Skip to content
BidBenchmark
Sources SoughtAmendment 2

Winfield Roller Gate RFI

W072 ENDIST HUNTINGTON · Red House, West Virginia, 25168

Response status

Historical record

Aug 3, 2026, 3:00 PM UTC

This notice is no longer open.

Posted
Jul 13, 2026
Archive date
Aug 18, 2026
SAM status
Active
This is a preserved solicitation record. The response window is closed because the published deadline passed.

Answer-first brief

What the source record says

  • W072 ENDIST HUNTINGTON published this sources sought.
  • Competition is listed as No Set aside used.
  • The place of performance is Red House, West Virginia.
  • The notice uses NAICS 332312 (Fabricated Structural Metal Manufacturing).

Procurement identity

Notice ID
3633088476034fb6bf33e03b2c9506b4
Solicitation
W91237-26-Q1C5L
Base type
Sources Sought
Version
2 of 2

Solicitation facts

Structured fields from the current SAM notice version. A dash means the source did not publish a value.

Notice type
Sources Sought
Solicitation number
W91237-26-Q1C5L
Set-aside
No Set aside used
Set-aside code
Posted
Jul 13, 2026
Responses due
Aug 3, 2026, 3:00 PM UTC
Archive date
Aug 18, 2026
Archive type
auto15
Base type
Sources Sought
Organization type
OFFICE
Benchmark category
Category confidence
Category source
Last seen
Aug 29, 2026

Buyer and place

Office hierarchy and place of performance as published.

Department
DEPT OF DEFENSE
Department code
Subagency
DEPT OF THE ARMY
Subagency code
Office
W072 ENDIST HUNTINGTON
Organization path
Organization path codes
Office address
HUNTINGTON, WV, 25701-5000, USA
Place of performance
Red House, West Virginia, 25168
City code
State
West Virginia
State code
WV
Postal code
25168
Country

Points of contact

Contact details from the current notice version.

Notice description

Source text reproduced without an AI summary.

This Request For Information Notice is intended to garner industry input for questions regarding Roller Gate Fabrication for the Winfiled Lock and Dam Located in Red House, West Virgina. Interested Contractors are encouraged to reply to the following questions after reviewing the Attached Technical Drawings: 1. Can the skin plate splices be performed using submerged arc welding? 2. Economies of scale: Are there significant efficiencies related to fabrication of 1 gate v 2 gates v 3 gates, etc. 3. Not grinding skin plate welds�What is the time and labor savings? Would not staggering skin plate splices increase efficiency/benefit fabrication? Note that splice welds would still be required to be ground flush at the intersections of longitudinal and transverse splice welds a minimum of 4� in all directions. 4. What factors do you consider when doing 100% RT on this quantity of welds? Shutting down shop? How is this cost factored in? What is the production rate? Cost per test? 5. Would a design featuring multiple pieces (2-4) with transverse gate splice(s) benefit fabrication? Would you prefer this splice be welded or bolted using slip critical bolted connection. Note that full assembly would be required at the shop prior to shipment for a full shop fit assembly. 6. Would a design featuring bolted on end shields and/or apron benefit fabrication/increase efficiency? 7. Would you be more or less likely to bid if this was a Construction Contractor (i.e. working with a prime contractor to install) vs a supply fabrication contract. 8. What can USACE do to reduce risk/contingency in bidding a project like this? 9. Are there connections that would be more cost efficient bolted instead of welded? Would it be more cost efficient to weld, or use slip critical bolts to connect splices on the skin plate(longitudinal and transverse)? 10. Are there a fabrication cost difference between bearing type and slip-critical bolted connections. 11. If final assembly of the gates is allowed in the field during installation, is this something that would be a benefit for fabrication/increase efficiency?

Comparable award range

Historical award values for work matched by the fixed rubric—not an estimate of this opportunity.

No past awards scored highly enough to form a comparable range.

Comparable awards

The match score is decomposed so each comparison can be challenged.

No comparable awards are attached to this notice.

Amendment history

A version is preserved whenever the normalized notice contents change.

VersionNotice typeObservedResponses dueContent hash
1Sources SoughtAug 10, 2026Aug 3, 2026, 3:00 PM UTC54ee4eefdcb45ba2
2Sources SoughtAug 28, 2026Aug 3, 2026, 3:00 PM UTCb044a69eef63328b

Record provenance

Field-level lineage for the current opportunity version.

FieldSourceSource as ofParserTransform
agency_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
archive_dateSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
archive_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
base_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
city_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
contactsSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
country_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
descriptionSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
naics_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
notice_idSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
notice_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_citySAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_country_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_postal_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_state_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
organization_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
pop_postal_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
posted_dateSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
psc_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
response_deadlineSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
sam_urlSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
set_aside_label_rawSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
solicitation_numberSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
state_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
subagency_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
titleSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
upstream_activeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

  1. 1Notice fields come from the SAM.gov contract opportunities record last seen Aug 29, 2026. SAM.gov remains authoritative.

Note 1 covers the solicitation record. No synthetic FAQ or inferred solicitation value is published.

Winfield Roller Gate RFI — federal contract opportunity · BidBenchmark