PSC code
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- PSC code
- Y1LB
- Latest action
- Sep 22, 2026
- p10
- $98,349
- p25
- $336,601
- p75
- $4,532,338
- p90
- $10,179,463
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| 70B01C26F00000292 BORDER WALL CONSTRUCTION FOR EL PASO SECTOR - EPT-5 | BARNARD CONSTRUCTION COMPANY, INCORPORATED | Department of Homeland Security | TX | Apr 24, 2026 | $1,585,324,926 |
| 70B01C26F00000169 BORDER WALL CONSTRUCTION - VERTICAL BARRIER, BIG BEND TEXAS SECTOR (BBT-2) | FISHER SAND & GRAVEL CO | Department of Homeland Security | TX | Mar 5, 2026 | $1,223,124,000 |
| 70B01C26F00000141 BORDER WALL CONSTRUCTION - VERTICAL BARRIER, DEL RIO TEXAS SECTOR (DRT-4) | BARNARD CONSTRUCTION COMPANY, INCORPORATED | Department of Homeland Security | TX | Mar 5, 2026 | $601,914,474 |
| 70B01C26F00000165 BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4 | GRANITE CONSTRUCTION COMPANY | Department of Homeland Security | TX | Mar 9, 2026 | $515,050,823 |
| N4008522C0017 MODIFICATION ISSUED TO PROVIDE FOR CHANGES ASSOCIATED WITH PCS 93, 94, 96 AND 101, P095 REPLACE SUBMARINE PIER, NAVAL STATION NORFOLK, NORFOLK, VA | RQ-MAGANN JV | Department of Defense | VA | Apr 14, 2026 | $323,731,997 |
| 70B01C26F00000118 MODIFICATION TO INCORPORATE OCEAN WATERBORNE BARRIER FEASIBILITY STUDY. | SPENCER CONSTRUCTION LLC | Department of Homeland Security | TX | Jun 1, 2026 | $260,196,000 |
| 69056723C000008 AK NPS DENA 10(49) POLYCHROME AREA IMPROVEMENTS - PROVIDES COMPENSATION TO THE CONTRACTOR FOR THE WORK ASSOCIATED WITH THE OPTION W3B TEMPORARY LAUNCH TRUSS DESIGN. | GRANITE CONSTRUCTION COMPANY | Department of Transportation | AK | Mar 16, 2026 | $214,934,133 |
| 693C7322C000001 NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL | FORT MYER CONSTRUCTION CORP | Department of Transportation | VA | Dec 7, 2021 | $175,098,589 |
| 70B01C26F00000140 BORDER WALL CONSTRUCTION - WATERBORNE, DEL RIO SECTOR TEXAS (DRT-4) | SPENCER CONSTRUCTION LLC | Department of Homeland Security | TX | Mar 5, 2026 | $173,064,900 |
| 693C7323C000004 NP-COLO 1A21, B42, C18, D51 - CM #6: 693C7323C000004 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT BY $4,094,372.49 FROM $130,116,604.18 TO $134,210,976.67. 2) EXTEND CONTRACT TIME BY 135 DAYS. 3) ADD NEW PAY ITEM | WAGMAN HEAVY CIVIL INC | Department of Transportation | VA | Mar 25, 2026 | $134,210,977 |
| 693C7321C000025 PROJECT VA ST ANC(1): THE PROJECT CONSISTS OF THE REALIGNMENT OF COLUMBIA PIKE AND S. JOYCE STREET, REPLACEMENT OF SOUTHGATE ROAD WITH A NEW SEGMENT OF S. NASH STREET, THE EXPANSION OF FOXCROFT HEIGHTS PARK, AND THE MODIFICATION OF THE COLUMBIA PI | KOKOSING CONSTRUCTION COMPANY, INC. | Department of Transportation | VA | Sep 8, 2021 | $123,933,547 |
| 69056723F00021N WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE | H-K CONTRACTORS, INC. | Department of Transportation | WY | Jan 24, 2023 | $120,930,893 |
| 693C7322C000009 PROJECT NP-BLRI 2B13, 2H17, ETC: THE PROJECT CONSISTS OF THE RECONSTRUCTION AND REHABILITATION OF THE BLUE RIDGE PARKWAY IN NORTH CAROLINA FROM MILEPOST 229.6 TO MP 305.1, INCLUDING OVERLOOKS, PARKING AREAS AND RAMPS. WORK ALSO INCLUDES DRAINAGE ASS | MAYMEAD INC | Department of Transportation | NC | Mar 30, 2022 | $116,153,554 |
| 693C7322C000008 PR ER PRMNT RPR (10) CM #7: 693C7322C000008 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) EXTEND PERIOD OF PERFORMANCE TO MAY 31, 2028 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. | LPC CONTRACTORS INC | Department of Transportation | PR | May 6, 2026 | $84,195,125 |
| 693C7324C000011 NASA WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK, PROJECT NO. VA ST NASA 1(9) - THIS PROJECT CONSISTS OF THE DESIGN AND REPLACEMENT OF THE EXISTING WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK, IN ACCOMACK COUNTY, VIRGINIA. THIS STRUCTURE IS OWNE | KOKOSING CONSTRUCTION COMPANY, INC. | Department of Transportation | VA | Jun 20, 2024 | $72,581,745 |
| 6982AF26C000025 CA NP MOJA 11(2) 10(2) KELSO CIMA & KELBAKER ROADS CONSTRUCTION CONTRACT | AMRIZE SOUTHWEST INC | Department of Transportation | CA | Jul 31, 2026 | $68,441,965 |
| W50UW820F0042 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE COMMISSIONING PERIOD REFERENCE REQUEST FOR PROPOSAL NO. R00021. THECONTRACT COMPLETION DATE IS HEREBY EXTENDED TO 2 JANUARY 2027. SEE ATTACHMENT FOR SCOPE OF WORK. | SOUTHWEST VALLEY CONSTRUCTORS CO | Department of Defense | CA | May 1, 2026 | $66,543,174 |
| W912BV26CA003 FORT GIBSON REPLACE SPILLWAY BRIDGE | ALBERICI CONSTRUCTORS INC | Department of Defense | OK | Mar 27, 2026 | $63,796,000 |
| 69056723C000017 OR NPS CRLA 13(1), REHABILITATE EAST RIM DRIVE | STEVE MANNING CONSTRUCTION INC | Department of Transportation | OR | May 12, 2023 | $58,772,609 |
| 693C7325C000018 THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON | FORT MYER CONSTRUCTION CORP | Department of Transportation | VA | Sep 23, 2025 | $45,686,162 |
| 69056722F000034 WY NPS YELL 10(23), GRAND LOOP ROAD-OLD FAITHFUL TO WEST - CLOSEOUT | H-K CONTRACTORS, INC. | Department of Transportation | WY | Mar 6, 2026 | $44,450,173 |
| 6982AF25C000009 CA FTNP SEKI 13(2) MINERAL KING ROAD ROADWAY REHABILITATION CN CONTRACT | STEVE MANNING CONSTRUCTION INC | Department of Transportation | CA | Dec 23, 2024 | $43,498,884 |
| 693C7323C000017 PROJECT PR ER DOT PRMNT RPR(14): THE PURPOSE OF THIS NO COST MODIFICATION IS TO INCORPORATE NEW FAR CLAUSE 52.222-90 - ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (DEVIATION APR 2026) PURSUANT TO EXECUTIVE ORDER (E.O.) 14398. | LPC CONTRACTORS INC | Department of Transportation | PR | Jul 9, 2026 | $41,115,000 |
| N6945022F0633 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE CONTRACT FROM 27 DECEMBER 2025 TO 21 JANUARY 2026, A TWENTY-FIVE (25) CALENDAR DAY EXTENSION FOR WEATHER DELAYS. ASIS 01 - 08 ARE HEREBY INCORPORATED INTO THIS CONTRACT. | RQ CONSTRUCTION, LLC | Department of Defense | LA | Mar 4, 2026 | $38,555,728 |
| 69056726C000005 CONSTRUCTION SERVICES FOR PROJECT OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS. THE WORK CONSISTS OF AGGREGATE BASE TRAIL RECONSTRUCTION, SLOPE STABILIZATION, SLOPE PROTECTION, WALLS (DRY STACK ROCKERY, SOIL NAIL, GABION, MECHANICALLY | STRIDER CONSTRUCTION CO INC | Department of Transportation | OR | Jan 23, 2026 | $36,717,585 |
Related records
Derived from awards these records share, ordered by how many.
Benchmarked as
Bought by
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Sep 24, 2026. Miscoded awards stay miscoded here; we do not reassign codes.
- 2Published distribution over 439 awards, computed Sep 12, 2026 (snapshot 8dbad364cafa).