Contract award
SMITHSONIAN INSTITUTION
"IGF::OT::IGF" OTHER FUNCTIONS - TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) - THE TEMPO INVESTIGATION WAS SELECTED UNDER THE NASA SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2) ANNOUNCEMENT OF OPPORTUNITY (AO) PROGRAM ELEMENT APPENDIX J, NNH12ZDA006O-EVI1 FOR THE EARTH VENTURE INSTRUMENT-1 (EVI-1) ELEMENT OF THE EARTH SYSTEM SCIENCE PATHFINDER (ESSP) PROGRAM OFFICE'S EARTH VENTURE LINE. TEMPO MEASURES POLLUTION OF NORTH AMERICA, FROM MEXICO CITY TO THE CANADIAN TAR/OIL SANDS, AND FROM THE ATLANTIC TO THE PACIFIC, HOURLY AND AT HIGH SPATIAL RESOLUTION. TEMPO SPECTROSCOPIC MEASUREMENTS IN THE ULTRAVIOLET AND VISIBLE AND PROVIDES A TROPOSPHERIC MEASUREMENT SUITE THAT INCLUDES THE KEY ELEMENTS OF TROPOSPHERIC AIR POLLUTION CHEMISTRY. MEASUREMENTS ARE FROM GEOSTATIONARY ORBIT, TO CAPTURE THE INHERENT HIGH VARIABILITY IN THE DIURNAL CYCLE OF EMISSIONS AND CHEMISTRY. A SMALL PRODUCT SPATIAL FOOTPRINT RESOLVES POLLUTION SOURCES AT SUB-URBAN SCALE. TOGETHER, THIS TEMPORAL AND SPATIAL RESOLUTION IMPROVES EMISSION INVENTORIES, MONITORS POPULATION EXPOSURE, AND ENABLES EFFECTIVE EMISSION-CONTROL STRATEGIES. TEMPO TAKES ADVANTAGE OF A GEOSTATIONARY (GEO) HOST SPACECRAFT TO PROVIDE A MODEST COST MISSION THAT MEASURES THE SPECTRA REQUIRED TO RETRIEVE O3, NO2, SO2, H2CO, C2H2O2, H2O, AEROSOLS, CLOUD PARAMETERS, AND UVB RADIATION. TEMPO THUS MEASURES THE MAJOR ELEMENTS, DIRECTLY OR BY PROXY, IN THE TROPOSPHERIC O3 CHEMISTRY CYCLE. MULTI-SPECTRAL OBSERVATIONS PROVIDE SENSITIVITY TO O3 IN THE LOWERMOST TROPOSPHERE, REDUCING UNCERTAINTY IN AIR QUALITY PREDICTIONS BY 50%. TEMPO QUANTIFIES AND TRACKS THE EVOLUTION OF AEROSOL LOADING. IT PROVIDES NEAR-REAL-TIME AIR QUALITY PRODUCTS THAT WILL BE MADE WIDELY, PUBLICLY AVAILABLE. TEMPO MAKES THE FIRST TROPOSPHERIC TRACE GAS MEASUREMENTS FROM GEO, BY BUILDING ON THE HERITAGE OF FIVE SPECTROMETERS FLOWN IN LOW-EARTH-ORBIT (LEO). THESE LEO INSTRUMENTS MEASURE THE NEEDED SPECTRA, ALTHOUGH AT COARSE SPATIAL AND TEMPORAL RESOLUTIONS, TO THE PRECISIONS REQUIRED FOR TEMPO AND USE RETRIEVAL ALGORITHMS DEVELOPED FOR THEM BY TEMPO SCIENCE TEAM MEMBERS AND CURRENTLY RUNNING IN OPERATIONAL ENVIRONMENTS. THIS MAKES TEMPO AN INNOVATIVE USE OF A WELL PROVEN TECHNIQUE, ABLE TO PRODUCE A REVOLUTIONARY DATASET. TEMPO PROVIDES MUCH OF THE ATMOSPHERIC MEASUREMENT CAPABILITY RECOMMENDED FOR GEO-CAPE IN THE 2007 NATIONAL RESEARCH COUNCIL DECADAL SURVEY, EARTH SCIENCE AND APPLICATIONS FROM SPACE: NATIONAL IMPERATIVES FOR THE NEXT DECADE AND BEYOND. GEO-CAPE IS NOT PLANNED FOR IMPLEMENTATION THIS DECADE, HOWEVER, EUROPE (SENTINEL 4) AND ASIA (GEMS) WILL FORM PARTS OF A GLOBAL GEO CONSTELLATION FOR POLLUTION MONITORING, WITH A MAJOR FOCUS ON INTERCONTINENTAL POLLUTION TRANSPORT. TEMPO WILL LAUNCH AT A PRIME TIME TO BE A COMPONENT OF THIS CONSTELLATION.
- PIID
- NNL13AA09C
- Award key
- CONT_AWD_NNL13AA09C_8000_-NONE-_-NONE-
- Recipient UEI
- Q7N8CH7NR418
- Source as of
- —
Current award value
$35,224,6383
Obligated to date
$31,944,9702
Potential with options
$35,224,6383
- Awarding agency
- National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
- Contractor
- SMITHSONIAN INSTITUTION
- Place of performance
- Cambridge, Massachusetts
- Set-aside
- No set-aside used
- Pricing
- Cost Plus Fixed Fee
- Competition
- Full and Open Competition14 offers received
- Period of performance
- Mar 29, 2013 — Mar 31, 2028Through Mar 31, 2028 if all options are exercised
- Benchmark category
- Unclassified
Transaction history
Every action recorded against this award, in the order the government reported them.
| Mod | Action date | Reason | Obligation | Value at action |
|---|---|---|---|---|
| 0 | Mar 29, 2013 | Initial award | $1,000,000.00 | $35,224,638.00 |
| 1 | Jul 17, 2013 | B | $0.00 | $35,224,638.00 |
| 2 | Sep 16, 2013 | B | $0.00 | $35,224,638.00 |
| 3 | Nov 21, 2013 | B | $0.00 | $35,224,638.00 |
| 4 | Nov 21, 2013 | C | $200,000.00 | $35,224,638.00 |
| 5 | Dec 17, 2013 | B | $0.00 | $35,224,638.00 |
| 6 | Feb 10, 2014 | C | $200,000.00 | $35,224,638.00 |
| 7 | May 7, 2014 | B | $0.00 | $35,224,638.00 |
| 8 | May 8, 2014 | C | $350,000.00 | $35,224,638.00 |
| 9 | Jul 14, 2014 | B | $0.00 | $35,224,638.00 |
| 10 | Aug 11, 2014 | C | $311,900.00 | $35,224,638.00 |
| 11 | Oct 22, 2014 | B | $115,178.00 | $35,224,638.00 |
| 12 | Oct 22, 2014 | C | $350,000.00 | $35,224,638.00 |
| 13 | Dec 3, 2014 | C | $150,000.00 | $35,224,638.00 |
| 14 | Jan 6, 2015 | C | $600,000.00 | $35,224,638.00 |
| 15 | Apr 1, 2015 | B | $0.00 | $35,224,638.00 |
| 16 | Apr 16, 2015 | C | $788,600.00 | $35,224,638.00 |
| 17 | Aug 6, 2015 | B | $0.00 | $35,224,638.00 |
| 18 | Oct 9, 2015 | B | $1,051,000.00 | $35,224,638.00 |
| 19 | Jan 27, 2016 | C | $300,000.00 | $35,224,638.00 |
| 20 | Mar 21, 2016 | C | $913,000.00 | $35,224,638.00 |
| 21 | Aug 25, 2016 | B | $0.00 | $35,224,638.00 |
| 22 | Nov 7, 2016 | B | $640,000.00 | $35,224,638.00 |
| 23 | Jan 26, 2017 | C | $700,000.00 | $35,224,638.00 |
| 24 | Feb 2, 2017 | B | $100,184.00 | $35,224,638.00 |
| 25 | Apr 21, 2017 | C | $1,000,000.00 | $35,224,638.00 |
| 26 | Sep 11, 2017 | C | $300,000.00 | $35,224,638.00 |
| 27 | Sep 20, 2017 | B | $0.00 | $35,224,638.00 |
| 28 | Dec 8, 2017 | B | $0.00 | $35,224,638.00 |
| 29 | Dec 11, 2017 | C | $450,000.00 | $35,224,638.00 |
| 30 | Jan 3, 2018 | B | $0.00 | $35,224,638.00 |
| 31 | Feb 9, 2018 | C | $450,000.00 | $35,224,638.00 |
| 32 | Mar 19, 2018 | M | $0.00 | $35,224,638.00 |
| 33 | Jun 7, 2018 | B | $0.00 | $35,224,638.00 |
| 34 | Jun 21, 2018 | C | $450,000.00 | $35,224,638.00 |
| 35 | Aug 15, 2018 | B | $497,385.00 | $35,224,638.00 |
| 36 | Dec 21, 2018 | B | $480,000.00 | $35,224,638.00 |
| 37 | Feb 6, 2019 | C | $450,000.00 | $35,224,638.00 |
| 38 | Jun 20, 2019 | C | $671,000.00 | $35,224,638.00 |
| 39 | Aug 26, 2019 | C | $2,174,100.00 | $35,224,638.00 |
| 40 | Oct 10, 2019 | B | $152,000.00 | $35,224,638.00 |
| 41 | Sep 2, 2020 | C | $45,000.00 | $35,224,638.00 |
| 42 | Sep 30, 2020 | C | $0.00 | $35,224,638.00 |
| 43 | Dec 9, 2020 | C | $882,000.00 | $35,224,638.00 |
| 44 | Apr 13, 2021 | C | $1,000,000.00 | $35,224,638.00 |
| P00045 | Aug 6, 2021 | B | $2,506,100.00 | $35,224,638.00 |
| P00046 | Sep 10, 2021 | C | $200,000.00 | $35,224,638.00 |
| P00047 | Oct 14, 2021 | B | $0.00 | $35,224,638.00 |
| P00048 | Sep 16, 2022 | C | $889,000.00 | $35,224,638.00 |
| P00049 | Sep 19, 2022 | M | $0.00 | $35,224,638.00 |
| P00050 | Dec 19, 2022 | C | $118,000.00 | $35,224,638.00 |
| P00051 | Jul 7, 2023 | B | $3,671,275.00 | $35,224,638.00 |
| P00052 | Sep 13, 2023 | C | $511,930.00 | $35,224,638.00 |
| P00053 | Dec 8, 2023 | M | $0.00 | $35,224,638.00 |
| P00054 | Jan 24, 2024 | M | $0.00 | $35,224,638.00 |
| P00055 | Jun 5, 2024 | B | $464,118.00 | $35,224,638.00 |
| P00056 | Jul 2, 2024 | B | $0.00 | $35,224,638.00 |
| P00057 | Aug 8, 2024 | B | $0.00 | $35,224,638.00 |
| P00058 | Sep 6, 2024 | C | $281,436.00 | $35,224,638.00 |
| P00059 | Nov 18, 2024 | B | $0.00 | $35,224,638.00 |
| P00060 | Apr 2, 2025 | M | $0.00 | $35,224,638.00 |
| P00061 | May 27, 2025 | B | $600,000.00 | $35,224,638.00 |
| P00062 | Jul 2, 2025 | M | $0.00 | $35,224,638.00 |
| P00063 | Jul 30, 2025 | C | $1,609,000.00 | $35,224,638.00 |
| P00064 | Sep 12, 2025 | C | $3,572,764.00 | $35,224,638.00 |
| P00065 | Sep 30, 2025 | B | $0.00 | $35,224,638.00 |
| P00066 | Dec 17, 2025 | M | $0.00 | $35,224,638.00 |
| P00067 | Jun 17, 2026 | B | $0.00 | $35,224,638.00 |
| P00068 | Aug 19, 2026 | C | $750,000.00 | $35,224,638.00 |
Provenance
Which source record produced each displayed rollup figure.
| Field | Source | File | Retrieved | Parser | Artifact hash |
|---|---|---|---|---|---|
| awarding_agency_id | USAspending.gov | — | Aug 21, 2026 | usaspending_contract_csv@2026.08.2 | ccdba2bf693f |
| contractor_id | USAspending.gov | — | Aug 21, 2026 | usaspending_contract_csv@2026.08.2 | ccdba2bf693f |
| current_award_value | USAspending.gov | — | Aug 21, 2026 | usaspending_contract_csv@2026.08.2 | ccdba2bf693f |
| naics_code | USAspending.gov | — | Aug 21, 2026 | usaspending_contract_csv@2026.08.2 | ccdba2bf693f |
| potential_award_value | USAspending.gov | — | Aug 21, 2026 | usaspending_contract_csv@2026.08.2 | ccdba2bf693f |
| psc_code | USAspending.gov | — | Aug 21, 2026 | usaspending_contract_csv@2026.08.2 | ccdba2bf693f |
| total_obligated | USAspending.gov | — | Aug 21, 2026 | usaspending_contract_csv@2026.08.2 | ccdba2bf693f |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
This page is a record of one federal award, assembled from the transactions the government published against it. Note 1 describes where the rollup came from. Values are award values, not unit prices.
- 1Rollup values derive from 69 transaction records parsed from USAspending.gov, retrieved Aug 21, 2026 by transform awards@2026.08.1.
- 2Obligations are the sum of signed federal action obligations across all transactions; deobligations are negative and remain negative.
- 3Current and potential award values are taken from the latest reported action, not summed across modifications.