PSC code
NON-NUCLEAR SHIP REPAIR (WEST)
- PSC code
- J999
- Latest action
- Aug 7, 2026
Fewer than the minimum comparable awards under this PSC code.
Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| N0002425C4402 TYCOM (1B4B) | VIGOR MARINE LLC | Department of Defense | WA | Feb 27, 2026 | $276,589,352 |
| N0002425C4411 440A - USS GREEN BAY (LPD-20) FY24 DSRA THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCORPORATE REALIGNMENT OF FUNDS. | BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. | Department of Defense | CA | Feb 27, 2026 | $267,174,144 |
| N0002423C4410 N00024-23-C-4410 MOD A00238 TO INCORPORATE REVISED MILESTONE DATES | CONTINENTAL MARITIME OF SAN DIEGO, LLC | Department of Defense | CA | Mar 9, 2026 | $254,008,168 |
| N0002426C4411 USS SAMPSON (DDG 102) FY26 DMP | VIGOR MARINE LLC | Department of Defense | OR | Apr 13, 2026 | $252,871,467 |
| N0002424C4423 CODE 440A: ADMIN MODIFICATION FOR REALIGNMENT OF FUNDS FOR RCC 382G FROM CLIN 0087 TO CLIN 0089. | BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. | Department of Defense | CA | Mar 16, 2026 | $220,262,739 |
| N0002425C4404 CODE 430A,TO ADD NEW WORK, DESCOPE WORK NO LONGER REQUIRED AND INCORPORATE AN ADMIN CHANGE TO THE CLIN DESCRIPTION | NATIONAL STEEL AND SHIPBUILDING COMPANY | Department of Defense | CA | Mar 12, 2026 | $197,796,207 |
| N0002425C4415 C440A - THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE GROWTH WORK RCCS. | BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. | Department of Defense | CA | Mar 6, 2026 | $181,878,869 |
| N4523A25F0302 EXECUTION COST | METRO MACHINE CORP | Department of Defense | WA | Mar 16, 2026 | $178,189,768 |
| N0002425C4419 CODE 440B TO INCORPORATE A MONETARY DEDUCTION IN ACCORDANCE WITH THE QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). | CONTINENTAL MARITIME OF SAN DIEGO, LLC | Department of Defense | CA | Feb 27, 2026 | $118,447,164 |
| N3220526C0006 USNS MERCY (T-AH 19) REGULAR OVERHAUL/DRY DOCKING | VIGOR MARINE LLC | Department of Defense | OR | Mar 25, 2026 | $102,826,973 |
| N0002424C4407 USS JOHN S MCCAIN (DDG 56) FY25 DSRA | VIGOR MARINE LLC | Department of Defense | OR | Mar 16, 2026 | $101,843,217 |
| N0002425C4422 SWRMC C430A USS HARPERS FERRY CONTRACT MODIFICATION TO DESCOPE BASIC WORK REQUIREMENTS | NATIONAL STEEL AND SHIPBUILDING COMPANY | Department of Defense | CA | Mar 12, 2026 | $97,311,816 |
| N0002425C4409 CODE 440B USS GABRIELLE GIFFORDS (LCS-10) FY25 DSRA, N0002425C4409 TO INCORPORATE GROWTH WORK OF RCCS 181G 219G CFR 0144 | VIGOR MARINE LLC | Department of Defense | OR | Mar 9, 2026 | $90,125,191 |
| N0002425C4429 CODE 440B TO INCORPORATE A MONETARY DEDUCTION IN ACCORDANCE WITH THE QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) | CONTINENTAL MARITIME OF SAN DIEGO, LLC | Department of Defense | CA | Mar 5, 2026 | $79,130,119 |
| N0002425C4406 C440A: MODIFICATION TO OBLIGATE AND INCORPORATE FUNDING TO SUPPORT BERTHING HABITABILITY REQUIREMENT IN SUPPORT OF USS O'KANE (DDG 77) FY26 DSRA | BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. | Department of Defense | CA | Mar 5, 2026 | $77,526,202 |
| N3225324F0028 SHIP REPAIR | PACIFIC SHIPYARDS INTERNATIONAL, LLC | Department of Defense | HI | Mar 26, 2026 | $74,429,300 |
| N0002425C4420 CODE 440A, ADMINISTRATIVE MODIFICATION TO INCORPORATE CHANGES TO THE USS SAVANNAH MAINTENANCE AVAILABILITY. | VIGOR MARINE LLC | Department of Defense | OR | Mar 20, 2026 | $65,903,365 |
| N0002426C4409 CODE 440A, BILATERAL MODIFICATION TO EXERCISE OPTIONS, DESCOPE AN LOE CLIN, AND INCORPORATE ADMINISTRATIVE CHANGES FOR THE USS STOCKDALE. | BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. | Department of Defense | CA | Mar 31, 2026 | $64,021,996 |
| N5523625F9922 CODE 460C: USS CARL VINSON (CVN-70) DESCOPE RCCS | HUNTINGTON INGALLS INC | Department of Defense | CA | Mar 2, 2026 | $60,291,805 |
| W56HZV22FL181 PROGRAMMED DRYDOCKING, CLEANING, PAINTING, REPAIRS AND SERVICE LIFE EXTENSION PROGRAM (SLEP) TO U.S. ARMY VESSELS LCU 2029 AND LCU 2035 | BAY SHIP & YACHT CO | Department of Defense | CA | Apr 21, 2026 | $55,657,061 |
| N0002424C4408 CODE 440A, MODIFICATION TO INCORPORATE REPAIRS FOUND IN THE USS MOBILE MAINTENANCE AVAILABILITY. | BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC. | Department of Defense | CA | Mar 5, 2026 | $47,302,396 |
| N3220525C2148 USNS GUADALUPE REGULAR OVERHAUL AND DRY-DOCKING AVAILABILITY | VIGOR MARINE LLC | Department of Defense | OR | Mar 9, 2026 | $46,695,550 |
| N3220526C1201 USNS WASHINGTON CHAMBERS REGULAR OVERHAUL AND DRY-DOCKING. | VIGOR MARINE LLC | Department of Defense | OR | Apr 1, 2026 | $45,568,770 |
| N3220525C4008 USNS EARL WARREN PSA, EXTEND PERIOD OF PERFORMANCE AND INCORPORATE CCOS | VIGOR MARINE LLC | Department of Defense | OR | Mar 9, 2026 | $42,889,376 |
| W56HZV23FL163 PROGRAMMED DRYDOCKING, CLEANING, PAINTING, REPAIRS AND SERVICE LIFE EXTENSION PROGRAM (SLEP) TO U.S. ARMY VESSELS LCU 2022 AND LCU 2027 | YOKOHAMA ENGINEERING WORKS, LTD. | Department of Defense | — | Mar 18, 2026 | $41,825,299 |
Related records
Derived from awards these records share, ordered by how many.
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this PSC code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the PSC code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.