Skip to content
BidBenchmark
Combined Synopsis/SolicitationAmendment 2

Monument Rehabilitation at Piedmont Dam

W072 ENDIST PITTSBURGH · Piedmont Dam32665 Belmont Ridge RoadPiedmont Ohio, 43983-9721, 43983

Response status

Historical record

Sep 22, 2025, 3:00 PM UTC

This notice is no longer open.

Posted
Sep 19, 2025
Archive date
Sep 19, 2026
SAM status
Active
This is a preserved solicitation record. The response window is closed because the published deadline passed.

Answer-first brief

What the source record says

  • W072 ENDIST PITTSBURGH published this combined synopsis/solicitation.
  • Competition is listed as Small Business Set-Aside - Total.
  • The notice uses NAICS 238110 (Poured Concrete Foundation and Structure Contractors).

Procurement identity

Notice ID
06a90ce969444711b75b6ec9c4aa62f1
Solicitation
W9123725QA075
Base type
Combined Synopsis/Solicitation
Version
2 of 2

Solicitation facts

Structured fields from the current SAM notice version. A dash means the source did not publish a value.

Notice type
Combined Synopsis/Solicitation
Solicitation number
W9123725QA075
Set-aside
Small Business Set-Aside - Total
Set-aside code
SBA
Posted
Sep 19, 2025
Responses due
Sep 22, 2025, 3:00 PM UTC
Archive date
Sep 19, 2026
Archive type
autocustom
Base type
Combined Synopsis/Solicitation
Organization type
OFFICE
Category confidence
96%
Category source
rule
Last seen
Aug 29, 2026

Buyer and place

Office hierarchy and place of performance as published.

Department
DEPT OF DEFENSE
Department code
Subagency
DEPT OF THE ARMY
Subagency code
Office
W072 ENDIST PITTSBURGH
Organization path
Organization path codes
Office address
PITTSBURGH, PA, 15222-4198, USA
Place of performance
Piedmont Dam32665 Belmont Ridge RoadPiedmont Ohio, 43983-9721, 43983
City code
State
State code
Postal code
43983
Country

Points of contact

Contact details from the current notice version.

Notice description

Source text reproduced without an AI summary.

The Contractor shall provide all labor, supplies, materials, and equipment to remove existing monument information plaque, restore information plaque, excavate area, form, pour and install new concrete pad, form and pour in place new monument base and re-install restored information plaque. The contractor shall excavate designated area as per Attachment 2. All excavated material shall be set aside for finish grading after pad and monument are complete. The area of excavation for the 20 x 20 pad as per Attachment 3 be deep enough to allow for a 6-inch thick 20 ft by 20 ft concrete pad to have a minimum of 5 inches of concrete below the ground level and 1 inch extending beyond ground level. The contractor shall place 3 inches of 304 aggregate under the 6-inch-deep pad prior to the pour of pad. The concrete pad shall have a 1 inch to 10 ft slope from side to side as indicated on Attachment 4. The contractor shall install 4x4 wire mesh and tie, for the entire formed pad area except in the location of proposed monument. The contractor shall construct a monument and base as per Attachment 6. The dimensions of the monument shall be field verified and relative to the Government Furnished Plaque. The contractor shall remove the existing bronze plaque from the concrete monument, thoroughly clean off all oxidation and corrosion as well as all paint on lettered portion or any other portion of plaque that is painted. The contractor shall have bronze plaque restored to a bright finish, all previously painted areas repainted black and entire bronze plaque will have 2 coats of clear sealer applied.**NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?. 15 September 2025 - Amendment 0001 published to update Attachments 2,3,4, and 5, update Attachment 7 - Wage Determination ON20250001 from 9-5-2025 to 9-12-2025 and add Attachment 8 - Guideline for Historic Preservation.

Comparable award range

Historical award values for work matched by the fixed rubric—not an estimate of this opportunity.

No past awards scored highly enough to form a comparable range.

Comparable awards

The match score is decomposed so each comparison can be challenged.

No comparable awards are attached to this notice.

Amendment history

A version is preserved whenever the normalized notice contents change.

VersionNotice typeObservedResponses dueContent hash
1Combined Synopsis/SolicitationAug 10, 2026Sep 22, 2025, 3:00 PM UTC10345ba5db931a52
2Combined Synopsis/SolicitationAug 28, 2026Sep 22, 2025, 3:00 PM UTCa7f5041c59e078c2

Record provenance

Field-level lineage for the current opportunity version.

FieldSourceSource as ofParserTransform
agency_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
archive_dateSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
archive_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
base_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
contactsSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
descriptionSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
naics_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
notice_idSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
notice_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_citySAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_country_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_postal_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_state_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
organization_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
pop_postal_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
pop_street_addressSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
posted_dateSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
psc_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
response_deadlineSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
sam_urlSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
set_aside_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
set_aside_label_rawSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
solicitation_numberSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
subagency_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
titleSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
upstream_activeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

  1. 1Notice fields come from the SAM.gov contract opportunities record last seen Aug 29, 2026. SAM.gov remains authoritative.

Note 1 covers the solicitation record. No synthetic FAQ or inferred solicitation value is published.

Monument Rehabilitation at Piedmont Dam — federal contract opportunity · BidBenchmark