Largest awards under this code
| Award | Contractor | Agency | Place | First action | Current value |
|---|---|---|---|---|---|
| W912EP24C0018 CEPP CNT 11B, EAA A-2 RESERVOIR EMBANKMENT AND STRUCTURES | THALLE CONSTRUCTION CO INC | Department of Defense | FL | Mar 3, 2026 | $4,781,321,247 |
| N6274223F4007 CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. FUNDING ADMINISTRATIVE MODIFICATION. | DRAGADOS/HAWAIIAN DREDGING/ORION JV | Department of Defense | HI | Mar 6, 2026 | $3,298,431,328 |
| N4008521C0077 P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME | 381 CONSTRUCTORS | Department of Defense | ME | Feb 27, 2026 | $1,941,809,399 |
| W911XK22C0006 A00049/R00079/CH0110 RUAW SSP WALL DESIGN IS TO PROVIDE FUNDING FOR 65% DESIGN OF THE SSP WALL SO THAT THE CONTRACTOR CAN EFFECTIVELY AND MORE EFFICIENTLY BID CH0100 RUAW. THESE FUNDS WILL BE ACCOUNTED FOR DURING NEGOTIATIONS OF CH0100 RUAW. | KOKOSING ALBERICI TRAYLOR, LLC | Department of Defense | MI | Feb 27, 2026 | $1,938,699,214 |
| W51DQV26CA003 RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3 CHANNEL BOTTOM AND WALL IMPROVEMENTS IN SAN JUAN, PR. INCLUDES CHANNEL WIDENING AND DEEPENING, DRILLED SHAFT WALLS, DREDGING, AND UTILITY RELOCATIONS. | FERROVIAL CONSTRUCCION PR, LLC | Department of Defense | PR | Apr 30, 2026 | $1,078,991,952 |
| W911WN24C8011 MONTGOMERY LOCKS AND DAM NEW RIVER CHAMBER. | TRUMBULL CORPORATION AND BRAYMAN CONSTRUCTION CORPORATION, A JOINT VENTURE | Department of Defense | PA | Mar 3, 2026 | $915,191,358 |
| W912EP22C0017 CONTRACT NO. W912EP22C0017 370939 CEPP EAA CNT 11A A-2 FOUNDATION EF027 INTERIM VEQ - CLINS 0085 AND 0087REFERENCE NO. R00028 | FORGEN-ODIN JV | Department of Defense | FL | Apr 16, 2026 | $769,663,964 |
| W912BV25CA002 WHITTIER NARROWS DAM IS OWNED BY THE FEDERAL GOVERNMENT AND OPERATED AND MAINTAINED BY THE USACE LOS ANGELES DISTRICT (SPL) AND IS 11 MILES EAST OF DOWNTOWN LOS ANGELES. | BARNARD CONSTRUCTION COMPANY, INCORPORATED | Department of Defense | CA | Apr 25, 2025 | $761,125,068 |
| W912BV25C0008 MODIFICATION P00002 HEREBY EXECUTES CLIN 0002 AT THE CEILING PRICE OF $1,021,847,536.53, CLIN 0003 AT THE CEILING PRICE OF $75,641,129.76, AND INCORPORATES DFARS 252.232-7007. | BARNARD CONSTRUCTION COMPANY, INCORPORATED | Department of Defense | CA | Mar 23, 2026 | $623,002,420 |
| N4425525F0229 RM25-4869 SEISMIC REPAIR DRY DOCK 4, B704. DESIGN AND RETROFIT THE WALLS OF DRY DOCK 4 (DD4) FOR A SEISMIC LEVEL EVENT. THIS ACTION WAS ISSUED UNDER THE NAVFAC PACIFIC WATERFRONT MULTIPLE AWARD CONSTRUCTION CONTRACT (SIOP MACC). CONTINUES ON PAGE 2. | KIEWIT-ALBERICI SIOP MACC AJV | Department of Defense | WA | Mar 12, 2026 | $517,591,409 |
| N6247026C0001 P1062 DESIGN-BID-BUILD, DRY DOCK 3 MODERNIZATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH VA. | MEB GENERAL CONTRACTORS INC | Department of Defense | VA | Mar 2, 2026 | $442,127,000 |
| W912EF18C0001 MCNARY TURBINE REPLACEMENT, UNITS 1-14 | GE RENEWABLES US LLC | Department of Defense | OR | Mar 11, 2026 | $422,343,903 |
| W912P826CA012 WEST SHORE LAKE PONTCHARTRAIN, LA HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT RESERVE RELIEF AND I-55 PUMP STATIONS AND DRAINAGE STRUCTURES, WSLP-114 | PITTMAN-SEALEVEL, L.L.C. | Department of Defense | LA | Apr 2, 2026 | $419,667,888 |
| W912P521C0015 SCOPE OF WORK WKR098 WEATHER TIME EXTENSION JUL 2025-JAN 2026. THIS MODIFICATION EXTENDS TIME FOR DELAYS CAUSED BY ADVERSE WEATHER DURING THE PERIOD 01 JULY 2025 THROUGH 31 JANUARY 2026. | THALLE CONSTRUCTION CO INC | Department of Defense | KY | Apr 1, 2026 | $407,859,470 |
| W911KB25CA010 PORT OF NOME MODIFICATION PHASE 1A, NOME, ALASKA | KIEWIT INFRASTRUCTURE WEST CO. | Department of Defense | AK | Mar 10, 2026 | $399,443,425 |
| W9123720C0004 BLUESTONE DAM SAFETY ASSURANCE, PHASE 5, HINTON WV. MODIFICATIONS TO STILLING BASIN USING GOVERNMENT-FURNISHED COFFERDAM AND REHABILITATION OF RECREATIONAL AREAS. | BRAYMAN CONSTRUCTION CORP | Department of Defense | WV | Mar 20, 2026 | $387,709,542 |
| W912QR26CA005 ROUGH RIVER CUTOFF WALL | THALLE - BAUER LLC | Department of Defense | KY | Apr 21, 2026 | $378,960,250 |
| W9127822C0017 TWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA | THE LANE CONSTRUCTION CORPORATION | Department of Defense | FL | Mar 11, 2026 | $364,257,583 |
| W912DW25C0001 THIS MODIFICATION REMOVES AND/OR UPDATES CONTRACT CLAUSES AND ALSO REVISES CLIN 0002 TO REFLECT THE TARGET PRICES AGREED UPON DURING NEGOTIATIONS. | FLATIRON-AECON JOINT VENTURE | Department of Defense | WA | Mar 18, 2026 | $336,833,587 |
| N4008522C0017 MODIFICATION ISSUED TO PROVIDE FOR CHANGES ASSOCIATED WITH PCS 93, 94, 96 AND 101, P095 REPLACE SUBMARINE PIER, NAVAL STATION NORFOLK, NORFOLK, VA | RQ-MAGANN JV | Department of Defense | VA | Apr 14, 2026 | $323,731,997 |
| W912P517C0007 CHICKAMAUGA LOCK CHAMBER REPLACEMENT - CL254-2 MITER GATE PRODUCTION FILLET WELD SIZE INCREASE IS ENTERED INTO PURSUANT TO AUTHORITY OF FAR 52.243-4 CHANGES TO DEFINITIZE MODIFICATION P00026 (UCO PART 1). | SHIMMICK CONSTRUCTION COMPANY, INC. | Department of Defense | TN | Mar 25, 2026 | $312,771,154 |
| W911WN15C0009 RIVER CHAMBER COMPLETION MONONGAHELA RIVER, PA, AT CHARLEROI LOCKS AND DAM, MONONGAHELA, PA | TRUMBULL CORPORATION AND BRAYMAN CONSTRUCTION CORPORATION, A JOINT VENTURE | Department of Defense | PA | Mar 27, 2026 | $289,554,225 |
| W912DQ21C1027 MODIFICATION FOR ARM CLIN 40 HPILES TO CONTRACT FOR KANSAS CITYS, MO AND KS, FLOOD RISK MANAGEMENT PROJECT; ARGENTINE, ARMOURDALE AND CENTRAL INDUSTRIAL DISTRICT UNITS - LEVEE RAISE AT KANSAS CITY, KS AND KANSAS CITY, MO | THE LANE CONSTRUCTION CORPORATION | Department of Defense | KS | Apr 8, 2026 | $279,243,856 |
| 140R2025C0004 THE WORK REQUIRED IS FOR PHASE II OF B.F. SISK DAM SOD MODIFICATIONS. | NW CONSTRUCTION, INC | Department of the Interior | CA | Mar 31, 2026 | $257,269,309 |
| W912DS22C0003 TO PREVENT SAND MIGRATION UNDER THE BOARDWALK, A REINFORCED CAP SHALL BE INSTALLED AT THE EDGE OF THE BOARDWALK AS PER THE SOW. | MICHELS CORP | Department of Defense | NY | Mar 18, 2026 | $235,474,587 |
Related records
Derived from awards these records share, ordered by how many.
Benchmarked as
Bought by
Performed in
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals cover awards where the government recorded this NAICS code. Codes are taken as reported; awards are never reclassified into a different code.
- 1Awards are grouped by the NAICS code the government recorded on the award, taken from USAspending.gov and last refreshed Aug 10, 2026. Miscoded awards stay miscoded here; we do not reassign codes.
- 2Published distribution over 10 awards, computed Aug 10, 2026 (snapshot b7fdb9e135fd).