C--AR-POND CRK NWR-T26P1-RIVER ROAD BRIDGE
FWS, GAOA
Response status
Historical record
Sep 2, 2026, 9:00 PM UTC
This notice is no longer open.
- Posted
- Aug 18, 2026
- Archive date
- Sep 17, 2026
- SAM status
- Active
Answer-first brief
What the source record says
- FWS, GAOA published this special notice.
- Competition is listed as Small Business Set-Aside - Total.
- The notice uses NAICS 541330 (Engineering Services).
Procurement identity
- Notice ID
- 91afcaff431f48bb959c551e1e7651a7
- Solicitation
- 140FGA26R0036
- Base type
- Special Notice
- Version
- 3 of 3
Solicitation facts
Structured fields from the current SAM notice version. A dash means the source did not publish a value.
- Notice type
- Special Notice
- Solicitation number
- 140FGA26R0036
- Set-aside
- Small Business Set-Aside - Total
- Set-aside code
- SBA
- Posted
- Aug 18, 2026
- Responses due
- Sep 2, 2026, 9:00 PM UTC
- Archive date
- Sep 17, 2026
- Archive type
- auto15
- Base type
- Special Notice
- Organization type
- OFFICE
- Benchmark category
- Engineering Services
- Category confidence
- 92%
- Category source
- rule
- Last seen
- Sep 5, 2026
Buyer and place
Office hierarchy and place of performance as published.
- Department
- INTERIOR, DEPARTMENT OF THE
- Department code
- —
- Subagency
- US FISH AND WILDLIFE SERVICE
- Subagency code
- —
- Office
- FWS, GAOA
- Organization path
- —
- Organization path codes
- —
- Office address
- Falls Church, VA, 22041, USA
- Place of performance
- —
- City code
- —
- State
- —
- State code
- —
- Postal code
- —
- Country
- —
Points of contact
Contact details from the current notice version.
primary
Young, Ian
Notice description
Source text reproduced without an AI summary.
Comparable award range
Historical award values for work matched by the fixed rubric—not an estimate of this opportunity.
- Comparable awards
- 50
- Median
- $173,090
- Computed
- Aug 21, 2026
- Rubric
- comparables@2026.08.1
Comparable awards
The match score is decomposed so each comparison can be challenged.
| Award | Contractor | Value | Awarded | Score | Why it matched |
|---|---|---|---|---|---|
| LEVEL II TRAFFIC ANALYSIS | CITRINE-OLSSON JV LLC | $22,960.26 | Jun 15, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| DESIGN FOR A REPLACEMENT OF THE 70.5 FT BRIDGE AT MADISON GULF, IN THE WHITE MOUNTAIN NF. | HEB ENGINEERS INC | $149,300.00 | May 28, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| BRIDGE LOAD RATINGS R5 2025 - NO COST MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE. | MGE ENGINEERING, INC | $201,908.96 | Jul 15, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| P0001, SUSPENSION OF WORK - PROJECT #667-23-105 (AE) CONSTRUCT VIKING DRIVE | DESIGN BUILD CONSORTIUM, LLC | $690,006.80 | Jun 16, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALL | WSP USA INC. | $158,968.14 | Jun 4, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALL | JACOBS ENGINEERING GROUP INC. | $604,180.06 | Jun 15, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| PROJECT DC NP ROCR MULTI (1) THE PURPOSE OF THIS NO COST MODIFICATION IS TO: 1. REMOVE T | JOHNSON, MIRMIRAN & THOMPSON, INC. | $2,135,439.33 | Jul 6, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS TASK ORDER MODIFICATION IS TO: 1. INCREASE THE TOTAL OBLIGATED AMOUNT | AECOM TECHNICAL SERVICES, INC. | $1,925,986.12 | Jun 9, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| PROVIDE ENGINEERING SERVICES FOR PROJECT: TN NP GRSM BR 5460-086P - GEOTECHNICAL SUBSURFAC | HDR ENGINEERING INC | $153,433.90 | Jul 27, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| PROJECT MD NP-GWMP 6(2) - CLARA BARTON CANTILEVER WALL FOUNDATION EVALUATION IN GEORGE WAS | WSP USA INC. | $608,710.47 | Jul 14, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS MODIFICATION IS TO DECREASE THE TOTAL OBLIGATED AMOUNT FOR THE TASK OR | WSP USA INC. | $75,662.70 | Aug 4, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALL | STANTEC CONSULTING SERVICES INC | $68,788.00 | Jul 24, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS MODIFICATION IS TO DECREASE THE TOTAL OBLIGATED AMOUNT FOR THE TASK OR | HDR ENGINEERING INC | $87,954.95 | Jul 22, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| ENGINEERING SERVICES FOR PROJECTS NC NP BLRI PVT PRES FY26(1), NP SER PMS FY26(1) AND NP S | AECOM TECHNICAL SERVICES, INC. | $1,564,422.53 | Jul 1, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| SERVICES FOR PROJECT MD NP CHOH 10(3), 907(1) GREAT FALLS ENTRANCE ROAD AND PARKING IN ACC | WSP USA INC. | $34,735.30 | Jul 9, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THIS IS A NO COST PERIOD OF PERFORMANCE MODIFICATION FOR THE ND FTNP THRO 11(10) SOUTH UNI | HDR ENGINEERING, INC. | $180,000.00 | Jun 4, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS TASK ORDER IS TO PERFORM SOW TO FINAL SET OF PLANS, SPECIFICATIONS AND | JACOBS ENGINEERING GROUP INC. | $1,463,253.50 | Jun 3, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) END DATE TO | YEH AND ASSOCIATES, INC | $2,501,888.38 | Jul 22, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| CA FLAP SR89(1) TRUCKEE RIVER BRIDGE: CONSTRUCTION CLAIM CONSULTING SERVICES THE PURPOSE O | HDR ENGINEERING, INC. | $71,002.17 | May 29, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
| THE PURPOSE OF THIS NO COST MODIFICATION IS TO CLOSE OUT THE TASK ORDER. | JACOBS ENGINEERING GROUP INC. | $285,402.81 | Jun 9, 2026 | 77 | Same product and service code (25), Same benchmark category (25), Same industry code (20), Recent enough to be relevant (7) |
Amendment history
A version is preserved whenever the normalized notice contents change.
| Version | Notice type | Observed | Responses due | Content hash |
|---|---|---|---|---|
| 1 | Special Notice | Aug 20, 2026 | Sep 2, 2026, 9:00 PM UTC | 7e38aa38f0f13c14 |
| 2 | Special Notice | Aug 24, 2026 | Sep 2, 2026, 9:00 PM UTC | ade28dd2dbed16e6 |
| 3 | Special Notice | Aug 28, 2026 | Sep 2, 2026, 9:00 PM UTC | 27e6e7da50399cea |
Record provenance
Field-level lineage for the current opportunity version.
| Field | Source | Source as of | Parser | Transform |
|---|---|---|---|---|
| agency_name | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| archive_date | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| archive_type | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| base_type | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| contacts | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| description | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| naics_code | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| notice_id | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| notice_type | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| office_city | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| office_country_code | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| office_name | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| office_postal_code | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| office_state_code | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| organization_type | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| posted_date | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| psc_code | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| response_deadline | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| sam_url | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| set_aside_code | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| set_aside_label_raw | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| solicitation_number | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| subagency_name | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| title | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
| upstream_active | SAM.gov Contract Opportunities | Aug 25, 2026 | sam_opportunity_snapshot@2026.08.2 | 2026.08.3 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Comparable awards are scored on benchmark category, product and service code, industry code, buyer, place, recency, and contract type. Rubric version comparables@2026.08.1.
- 1Notice fields come from the SAM.gov contract opportunities record last seen Sep 5, 2026. SAM.gov remains authoritative.
- 2Computed from 50 completed federal awards using comparables@2026.08.1, as of Aug 21, 2026. Award values are neither unit prices nor a forecast.
Note 1 covers the solicitation record; note 2 covers the comparable range. No synthetic FAQ or inferred solicitation value is published.