Z1DA--612A4-19-016 | Renovate Outpatient Pharmacy and HVAC

261-NETWORK CONTRACT OFFICE 21 (36C261)

Response status

Historical record

Jul 20, 2026, 5:00 PM UTC

This notice is no longer open.

Posted
Sep 3, 2026
Archive date
Sep 5, 2026
SAM status
Active
This is a preserved solicitation record. The response window is closed because the published deadline passed.

Answer-first brief

What the source record says

  • 261-NETWORK CONTRACT OFFICE 21 (36C261) published this solicitation.
  • The notice uses NAICS 236220 (Commercial and Institutional Building Construction).

Procurement identity

Notice ID
c6d4683b1df847ffbee4dc60be5b32cb
Solicitation
36C26126R0036
Base type
Solicitation
Version
1 of 1

Solicitation facts

Structured fields from the current SAM notice version. A dash means the source did not publish a value.

Notice type
Solicitation
Solicitation number
36C26126R0036
Set-aside
Set-aside code
Posted
Sep 3, 2026
Responses due
Jul 20, 2026, 5:00 PM UTC
Archive date
Sep 5, 2026
Archive type
autocustom
Base type
Solicitation
Organization type
OFFICE
Category confidence
94%
Category source
rule
Last seen
Sep 5, 2026

Buyer and place

Office hierarchy and place of performance as published.

Department
VETERANS AFFAIRS, DEPARTMENT OF
Department code
Subagency
VETERANS AFFAIRS, DEPARTMENT OF
Subagency code
Office
261-NETWORK CONTRACT OFFICE 21 (36C261)
Organization path
Organization path codes
Office address
MATHER, CA, 95655, USA
Place of performance
City code
State
State code
Postal code
Country

Points of contact

Contact details from the current notice version.

Notice description

Source text reproduced without an AI summary.

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. CONTINUATION PAGE 2 SOLICITATION NO: 36C26126R0036 ORDER NO: AMENDMENT NO: 0005 14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED) The purpose of this amendment is to answer three additional RFIs. Section 01 00 00 requires the project schedule to include a minimum of forty-five (45) days for VA� relocation of Pharmacy Services into the completed temporary facilities, and a minimum of forty-five (45) days for VA relocation of staff, equipment, and operations from the temporary facilities back into Building 650 upon completion of the renovated outpatient pharmacy suite. Please confirm: (a) whether both 45-day VA relocation periods are included within the 540-calendar-day period of performance; and (b) whether contract completion for purposes of the period of performance is measured at Government acceptance of the renovated pharmacy suite, or upon completion of temporary facility removal and complete site restoration following the VA's 45-day relocation back into Building 650. ANSWER: The 540-calendar-day Contract Time includes both 45-calendar-day VA relocation periods. Contract completion is achieved upon completion of all Contract Work, including removal of the temporary facilities and complete site restoration following the VA's final relocation back into Building 650. "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. Section 01 00 00 states: 100% of ALL project submittals shall be approved prior to the construction start date. Please clarify whether construction start date refers to (a) commencement of temporary facility construction, or (b) commencement of renovation work within Building 650. Please also confirm whether closeout-phase submittals (e.g., O&M manuals, as-built drawings) and late-phase finish material submittals are included in this requirement, or whether it applies to construction-phase submittals only. GLBA appreciates the Government's attention to these questions and remains available for any clarification needed. ANSWER: "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. One of our drywall trade partners has brought up a conflict they have found on the existing walls at the perimeter of the pharmacy. Per wall type Mbb3 on Sheet A-501 at the corridor it appears that the framing is existing and one new layer of board, the security mesh fire safing and a closure angle is required to be installed. How we would install the 3 slip track at an existing wall? Are they to be cut between the existing studs and fastened to the bottom of the roof deck? Please advise if the slip track is needed. ANSWER: Install the head-of-wall/slip-track assembly at the existing wall by attaching the slip track to the structure above as required to maintain the specified assembly. Existing studs are not required to be removed or modified except as necessary to complete the installation. ///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////

Comparable award range

Historical award values for work matched by the fixed rubric—not an estimate of this opportunity.

No past awards scored highly enough to form a comparable range.

Comparable awards

The match score is decomposed so each comparison can be challenged.

No comparable awards are attached to this notice.

Record provenance

Field-level lineage for the current opportunity version.

FieldSourceSource as ofParserTransform
agency_nameSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
archive_dateSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
archive_typeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
base_typeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
contactsSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
descriptionSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
naics_codeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
notice_idSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
notice_typeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
office_citySAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
office_country_codeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
office_nameSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
office_postal_codeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
office_state_codeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
organization_typeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
posted_dateSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
psc_codeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
response_deadlineSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
sam_urlSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
solicitation_numberSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
subagency_nameSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
titleSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3
upstream_activeSAM.gov Contract OpportunitiesSep 5, 2026sam_opportunity_snapshot@2026.08.32026.08.3

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

  1. 1Notice fields come from the SAM.gov contract opportunities record last seen Sep 5, 2026. SAM.gov remains authoritative.

Note 1 covers the solicitation record. No synthetic FAQ or inferred solicitation value is published.

Z1DA--612A4-19-016 | Renovate Outpatient Pharmacy and HVAC — federal contract opportunity · BidBenchmark