Contract award
NORTHROP GRUMMAN SYSTEMS CORPORATION
IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS
- PIID
- NNH15CN76C
- Award key
- CONT_AWD_NNH15CN76C_8000_-NONE-_-NONE-
- Recipient UEI
- Q11ZHUFBW741
- Source as of
- Aug 6, 2026
Current award value
$1,880,334,4643
Obligated to date
$1,667,792,9552
Potential with options
$2,001,207,5553
- Awarding agency
- National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
- Contractor
- NORTHROP GRUMMAN SYSTEMS CORPORATION
- Place of performance
- Sterling, Virginia
- Set-aside
- No set-aside used
- Pricing
- Cost Plus Award Fee
- Competition
- Full and Open Competition34 offers received
- Period of performance
- Sep 3, 2015 — May 31, 2029Through May 31, 2029 if all options are exercised
- Benchmark category
- Unclassified
Transaction history
Every action recorded against this award, in the order the government reported them.
| Mod | Action date | Reason | Obligation | Value at action |
|---|---|---|---|---|
| 0 | Sep 3, 2015 | Initial award | $100,000.00 | $1,880,334,463.74 |
| 1 | Nov 3, 2015 | C | $200,000.00 | $1,880,334,463.74 |
| 2 | Jan 12, 2016 | C | $200,000.00 | $1,880,334,463.74 |
| 3 | Feb 23, 2016 | C | $499,998.00 | $1,880,334,463.74 |
| 4 | Jun 21, 2016 | B | $0.00 | $1,880,334,463.74 |
| 5 | Oct 31, 2016 | B | $0.00 | $1,880,334,463.74 |
| 6 | Feb 1, 2017 | D | $0.00 | $1,880,334,463.74 |
| 7 | Mar 21, 2017 | D | $0.00 | $1,880,334,463.74 |
| 8 | Jun 5, 2017 | D | $0.00 | $1,880,334,463.74 |
| 9 | Jul 10, 2017 | D | $0.00 | $1,880,334,463.74 |
| 10 | Aug 24, 2017 | D | $0.00 | $1,880,334,463.74 |
| 11 | Sep 26, 2017 | Y | $6,399,328.00 | $1,880,334,463.74 |
| 12 | Jan 18, 2018 | C | $997,202.00 | $1,880,334,463.74 |
| 13 | Mar 5, 2018 | C | $300,486.00 | $1,880,334,463.74 |
| 14 | May 31, 2018 | B | $6,429,402.00 | $1,880,334,463.74 |
| 15 | Dec 6, 2018 | B | $1,000,000.00 | $1,880,334,463.74 |
| 16 | Feb 5, 2019 | C | $150,000.00 | $1,880,334,463.74 |
| 17 | Feb 14, 2019 | C | $1,571,237.00 | $1,880,334,463.74 |
| 18 | May 23, 2019 | B | $379,218.00 | $1,880,334,463.74 |
| 19 | Jul 18, 2019 | M | $0.00 | $1,880,334,463.74 |
| 20 | Jul 31, 2019 | B | $14,947,544.00 | $1,880,334,463.74 |
| 21 | Aug 16, 2019 | M | $0.00 | $1,880,334,463.74 |
| 22 | Jan 24, 2020 | M | $0.00 | $1,880,334,463.74 |
| 23 | Jan 31, 2020 | B | $10,000,000.00 | $1,880,334,463.74 |
| 24 | Mar 23, 2020 | B | $30,000,000.00 | $1,880,334,463.74 |
| 25 | May 31, 2020 | B | $0.00 | $1,880,334,463.74 |
| 26 | Jun 3, 2020 | B | $0.00 | $1,880,334,463.74 |
| 27 | Jun 4, 2020 | B | $40,000,000.00 | $1,880,334,463.74 |
| 28 | Jun 16, 2020 | B | -$20,063,389.00 | $1,880,334,463.74 |
| 29 | Jun 18, 2020 | C | $20,500,000.00 | $1,880,334,463.74 |
| 30 | Jul 17, 2020 | C | $17,270,150.58 | $1,880,334,463.74 |
| 31 | Sep 9, 2020 | B | $0.00 | $1,880,334,463.74 |
| 32 | Sep 28, 2020 | C | $67,000,000.00 | $1,880,334,463.74 |
| 33 | Nov 24, 2020 | B | $0.00 | $1,880,334,463.74 |
| 34 | Dec 14, 2020 | B | $13,194,915.42 | $1,880,334,463.74 |
| 35 | Jan 29, 2021 | B | $0.00 | $1,880,334,463.74 |
| 36 | Feb 4, 2021 | B | $0.00 | $1,880,334,463.74 |
| 37 | Feb 10, 2021 | M | $0.00 | $1,880,334,463.74 |
| 38 | Feb 12, 2021 | B | $0.00 | $1,880,334,463.74 |
| 39 | Feb 18, 2021 | B | $66,492,241.00 | $1,880,334,463.74 |
| 40 | Mar 10, 2021 | C | $40,000,000.00 | $1,880,334,463.74 |
| 41 | Mar 19, 2021 | V | $0.00 | $1,880,334,463.74 |
| 42 | Jun 10, 2021 | C | $0.00 | $1,880,334,463.74 |
| 43 | Jun 15, 2021 | C | $19,576,540.71 | $1,880,334,463.74 |
| 44 | Jun 30, 2021 | B | $0.00 | $1,880,334,463.74 |
| 45 | Jul 7, 2021 | B | $0.00 | $1,880,334,463.74 |
| 46 | Jul 8, 2021 | B | $46,525,321.00 | $1,880,334,463.74 |
| 47 | Jul 15, 2021 | C | -$25,000,000.00 | $1,880,334,463.74 |
| 48 | Jul 16, 2021 | C | $37,220,257.00 | $1,880,334,463.74 |
| 49 | Jul 16, 2021 | C | -$61,260,020.59 | $1,880,334,463.74 |
| 50 | Jul 30, 2021 | C | $61,260,020.59 | $1,880,334,463.74 |
| 51 | Aug 5, 2021 | M | $0.00 | $1,880,334,463.74 |
| 52 | Sep 14, 2021 | C | -$6,000,000.00 | $1,880,334,463.74 |
| 53 | Sep 23, 2021 | C | $4,738,730.77 | $1,880,334,463.74 |
| 54 | Nov 3, 2021 | B | $0.00 | $1,880,334,463.74 |
| 55 | Nov 9, 2021 | B | $0.00 | $1,880,334,463.74 |
| 56 | Nov 15, 2021 | C | $45,000,000.00 | $1,880,334,463.74 |
| 57 | Nov 18, 2021 | C | $684,342.64 | $1,880,334,463.74 |
| 58 | Dec 2, 2021 | B | $0.00 | $1,880,334,463.74 |
| 59 | Dec 2, 2021 | C | $332,940.00 | $1,880,334,463.74 |
| 60 | Dec 16, 2021 | C | $46,530,636.00 | $1,880,334,463.74 |
| 61 | Dec 23, 2021 | B | $6,000,000.00 | $1,880,334,463.74 |
| 62 | Mar 10, 2022 | C | $37,224,510.00 | $1,880,334,463.74 |
| 63 | Mar 31, 2022 | C | $8,003,018.00 | $1,880,334,463.74 |
| 64 | May 23, 2022 | C | $37,224,509.00 | $1,880,334,463.74 |
| 65 | May 25, 2022 | J | $0.00 | $1,880,334,463.74 |
| P00066 | Jul 1, 2022 | C | $13,198,203.00 | $1,880,334,463.74 |
| P00067 | Jul 22, 2022 | B | $0.00 | $1,880,334,463.74 |
| P00068 | Aug 2, 2022 | B | $50,000,000.00 | $1,880,334,463.74 |
| P00069 | Aug 11, 2022 | C | $2,182,641.00 | $1,880,334,463.74 |
| P00070 | Sep 22, 2022 | C | $0.00 | $1,880,334,463.74 |
| P00071 | Sep 22, 2022 | C | -$7,214,587.43 | $1,880,334,463.74 |
| P00072 | Sep 28, 2022 | C | $34,925,246.92 | $1,880,334,463.74 |
| P00073 | Oct 24, 2022 | B | $0.00 | $1,880,334,463.74 |
| P00074 | Nov 8, 2022 | B | $0.00 | $1,880,334,463.74 |
| P00075 | Nov 17, 2022 | B | $0.00 | $1,880,334,463.74 |
| P00076 | Dec 1, 2022 | C | $103,922,829.00 | $1,880,334,463.74 |
| P00077 | Dec 9, 2022 | B | $0.00 | $1,880,334,463.74 |
| P00078 | Dec 9, 2022 | M | $0.00 | $1,880,334,463.74 |
| P00079 | Dec 13, 2022 | B | $0.00 | $1,880,334,463.74 |
| P00080 | Jan 27, 2023 | B | $0.00 | $1,880,334,463.74 |
| P00081 | Feb 21, 2023 | C | $20,501,229.00 | $1,880,334,463.74 |
| P00082 | May 11, 2023 | C | $179,731.00 | $1,880,334,463.74 |
| P00083 | May 24, 2023 | B | $0.00 | $1,880,334,463.74 |
| P00085 | Jun 23, 2023 | C | $87,130,225.00 | $1,880,334,463.74 |
| P00084 | Jul 5, 2023 | B | $0.00 | $1,880,334,463.74 |
| P00086 | Jul 6, 2023 | M | $0.00 | $1,880,334,463.74 |
| P00087 | Sep 5, 2023 | B | $0.00 | $1,880,334,463.74 |
| P00088 | Sep 20, 2023 | B | $0.00 | $1,880,334,463.74 |
| P00089 | Sep 27, 2023 | C | $28,206,527.41 | $1,880,334,463.74 |
| P00091 | Oct 10, 2023 | M | $0.00 | $1,880,334,463.74 |
| P00092 | Nov 14, 2023 | C | $4,044,868.59 | $1,880,334,463.74 |
| P00093 | Dec 5, 2023 | M | $0.00 | $1,880,334,463.74 |
| P00094 | Dec 7, 2023 | P | $0.00 | $1,880,334,463.74 |
| P00095 | Dec 14, 2023 | M | $0.00 | $1,880,334,463.74 |
| P00096 | Dec 14, 2023 | C | $539,193.00 | $1,880,334,463.74 |
| P00098 | Feb 21, 2024 | B | $0.00 | $1,880,334,463.74 |
| P00099 | Mar 12, 2024 | M | $0.00 | $1,880,334,463.74 |
| P00100 | Mar 12, 2024 | C | $370,023.00 | $1,880,334,463.74 |
| P00101 | Mar 28, 2024 | M | $0.00 | $1,880,334,463.74 |
| P00102 | Apr 15, 2024 | C | $246,682.00 | $1,880,334,463.74 |
| P00103 | Apr 22, 2024 | C | $370,023.00 | $1,880,334,463.74 |
| P00097 | Apr 30, 2024 | B | $0.00 | $1,880,334,463.74 |
| P00104 | May 9, 2024 | C | $555,035.00 | $1,880,334,463.74 |
| P00105 | May 16, 2024 | C | $370,023.00 | $1,880,334,463.74 |
| P00106 | Jun 6, 2024 | C | $1,100,000.00 | $1,880,334,463.74 |
| P00107 | Jun 27, 2024 | C | $50,123,341.00 | $1,880,334,463.74 |
| P00108 | Aug 8, 2024 | C | $431,994.00 | $1,880,334,463.74 |
| P00109 | Aug 16, 2024 | C | $30,000,000.00 | $1,880,334,463.74 |
| P00110 | Aug 22, 2024 | C | -$85,141,277.24 | $1,880,334,463.74 |
| P00111 | Aug 27, 2024 | C | $25,473,287.79 | $1,880,334,463.74 |
| P00113 | Sep 26, 2024 | B | $113,187,302.22 | $1,880,334,463.74 |
| P00112 | Sep 27, 2024 | C | $13,557,151.88 | $1,880,334,463.74 |
| P00114 | Oct 7, 2024 | M | $0.00 | $1,880,334,463.74 |
| P00115 | Nov 20, 2024 | C | $20,959,174.54 | $1,880,334,463.74 |
| P00116 | Nov 26, 2024 | B | $0.00 | $1,880,334,463.74 |
| P00117 | Dec 9, 2024 | M | $0.00 | $1,880,334,463.74 |
| P00118 | Dec 17, 2024 | D | $0.00 | $1,880,334,463.74 |
| P00119 | Dec 20, 2024 | C | $33,500,000.00 | $1,880,334,463.74 |
| P00120 | Feb 10, 2025 | D | $0.00 | $1,880,334,463.74 |
| P00121 | Feb 19, 2025 | C | $102,396,433.20 | $1,880,334,463.74 |
| P00123 | Mar 14, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00125 | Mar 14, 2025 | C | $7,093,131.32 | $1,880,334,463.74 |
| P00122 | Mar 27, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00124 | Apr 4, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00126 | Apr 21, 2025 | D | $0.00 | $1,880,334,463.74 |
| P00127 | Apr 21, 2025 | C | $2,758,400.74 | $1,880,334,463.74 |
| P00128 | Jun 3, 2025 | M | $0.00 | $1,880,334,463.74 |
| P00129 | Jun 16, 2025 | C | $936,057.77 | $1,880,334,463.74 |
| P00130 | Jun 25, 2025 | M | $0.00 | $1,880,334,463.74 |
| P00132 | Jul 2, 2025 | C | $70,000,000.00 | $1,880,334,463.74 |
| P00131 | Jul 7, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00133 | Jul 7, 2025 | C | $20,000,000.00 | $1,880,334,463.74 |
| P00134 | Aug 11, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00135 | Sep 2, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00136 | Sep 15, 2025 | C | $1,000,000.00 | $1,880,334,463.74 |
| P00138 | Sep 26, 2025 | C | $66,664,205.20 | $1,880,334,463.74 |
| P00137 | Sep 29, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00139 | Oct 10, 2025 | M | $0.00 | $1,880,334,463.74 |
| P00140 | Oct 31, 2025 | D | $0.00 | $1,880,334,463.74 |
| P00142 | Nov 14, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00141 | Nov 17, 2025 | M | $0.00 | $1,880,334,463.74 |
| P00143 | Nov 19, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00144 | Nov 25, 2025 | C | $38,000,000.00 | $1,880,334,463.74 |
| P00145 | Dec 10, 2025 | D | $0.00 | $1,880,334,463.74 |
| P00146 | Dec 11, 2025 | B | $0.00 | $1,880,334,463.74 |
| P00147 | Dec 22, 2025 | C | $42,000,000.00 | $1,880,334,463.74 |
| P00148 | Jan 14, 2026 | C | $2,000,000.00 | $1,880,334,463.74 |
| P00149 | Jan 23, 2026 | B | $0.00 | $1,880,334,463.74 |
| P00150 | Jan 23, 2026 | C | $80,000,000.00 | $1,880,334,463.74 |
| P00151 | Feb 11, 2026 | B | $0.00 | $1,880,334,463.74 |
| P00152 | Feb 26, 2026 | B | $0.00 | $1,880,334,463.74 |
| P00153 | Mar 11, 2026 | M | $0.00 | $1,880,334,463.74 |
| P00154 | Apr 3, 2026 | M | $0.00 | $1,880,334,463.74 |
| P00155 | Apr 9, 2026 | C | -$1,109,661.73 | $1,880,334,463.74 |
| P00156 | Apr 10, 2026 | C | $23,623,770.00 | $1,880,334,463.74 |
| P00157 | Apr 22, 2026 | C | $0.00 | $1,880,334,463.74 |
| P00158 | Apr 23, 2026 | C | $672,000.00 | $1,880,334,463.74 |
| P00159 | Apr 29, 2026 | C | $20,000,000.00 | $1,880,334,463.74 |
| P00160 | May 20, 2026 | C | $573,614.00 | $1,880,334,463.74 |
| P00161 | Jun 1, 2026 | M | $0.00 | $1,880,334,463.74 |
| P00162 | Jun 17, 2026 | C | $4,837,000.00 | $1,880,334,463.74 |
| P00163 | Jun 17, 2026 | M | $0.00 | $1,880,334,463.74 |
| P00164 | Jun 22, 2026 | FUNDING ONLY ACTION | $15,000,000.00 | $1,880,334,463.74 |
| P00165 | Jun 30, 2026 | SUPPLEMENTAL AGREEME | $0.00 | $1,880,334,463.74 |
| P00166 | Jul 10, 2026 | CHANGE ORDER | $0.00 | $1,880,334,463.74 |
| P00167 | Jul 17, 2026 | FUNDING ONLY ACTION | $20,000,000.00 | $1,880,334,463.74 |
| P00168 | Aug 20, 2026 | C | $33,000,000.00 | $1,880,334,463.74 |
Provenance
Which source record produced each displayed rollup figure.
| Field | Source | File | Retrieved | Parser | Artifact hash |
|---|---|---|---|---|---|
| awarding_agency_id | USAspending.gov | — | Aug 22, 2026 | usaspending_contract_csv@2026.08.2 | decc620cc5d5 |
| contractor_id | USAspending.gov | — | Aug 22, 2026 | usaspending_contract_csv@2026.08.2 | decc620cc5d5 |
| current_award_value | USAspending.gov | — | Aug 22, 2026 | usaspending_contract_csv@2026.08.2 | decc620cc5d5 |
| naics_code | USAspending.gov | — | Aug 22, 2026 | usaspending_contract_csv@2026.08.2 | decc620cc5d5 |
| potential_award_value | USAspending.gov | — | Aug 22, 2026 | usaspending_contract_csv@2026.08.2 | decc620cc5d5 |
| psc_code | USAspending.gov | — | Aug 22, 2026 | usaspending_contract_csv@2026.08.2 | decc620cc5d5 |
| total_obligated | USAspending.gov | — | Aug 22, 2026 | usaspending_contract_csv@2026.08.2 | decc620cc5d5 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
This page is a record of one federal award, assembled from the transactions the government published against it. Note 1 describes where the rollup came from. Values are award values, not unit prices.
- 1Rollup values derive from 168 transaction records parsed from USAspending.gov, retrieved Aug 22, 2026 by transform awards@2026.08.1.
- 2Obligations are the sum of signed federal action obligations across all transactions; deobligations are negative and remain negative.
- 3Current and potential award values are taken from the latest reported action, not summed across modifications.