Contract award

LOCKHEED MARTIN CORP

THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT.
PIID
NNG09HR00C
Award key
CONT_AWD_NNG09HR00C_8000_-NONE-_-NONE-
Recipient UEI
FYHNA5WC8XD7
Source as of
Current award value
$2,127,139,4193
Obligated to date
$2,032,829,1352
Potential with options
$2,127,139,4193
Awarding agency
National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
Place of performance
Littleton, Colorado
Set-aside
No set-aside used
Pricing
Cost Plus Award Fee
Competition
Full and Open Competition3 offers received
Period of performance
Dec 4, 2008Apr 30, 2039Through Apr 30, 2039 if all options are exercised
Benchmark category
Unclassified

Transaction history

Every action recorded against this award, in the order the government reported them.

ModAction dateReasonObligationValue at action
0Dec 4, 2008Initial award$9,500,000.00$2,127,139,419.00
1Sep 10, 2009C$10,000,000.00$2,127,139,419.00
2Nov 17, 2009B$0.00$2,127,139,419.00
3Jan 21, 2010C$20,000,000.00$2,127,139,419.00
4Mar 15, 2010B$0.00$2,127,139,419.00
5Mar 31, 2010B$0.00$2,127,139,419.00
6Apr 5, 2010C$13,000,000.00$2,127,139,419.00
7Apr 5, 2010C$39,000,000.00$2,127,139,419.00
8Apr 16, 2010B$0.00$2,127,139,419.00
10Apr 27, 2010M$0.00$2,127,139,419.00
9Apr 27, 2010B$0.00$2,127,139,419.00
11May 14, 2010B$0.00$2,127,139,419.00
12Jun 1, 2010C$25,000,000.00$2,127,139,419.00
13Jun 16, 2010B$0.00$2,127,139,419.00
14Jul 2, 2010B$0.00$2,127,139,419.00
15Jul 6, 2010C$8,000,000.00$2,127,139,419.00
16Jul 16, 2010B$0.00$2,127,139,419.00
17Jul 21, 2010C$5,000,000.00$2,127,139,419.00
18Jul 27, 2010C$2,000,000.00$2,127,139,419.00
19Aug 23, 2010C$6,000,000.00$2,127,139,419.00
20Sep 8, 2010B$0.00$2,127,139,419.00
21Sep 27, 2010M$0.00$2,127,139,419.00
22Oct 27, 2010D$0.00$2,127,139,419.00
23Nov 19, 2010B$0.00$2,127,139,419.00
24Nov 24, 2010B$0.00$2,127,139,419.00
25Dec 3, 2010B$0.00$2,127,139,419.00
26Jan 18, 2011B$0.00$2,127,139,419.00
27Feb 4, 2011C$50,000,000.00$2,127,139,419.00
28Feb 15, 2011B$0.00$2,127,139,419.00
29Mar 1, 2011B$0.00$2,127,139,419.00
30Mar 3, 2011B$0.00$2,127,139,419.00
31Mar 3, 2011C$35,000,000.00$2,127,139,419.00
32Mar 11, 2011D$0.00$2,127,139,419.00
33Mar 17, 2011B$0.00$2,127,139,419.00
34Apr 8, 2011B$0.00$2,127,139,419.00
35Apr 15, 2011C$10,000,000.00$2,127,139,419.00
36May 5, 2011B$0.00$2,127,139,419.00
37May 10, 2011B$0.00$2,127,139,419.00
38May 12, 2011M$0.00$2,127,139,419.00
39May 27, 2011C$0.00$2,127,139,419.00
40Jun 2, 2011B$0.00$2,127,139,419.00
41Jun 3, 2011C$31,500,000.00$2,127,139,419.00
42Jun 16, 2011B$0.00$2,127,139,419.00
43Jul 5, 2011D$0.00$2,127,139,419.00
44Jul 5, 2011D$0.00$2,127,139,419.00
45Jul 5, 2011B$0.00$2,127,139,419.00
46Jul 13, 2011L$0.00$2,127,139,419.00
47Jul 27, 2011B$0.00$2,127,139,419.00
48Jul 27, 2011C$40,000,000.00$2,127,139,419.00
49Aug 4, 2011B$0.00$2,127,139,419.00
50Aug 23, 2011B$0.00$2,127,139,419.00
51Aug 31, 2011C$58,013,095.00$2,127,139,419.00
52Sep 12, 2011L$0.00$2,127,139,419.00
53Sep 12, 2011B$0.00$2,127,139,419.00
54Sep 30, 2011L$0.00$2,127,139,419.00
55Oct 11, 2011M$0.00$2,127,139,419.00
56Oct 27, 2011B$0.00$2,127,139,419.00
57Nov 9, 2011B$0.00$2,127,139,419.00
58Nov 17, 2011B$0.00$2,127,139,419.00
59Nov 21, 2011B$0.00$2,127,139,419.00
60Dec 1, 2011B$0.00$2,127,139,419.00
61Dec 1, 2011M$0.00$2,127,139,419.00
62Dec 8, 2011B$0.00$2,127,139,419.00
63Dec 23, 2011B$0.00$2,127,139,419.00
64Jan 4, 2012B$0.00$2,127,139,419.00
65Jan 5, 2012C$60,000,000.00$2,127,139,419.00
66Jan 11, 2012B$0.00$2,127,139,419.00
67Jan 17, 2012D$0.00$2,127,139,419.00
68Jan 20, 2012D$0.00$2,127,139,419.00
69Feb 13, 2012L$0.00$2,127,139,419.00
70Feb 27, 2012B$0.00$2,127,139,419.00
71Mar 14, 2012L$0.00$2,127,139,419.00
72Mar 14, 2012B$0.00$2,127,139,419.00
73Mar 15, 2012C$20,000,000.00$2,127,139,419.00
74Mar 23, 2012M$0.00$2,127,139,419.00
75Apr 18, 2012B$0.00$2,127,139,419.00
76Apr 18, 2012B$0.00$2,127,139,419.00
77Apr 19, 2012B$0.00$2,127,139,419.00
78May 4, 2012B$0.00$2,127,139,419.00
79May 11, 2012C$49,741,345.00$2,127,139,419.00
80May 23, 2012B$0.00$2,127,139,419.00
81Jul 3, 2012B$0.00$2,127,139,419.00
82Jul 23, 2012B$0.00$2,127,139,419.00
83Jul 25, 2012C$8,000,000.00$2,127,139,419.00
84Aug 9, 2012B$0.00$2,127,139,419.00
85Aug 9, 2012B$0.00$2,127,139,419.00
86Aug 10, 2012C$25,000,000.00$2,127,139,419.00
87Aug 15, 2012B$0.00$2,127,139,419.00
88Sep 25, 2012M$0.00$2,127,139,419.00
89Oct 15, 2012B$0.00$2,127,139,419.00
90Oct 15, 2012B$0.00$2,127,139,419.00
91Oct 22, 2012C$56,601,671.00$2,127,139,419.00
92Dec 4, 2012B$0.00$2,127,139,419.00
93Dec 7, 2012B$0.00$2,127,139,419.00
94Dec 7, 2012D$0.00$2,127,139,419.00
95Dec 17, 2012C$20,000,000.00$2,127,139,419.00
96Jan 11, 2013B$0.00$2,127,139,419.00
97Jan 25, 2013G$0.00$2,127,139,419.00
98Feb 1, 2013C$50,000,000.00$2,127,139,419.00
99Feb 9, 2013B$0.00$2,127,139,419.00
100Mar 29, 2013C$12,000,000.00$2,127,139,419.00
101Apr 1, 2013B$0.00$2,127,139,419.00
102Apr 11, 2013C$35,000,000.00$2,127,139,419.00
103Apr 25, 2013B$0.00$2,127,139,419.00
104May 20, 2013C$56,398,000.00$2,127,139,419.00
105Jun 12, 2013M$0.00$2,127,139,419.00
106Jun 14, 2013B$0.00$2,127,139,419.00
107Jul 18, 2013B$0.00$2,127,139,419.00
108Jul 18, 2013C$16,000,000.00$2,127,139,419.00
109Jul 30, 2013B$0.00$2,127,139,419.00
110Aug 8, 2013B$0.00$2,127,139,419.00
111Aug 19, 2013B$0.00$2,127,139,419.00
112Sep 3, 2013B$0.00$2,127,139,419.00
113Sep 20, 2013B$0.00$2,127,139,419.00
114Oct 29, 2013C$55,000,000.00$2,127,139,419.00
115Nov 22, 2013C$25,000,000.00$2,127,139,419.00
116Dec 13, 2013M$0.00$2,127,139,419.00
117Dec 23, 2013C$5,000,000.00$2,127,139,419.00
118Jan 15, 2014C$50,200,000.00$2,127,139,419.00
119Feb 18, 2014B$0.00$2,127,139,419.00
120Feb 18, 2014C$22,800,000.00$2,127,139,419.00
121Apr 4, 2014B$0.00$2,127,139,419.00
122Apr 15, 2014C$52,853,000.00$2,127,139,419.00
123Apr 23, 2014D$0.00$2,127,139,419.00
124Apr 28, 2014B$0.00$2,127,139,419.00
125May 30, 2014C$17,393,233.00$2,127,139,419.00
126Jun 19, 2014D$0.00$2,127,139,419.00
127Jun 23, 2014B$0.00$2,127,139,419.00
128Jul 3, 2014B$0.00$2,127,139,419.00
129Jul 7, 2014B$0.00$2,127,139,419.00
130Jul 9, 2014B$0.00$2,127,139,419.00
131Jul 22, 2014B$0.00$2,127,139,419.00
132Aug 5, 2014C$30,754,000.00$2,127,139,419.00
133Oct 30, 2014B$0.00$2,127,139,419.00
134Oct 30, 2014C$60,000,000.00$2,127,139,419.00
135Nov 16, 2014B$0.00$2,127,139,419.00
136Nov 20, 2014B$0.00$2,127,139,419.00
137Nov 25, 2014B$0.00$2,127,139,419.00
138Dec 1, 2014M$0.00$2,127,139,419.00
139Dec 9, 2014B$0.00$2,127,139,419.00
140Feb 9, 2015C$70,000,000.00$2,127,139,419.00
141Feb 19, 2015B$0.00$2,127,139,419.00
142Mar 8, 2015B$0.00$2,127,139,419.00
143Mar 23, 2015B$0.00$2,127,139,419.00
144May 27, 2015C$60,000,000.00$2,127,139,419.00
146Jun 12, 2015B$0.00$2,127,139,419.00
147Jun 15, 2015M$0.00$2,127,139,419.00
148Aug 21, 2015C$33,000,000.00$2,127,139,419.00
149Sep 11, 2015C$3,000,000.00$2,127,139,419.00
150Sep 21, 2015B$0.00$2,127,139,419.00
151Nov 27, 2015B$0.00$2,127,139,419.00
152Nov 27, 2015B$0.00$2,127,139,419.00
153Dec 7, 2015C$40,000,000.00$2,127,139,419.00
154Dec 16, 2015B$0.00$2,127,139,419.00
155Dec 24, 2015B$0.00$2,127,139,419.00
156Dec 29, 2015M$0.00$2,127,139,419.00
157Jan 7, 2016B$0.00$2,127,139,419.00
158Feb 29, 2016B$0.00$2,127,139,419.00
159Feb 29, 2016C$50,000,000.00$2,127,139,419.00
160Mar 11, 2016B$0.00$2,127,139,419.00
161Mar 11, 2016B$0.00$2,127,139,419.00
162Mar 21, 2016C$25,000,000.00$2,127,139,419.00
163Apr 4, 2016C$40,500,000.00$2,127,139,419.00
164May 2, 2016C$50,000,000.00$2,127,139,419.00
165Jun 1, 2016B$0.00$2,127,139,419.00
166Jun 2, 2016B$0.00$2,127,139,419.00
167Jun 13, 2016D$0.00$2,127,139,419.00
168Jun 14, 2016C$20,000,000.00$2,127,139,419.00
169Jun 23, 2016B$0.00$2,127,139,419.00
170Jun 23, 2016M$0.00$2,127,139,419.00
171Jun 24, 2016C$70,000,000.00$2,127,139,419.00
172Jul 13, 2016B$0.00$2,127,139,419.00
173Jul 13, 2016B$0.00$2,127,139,419.00
174Aug 11, 2016B$0.00$2,127,139,419.00
175Aug 15, 2016B$0.00$2,127,139,419.00
176Aug 17, 2016C$35,000,000.00$2,127,139,419.00
177Aug 23, 2016B$0.00$2,127,139,419.00
178Aug 29, 2016B$0.00$2,127,139,419.00
179Sep 2, 2016B$0.00$2,127,139,419.00
180Sep 26, 2016B$0.00$2,127,139,419.00
181Sep 26, 2016B$0.00$2,127,139,419.00
182Sep 30, 2016B$0.00$2,127,139,419.00
183Oct 17, 2016B$0.00$2,127,139,419.00
184Oct 26, 2016B$0.00$2,127,139,419.00
185Oct 27, 2016B$0.00$2,127,139,419.00
186Oct 28, 2016C$30,000,000.00$2,127,139,419.00
187Nov 10, 2016B$0.00$2,127,139,419.00
188Nov 23, 2016C$20,000,000.00$2,127,139,419.00
189Dec 19, 2016M$0.00$2,127,139,419.00
190Jan 3, 2017D$0.00$2,127,139,419.00
191Jan 25, 2017B$0.00$2,127,139,419.00
192Jan 30, 2017B$0.00$2,127,139,419.00
193Jan 31, 2017B$0.00$2,127,139,419.00
194Feb 13, 2017B$0.00$2,127,139,419.00
195Mar 8, 2017D$0.00$2,127,139,419.00
196Mar 9, 2017B$0.00$2,127,139,419.00
197Mar 22, 2017B$0.00$2,127,139,419.00
198Apr 13, 2017C$100,000,000.00$2,127,139,419.00
199May 25, 2017B$0.00$2,127,139,419.00
200May 30, 2017M$0.00$2,127,139,419.00
201Jun 6, 2017B$0.00$2,127,139,419.00
202Jun 12, 2017M$0.00$2,127,139,419.00
203Aug 10, 2017B$0.00$2,127,139,419.00
204Sep 6, 2017C$70,000,000.00$2,127,139,419.00
205Sep 20, 2017B$0.00$2,127,139,419.00
206Oct 16, 2017B$0.00$2,127,139,419.00
207Nov 15, 2017M$0.00$2,127,139,419.00
208Nov 27, 2017B$0.00$2,127,139,419.00
209Nov 30, 2017B$0.00$2,127,139,419.00
210Jan 11, 2018B$0.00$2,127,139,419.00
211Jan 12, 2018C$15,000,000.00$2,127,139,419.00
212Feb 8, 2018B$0.00$2,127,139,419.00
213Feb 15, 2018B$0.00$2,127,139,419.00
214Feb 21, 2018B$0.00$2,127,139,419.00
215Mar 6, 2018B$0.00$2,127,139,419.00
216Mar 7, 2018B$0.00$2,127,139,419.00
217Mar 7, 2018B$0.00$2,127,139,419.00
218Apr 27, 2018C$15,000,000.00$2,127,139,419.00
219May 17, 2018M$0.00$2,127,139,419.00
220Aug 3, 2018M$0.00$2,127,139,419.00
221Aug 6, 2018C$24,500,000.00$2,127,139,419.00
222Aug 28, 2018B$0.00$2,127,139,419.00
223Sep 4, 2018B$0.00$2,127,139,419.00
224Sep 19, 2018B$0.00$2,127,139,419.00
225Oct 4, 2018B$0.00$2,127,139,419.00
226Dec 14, 2018M$0.00$2,127,139,419.00
227Feb 19, 2019C$2,500,000.00$2,127,139,419.00
228Mar 26, 2019B$0.00$2,127,139,419.00
229May 30, 2019M$0.00$2,127,139,419.00
230Jun 20, 2019B$25,000,000.00$2,127,139,419.00
231Aug 23, 2019C$4,736,033.57$2,127,139,419.00
232Oct 10, 2019B$0.00$2,127,139,419.00
233Nov 6, 2019B$0.00$2,127,139,419.00
234Nov 25, 2019M$0.00$2,127,139,419.00
235Jan 22, 2020B$0.00$2,127,139,419.00
236Jan 30, 2020M$0.00$2,127,139,419.00
237Feb 27, 2020B$0.00$2,127,139,419.00
238Apr 22, 2020D$0.00$2,127,139,419.00
239Jun 2, 2020B$0.00$2,127,139,419.00
240Jun 9, 2020M$0.00$2,127,139,419.00
241Jun 30, 2020B$0.00$2,127,139,419.00
242Jul 2, 2020L$0.00$2,127,139,419.00
243Jul 15, 2020C$28,448,000.00$2,127,139,419.00
244Jul 30, 2020B$0.00$2,127,139,419.00
245Sep 3, 2020B$0.00$2,127,139,419.00
246Sep 28, 2020B$0.00$2,127,139,419.00
247Nov 10, 2020B$0.00$2,127,139,419.00
248Nov 24, 2020M$0.00$2,127,139,419.00
249Jan 8, 2021B$0.00$2,127,139,419.00
250Feb 26, 2021B$0.00$2,127,139,419.00
251Mar 15, 2021B$0.00$2,127,139,419.00
252Mar 25, 2021B$0.00$2,127,139,419.00
253Mar 31, 2021B$0.00$2,127,139,419.00
254Jun 16, 2021C$20,255,000.00$2,127,139,419.00
255Jun 30, 2021M$0.00$2,127,139,419.00
256Aug 11, 2021M$0.00$2,127,139,419.00
257Aug 25, 2021M$4,395,000.00$2,127,139,419.00
258Oct 18, 2021D$0.00$2,127,139,419.00
259Oct 21, 2021D$0.00$2,127,139,419.00
260Nov 18, 2021M$0.00$2,127,139,419.00
261Dec 7, 2021M$0.00$2,127,139,419.00
262Dec 14, 2021M$0.00$2,127,139,419.00
263Dec 21, 2021D$0.00$2,127,139,419.00
264Jan 18, 2022D$0.00$2,127,139,419.00
265Feb 23, 2022B$0.00$2,127,139,419.00
266Mar 15, 2022B$0.00$2,127,139,419.00
267Apr 11, 2022B$0.00$2,127,139,419.00
268May 23, 2022M$0.00$2,127,139,419.00
269May 27, 2022C$4,742,000.00$2,127,139,419.00
270Jun 6, 2022B$0.00$2,127,139,419.00
271Jun 15, 2022B$0.00$2,127,139,419.00
272Jul 13, 2022C$30,291,340.00$2,127,139,419.00
273Dec 7, 2022B$0.00$2,127,139,419.00
274Dec 12, 2022M$0.00$2,127,139,419.00
275Dec 21, 2022M$0.00$2,127,139,419.00
276Feb 24, 2023C$2,133,417.00$2,127,139,419.00
277Mar 28, 2023B$0.00$2,127,139,419.00
278May 1, 2023B$0.00$2,127,139,419.00
279May 25, 2023M$0.00$2,127,139,419.00
280Jun 8, 2023B$0.00$2,127,139,419.00
281Jun 29, 2023D$0.00$2,127,139,419.00
282Jul 5, 2023C$18,000,000.00$2,127,139,419.00
283Sep 15, 2023B$0.00$2,127,139,419.00
284Nov 27, 2023M$0.00$2,127,139,419.00
285Dec 14, 2023B$0.00$2,127,139,419.00
286Dec 22, 2023L$2,481,200.00$2,127,139,419.00
287Mar 5, 2024C$12,169,800.00$2,127,139,419.00
288Apr 26, 2024B$0.00$2,127,139,419.00
289May 3, 2024C$706,000.00$2,127,139,419.00
290May 28, 2024M$0.00$2,127,139,419.00
291Jun 21, 2024C$7,524,000.00$2,127,139,419.00
292Oct 16, 2024B$0.00$2,127,139,419.00
293Nov 13, 2024M$0.00$2,127,139,419.00
294Nov 22, 2024M$0.00$2,127,139,419.00
295Dec 4, 2024B$0.00$2,127,139,419.00
296Mar 20, 2025M$0.00$2,127,139,419.00
297Apr 10, 2025M$0.00$2,127,139,419.00
298May 7, 2025C$500,000.00$2,127,139,419.00
299Jun 4, 2025M$2,500,000.00$2,127,139,419.00
300Jul 14, 2025C$1,000,000.00$2,127,139,419.00
301Jul 14, 2025C$450,000.00$2,127,139,419.00
302Dec 30, 2025C$500,000.00$2,127,139,419.00
303Jan 16, 2026C$3,250,000.00$2,127,139,419.00
304Jan 16, 2026M$0.00$2,127,139,419.00
304AFeb 9, 2026M$0.00$2,127,139,419.00
305Feb 11, 2026C$0.00$2,127,139,419.00
306May 21, 2026M$0.00$2,127,139,419.00
307Jul 27, 2026C$493,000.00$2,127,139,419.00

Provenance

Which source record produced each displayed rollup figure.

FieldSourceFileRetrievedParserArtifact hash
awarding_agency_idUSAspending.govAug 10, 2026usaspending_contract_csv@2026.08.2a69e88c8f9c4
contractor_idUSAspending.govAug 10, 2026usaspending_contract_csv@2026.08.2a69e88c8f9c4
current_award_valueUSAspending.govAug 10, 2026usaspending_contract_csv@2026.08.2a69e88c8f9c4
naics_codeUSAspending.govAug 10, 2026usaspending_contract_csv@2026.08.2a69e88c8f9c4
potential_award_valueUSAspending.govAug 10, 2026usaspending_contract_csv@2026.08.2a69e88c8f9c4
psc_codeUSAspending.govAug 10, 2026usaspending_contract_csv@2026.08.2a69e88c8f9c4
total_obligatedUSAspending.govAug 10, 2026usaspending_contract_csv@2026.08.2a69e88c8f9c4

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

This page is a record of one federal award, assembled from the transactions the government published against it. Note 1 describes where the rollup came from. Values are award values, not unit prices.

  1. 1Rollup values derive from 308 transaction records parsed from USAspending.gov, retrieved Aug 10, 2026 by transform awards@2026.08.1.
  2. 2Obligations are the sum of signed federal action obligations across all transactions; deobligations are negative and remain negative.
  3. 3Current and potential award values are taken from the latest reported action, not summed across modifications.