATERIALS, EQUIPMENT AND SERVICES OR INCIDENTAL TO PERFORMING AND COMPLETING THE WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE STATEMENT OF WORK. THESE CONTRACTS REQUIRE PERSONNEL TO DELIVER THE FOLLOWING SERVICES: FIELD WORK AND ANALYTICAL SUPPORT, TREATABILITY STUDIES, REMEDIAL INVESTIGATION-FEASIBILITY STUDIES, ENGINEERING EVALUATION-COST ANALYSIS, REMEDIAL DESIGN, OVERSIGHT OR OVERSIGHT SUPPORT AND OTHER GENERAL TECHNICAL ASSISTANCE. | Environmental Protection Agency | — | Sep 30, 2018 | — |
| 68HE0524F0034 THIS REQUIREMENT IS FOR CONSTRUCTION SERVICES ON THE KEYSTONE OU 1 REMEDIAL ACTION SITE IN INDIANAPOLIS, IN. WORK AT THE SITE INVOLVES IN-SITU THERMAL TREATMENT (ISTT). TASK ORDER HAS BEEN AWARDED UNDER CLIN 0002 OF THE REMEDIAL ENGINEERING SERVICES | Environmental Protection Agency | IN | Apr 1, 2024 | $14,483,705 |
| 68HE0526F0141 REGION 6 DONNA CANAL AND RESERVOIR SYSTEM TASK ORDER | Environmental Protection Agency | MD | Sep 15, 2026 | $1,998,743 |
| 68HE0924F0110 RAF-ESO TASK ORDER FOR DATA MANAGEMENT AND TECHNICAL SUPPORT SAN GABRIEL VALLEY DATA MANAGEMENT | Environmental Protection Agency | CA | Sep 30, 2024 | $539,167 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier LEEMJD9WKDC9, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Oct 21, 2026.