Contract award
KBR WYLE SERVICES, LLC
THE OVERALL SCOPE OF THIS CONTRACT IS TO PROVIDE WALLOPS RANGE OPERATIONS AND MAINTENANCE SUPPORT SERVICES TRAINING COMMAND, CONTROL, COMMUNICATIONS, INFORMATION AND COMPUTER SYSTEMS SERVICES TESTING, MODIFYING AND INSTALLING COMMUNICATIONS AND ELECTRONIC SYSTEMS AT LAUNCH FACILITIES, LAUNCH CONTROL CENTERS AND TEST FACILITIES RANGE SUSTAINING ENGINEERING SERVICES, AND GROUND OPERATIONS SUPPORT. THIS EFFORT PROVIDES DIRECT CUSTOMER SUPPORT TO NASA WFF'S RANGE BY PROVIDING QUALIFIED PERSONNEL, EQUIPMENT, TOOLS, MATERIALS, VEHICLES, SPECIALIZED TEST EQUIPMENT, SUPERVISION, AND OTHER SERVICES. NASA'S WFF REQUIRES AN INNOVATIVE, INTEGRATED, FLEXIBLE AND EFFECTIVE MANAGEMENT APPROACH AND THE CONTRACTOR MUST PROVIDE TECHNICAL SUPPORT IN A PLANNED AND COORDINATED MANNER WHICH WILL ENSURE ESSENTIAL WALLOPS RANGE SUPPORT SYSTEMS ARE READY TO SUPPORT USER REQUIREMENTS, AND CAUSE NO IMPACT TO WALLOPS RANGE PROGRAM SCHEDULES DUE TO EQUIPMENT DEGRADATION, FAILURES, SYSTEM PROBLEMS OR REPRIORITIZATION OF PREEXISTING PROGRAM REQUIREMENTS. THE WIDE VARIETY OF SUPPORT SYSTEMS INVOLVES FLEXIBLE WORKLOAD PLANNING, COST MANAGEMENT, AND SCHEDULING OF RESOURCES TO IDENTIFY AND RESOLVE TECHNICAL SYSTEMS PROBLEMS. AVAILABLE CAPACITY FOR OPERATIONS, MAINTENANCE, AND SUSTAINING ENGINEERING MAY BE MADE AVAILABLE TO OTHER WFF ORGANIZATIONS WITH THE PERMISSION OF THE CONTRACTING OFFICER'S REPRESENTATIVE (COR), AND RMMO MANAGEMENT. INSTRUMENTATION SYSTEMS ARE PERMANENTLY LOCATED AT WFF, BERMUDA, AND IN ALASKA. IN ADDITION, MOBILE INSTRUMENTATION IS DEPLOYED TO LOCATIONS WORLDWIDE, INCLUDING BUT NOT LIMITED TO NORWAY KWAJALEIN ATOLL COQUINA, NC AUSTRALIA AND FRENCH GUIANA TO MEET RANGE CUSTOMER REQUIREMENTS. THE WALLOPS RANGE RECEIVES AND PROVIDES RANGE SUPPORT FROM AND TO VARIOUS AGENCIES. THE WALLOPS RANGE CONSTANTLY STRIVES TO ENSURE IT IS PREPARED TO ACCOMMODATE THE CURRENT AND FUTURE NEEDS OF ITS CUSTOMERS. TO THAT END, THE CONTRACTOR SHALL PURSUE ONGOING PREVENTIVE AND CORRECTIVE MAINTENANCE AND SUSTAINING ENGINEERING TASKS TO ENSURE READINESS AND MITIGATE THE EFFECTS OF OBSOLESCENCE OF ITS CURRENT RANGE EQUIPMENT AND SYSTEMS. THE CONTRACTOR SHALL ALSO WORK WITH RMMO IN COOPERATION WITH OTHER NASA CENTERS AND ORGANIZATIONS TO MAINTAIN AND SUSTAIN RANGE SYSTEMS TO COMMON STANDARDS. THE CONTRACTOR SHALL WORK WITH WFF ORGANIZATIONS AND PROVIDE OPERATIONAL REQUIREMENTS TO SUPPORT NEW ENGINEERING AND/OR TECHNOLOGY DEVELOPMENT ACTIVITIES APPROVED BY THE RANGE. SUCH ACTIVITIES ENABLE THE EVOLUTION OF THE RANGE ARCHITECTURE TO INCLUDE SPACE-BASED METRIC TRACKING, TELEMETRY, AND COMMAND RELAY, AND MISSION PLANNING SYSTEMS. THE CONTRACTOR SHALL ALSO PROVIDE OPERATIONAL REQUIREMENTS AND SUPPORT TRANSITIONING NEW ENGINEERING OR TECHNOLOGY DEVELOPMENTS TO OPERATIONS.
- PIID
- 80GSFC19C0013
- Award key
- CONT_AWD_80GSFC19C0013_8000_-NONE-_-NONE-
- Recipient UEI
- HYBLSJAMM2F4
- Source as of
- —
Current award value
$270,000,0003
Obligated to date
$241,918,1122
Potential with options
$270,000,0003
- Awarding agency
- National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
- Contractor
- KBR WYLE SERVICES, LLC
- PSC
- —
- Place of performance
- Wallops Island, Virginia
- Set-aside
- No set-aside used
- Pricing
- Cost Plus Fixed Fee
- Competition
- Full and Open Competition3 offers received
- Period of performance
- Aug 10, 2019 — Jun 30, 2026Through Jun 30, 2026 if all options are exercised
- Benchmark category
- Unclassified
Transaction history
Every action recorded against this award, in the order the government reported them.
| Mod | Action date | Reason | Obligation | Value at action |
|---|---|---|---|---|
| 0 | Jun 6, 2019 | Initial award | $0.00 | $270,000,000.00 |
| P00001 | Jun 17, 2019 | C | $2,500,000.00 | $270,000,000.00 |
| P00002 | Jun 27, 2019 | B | $0.00 | $270,000,000.00 |
| P00003 | Jul 31, 2019 | C | $906,512.32 | $270,000,000.00 |
| P00004 | Aug 23, 2019 | C | $2,483,983.65 | $270,000,000.00 |
| P00005 | Sep 18, 2019 | C | $5,974,301.66 | $270,000,000.00 |
| P00006 | Sep 20, 2019 | C | $25,164.86 | $270,000,000.00 |
| P00007 | Sep 26, 2019 | C | $3,089,183.12 | $270,000,000.00 |
| P00008 | Sep 30, 2019 | C | $1,490,423.92 | $270,000,000.00 |
| P00009 | Oct 22, 2019 | C | $2,186,213.07 | $270,000,000.00 |
| P00010 | Nov 19, 2019 | C | $3,524,758.71 | $270,000,000.00 |
| P00011 | Dec 17, 2019 | C | $1,085,986.79 | $270,000,000.00 |
| P00012 | Jan 17, 2020 | C | $3,047,750.95 | $270,000,000.00 |
| P00013 | Feb 19, 2020 | C | $4,843,422.07 | $270,000,000.00 |
| P00014 | Mar 19, 2020 | C | $2,823,032.53 | $270,000,000.00 |
| P00015 | Apr 22, 2020 | C | $2,335,552.50 | $270,000,000.00 |
| P00016 | May 18, 2020 | C | $0.00 | $270,000,000.00 |
| P00017 | Jul 22, 2020 | C | $472,524.22 | $270,000,000.00 |
| P00018 | Jul 22, 2020 | C | $1,316,883.79 | $270,000,000.00 |
| P00019 | Jul 30, 2020 | C | $972,180.04 | $270,000,000.00 |
| P00020 | Aug 19, 2020 | C | $3,760,526.59 | $270,000,000.00 |
| P00021 | Sep 21, 2020 | M | $0.00 | $270,000,000.00 |
| P00022 | Sep 21, 2020 | C | $10,048,864.27 | $270,000,000.00 |
| P00023 | Oct 23, 2020 | C | $187,967.09 | $270,000,000.00 |
| P00024 | Nov 18, 2020 | C | $1,377,434.01 | $270,000,000.00 |
| P00025 | Dec 17, 2020 | C | $790,330.80 | $270,000,000.00 |
| P00026 | Jan 19, 2021 | C | -$70,268.38 | $270,000,000.00 |
| P00027 | Feb 17, 2021 | C | $10,958,842.30 | $270,000,000.00 |
| P00028 | Mar 22, 2021 | C | $504,431.78 | $270,000,000.00 |
| P00029 | Apr 15, 2021 | C | $1,291,381.00 | $270,000,000.00 |
| P00030 | Apr 23, 2021 | M | $0.00 | $270,000,000.00 |
| P00031 | May 18, 2021 | C | $215,154.64 | $270,000,000.00 |
| P00032 | Jun 21, 2021 | C | $2,777,047.12 | $270,000,000.00 |
| P00033 | Jul 16, 2021 | C | $483,908.15 | $270,000,000.00 |
| P00034 | Jul 27, 2021 | C | $370,166.35 | $270,000,000.00 |
| P00035 | Aug 5, 2021 | C | $663,117.26 | $270,000,000.00 |
| P00036 | Aug 19, 2021 | C | $1,504,080.04 | $270,000,000.00 |
| P00037 | Aug 27, 2021 | C | -$150,261.75 | $270,000,000.00 |
| P00038 | Sep 7, 2021 | C | -$181,459.57 | $270,000,000.00 |
| P00039 | Sep 15, 2021 | C | $10,194,342.20 | $270,000,000.00 |
| P00040 | Sep 28, 2021 | M | $0.00 | $270,000,000.00 |
| P00041 | Oct 6, 2021 | M | $0.00 | $270,000,000.00 |
| P00042 | Oct 19, 2021 | C | $779,266.43 | $270,000,000.00 |
| P00043 | Nov 17, 2021 | C | $2,125,417.00 | $270,000,000.00 |
| P00044 | Dec 15, 2021 | C | $2,743,253.97 | $270,000,000.00 |
| P00045 | Dec 22, 2021 | D | $0.00 | $270,000,000.00 |
| P00046 | Jan 19, 2022 | C | $2,864,406.15 | $270,000,000.00 |
| P00047 | Feb 9, 2022 | C | -$127,219.99 | $270,000,000.00 |
| P00048 | Feb 16, 2022 | C | $1,908,827.72 | $270,000,000.00 |
| P00049 | Mar 17, 2022 | C | $1,805,633.21 | $270,000,000.00 |
| P00050 | Apr 20, 2022 | C | $1,884,851.79 | $270,000,000.00 |
| P00051 | May 18, 2022 | M | $0.00 | $270,000,000.00 |
| P00052 | May 19, 2022 | C | $1,650,403.70 | $270,000,000.00 |
| P00053 | Jun 23, 2022 | C | $904,772.60 | $270,000,000.00 |
| P00054 | Jun 29, 2022 | C | $233,653.19 | $270,000,000.00 |
| P00055 | Jul 18, 2022 | C | $986,900.77 | $270,000,000.00 |
| P00056 | Jul 29, 2022 | C | $1,156,924.31 | $270,000,000.00 |
| P00057 | Aug 22, 2022 | M | $0.00 | $270,000,000.00 |
| P00058 | Aug 22, 2022 | C | $12,261,090.67 | $270,000,000.00 |
| P00059 | Sep 21, 2022 | C | $5,866,744.46 | $270,000,000.00 |
| P00060 | Sep 28, 2022 | C | $77,011.06 | $270,000,000.00 |
| P00061 | Oct 19, 2022 | C | $118,820.00 | $270,000,000.00 |
| P00062 | Nov 18, 2022 | C | $1,867,871.07 | $270,000,000.00 |
| P00063 | Dec 15, 2022 | C | $2,453,048.94 | $270,000,000.00 |
| P00064 | Jan 19, 2023 | C | $2,428,199.43 | $270,000,000.00 |
| P00065 | Feb 21, 2023 | C | $1,510,300.97 | $270,000,000.00 |
| P00066 | Mar 16, 2023 | M | $0.00 | $270,000,000.00 |
| P00067 | Mar 20, 2023 | C | $1,134,890.64 | $270,000,000.00 |
| P00068 | Mar 22, 2023 | C | -$11,355.00 | $270,000,000.00 |
| P00069 | Apr 20, 2023 | C | $3,805,952.86 | $270,000,000.00 |
| P00070 | May 10, 2023 | M | $0.00 | $270,000,000.00 |
| P00071 | May 23, 2023 | C | $904,193.64 | $270,000,000.00 |
| P00072 | Jun 20, 2023 | C | $4,733,153.04 | $270,000,000.00 |
| P00073 | Jul 3, 2023 | D | $0.00 | $270,000,000.00 |
| P00074 | Jul 19, 2023 | C | $4,953,753.38 | $270,000,000.00 |
| P00075 | Aug 17, 2023 | C | $6,857,973.58 | $270,000,000.00 |
| P00076 | Sep 20, 2023 | C | $6,517,735.10 | $270,000,000.00 |
| P00077 | Oct 2, 2023 | M | $0.00 | $270,000,000.00 |
| P00078 | Oct 19, 2023 | C | $443,708.53 | $270,000,000.00 |
| P00079 | Nov 16, 2023 | C | $217,279.65 | $270,000,000.00 |
| P00080 | Dec 20, 2023 | C | $1,093,000.00 | $270,000,000.00 |
| P00081 | Jan 22, 2024 | C | $44,839.63 | $270,000,000.00 |
| P00082 | Feb 20, 2024 | C | $351,668.93 | $270,000,000.00 |
| P00083 | Mar 4, 2024 | B | $0.00 | $270,000,000.00 |
| P00084 | Mar 19, 2024 | C | $308,920.13 | $270,000,000.00 |
| P00085 | Apr 16, 2024 | M | $0.00 | $270,000,000.00 |
| P00086 | Apr 17, 2024 | C | $1,631,222.16 | $270,000,000.00 |
| P00087 | Apr 25, 2024 | C | $2,186,922.92 | $270,000,000.00 |
| P00088 | May 20, 2024 | C | $2,688,598.14 | $270,000,000.00 |
| P00089 | Jun 5, 2024 | C | $48,602.89 | $270,000,000.00 |
| P00090 | Jun 17, 2024 | C | $2,615,158.36 | $270,000,000.00 |
| P00091 | Jun 27, 2024 | C | $206,305.66 | $270,000,000.00 |
| P00092 | Jul 26, 2024 | J | $0.00 | $270,000,000.00 |
| P00093 | Jul 30, 2024 | C | $1,556,164.53 | $270,000,000.00 |
| P00094 | Aug 5, 2024 | M | $0.00 | $270,000,000.00 |
| P00095 | Aug 16, 2024 | C | $6,912,465.60 | $270,000,000.00 |
| P00096 | Sep 5, 2024 | M | $0.00 | $270,000,000.00 |
| P00097 | Sep 5, 2024 | C | $123,831.00 | $270,000,000.00 |
| P00098 | Sep 18, 2024 | C | $5,529,008.90 | $270,000,000.00 |
| P00099 | Sep 25, 2024 | C | $13,189.01 | $270,000,000.00 |
| P00100 | Oct 21, 2024 | C | $4,122,637.02 | $270,000,000.00 |
| P00101 | Nov 14, 2024 | M | $0.00 | $270,000,000.00 |
| P00102 | Nov 22, 2024 | C | $859,913.12 | $270,000,000.00 |
| P00103 | Dec 9, 2024 | B | $0.00 | $270,000,000.00 |
| P00104 | Dec 18, 2024 | C | $4,050,724.76 | $270,000,000.00 |
| P00105 | Jan 21, 2025 | C | $146,486.79 | $270,000,000.00 |
| P00106 | Feb 19, 2025 | C | $5,022,946.93 | $270,000,000.00 |
| P00107 | Mar 12, 2025 | C | $500,403.99 | $270,000,000.00 |
| P00108 | Apr 15, 2025 | C | $1,095,101.04 | $270,000,000.00 |
| P00109 | May 6, 2025 | C | $2,698,699.32 | $270,000,000.00 |
| P00110 | May 19, 2025 | C | $824,272.91 | $270,000,000.00 |
| P00111 | Jun 17, 2025 | C | $655,576.22 | $270,000,000.00 |
| P00112 | Jul 21, 2025 | C | $4,254,041.99 | $270,000,000.00 |
| P00113 | Aug 5, 2025 | B | $0.00 | $270,000,000.00 |
| P00114 | Aug 5, 2025 | C | $823,392.64 | $270,000,000.00 |
| P00115 | Aug 20, 2025 | C | $7,323,797.75 | $270,000,000.00 |
| P00116 | Sep 16, 2025 | C | -$42,144.46 | $270,000,000.00 |
| P00117 | Sep 17, 2025 | C | $5,609,848.37 | $270,000,000.00 |
| P00118 | Sep 23, 2025 | M | $0.00 | $270,000,000.00 |
| P00119 | Dec 18, 2025 | C | $1,761,101.74 | $270,000,000.00 |
| P00120 | Jan 7, 2026 | C | $200,000.00 | $270,000,000.00 |
| P00121 | Jan 20, 2026 | M | $0.00 | $270,000,000.00 |
| P00122 | Jan 21, 2026 | C | $229,806.17 | $270,000,000.00 |
| P00123 | Feb 11, 2026 | B | $0.00 | $270,000,000.00 |
| P00124 | Feb 18, 2026 | C | $2,815,312.37 | $270,000,000.00 |
| P00125 | Mar 19, 2026 | C | $5,730,902.40 | $270,000,000.00 |
| P00126 | Apr 20, 2026 | C | $1,374,446.94 | $270,000,000.00 |
| P00127 | May 18, 2026 | M | $0.00 | $270,000,000.00 |
| P00128 | May 19, 2026 | C | $4,770,108.52 | $270,000,000.00 |
| P00129 | Jun 17, 2026 | C | $573,507.08 | $270,000,000.00 |
| P00130 | Jul 23, 2026 | C | $2,053,489.50 | $270,000,000.00 |
| P00131 | Aug 24, 2026 | C | $232,685.47 | $270,000,000.00 |
| P00132 | Sep 18, 2026 | C | $60,214.19 | $270,000,000.00 |
Provenance
Which source record produced each displayed rollup figure.
| Field | Source | File | Retrieved | Parser | Artifact hash |
|---|---|---|---|---|---|
| awarding_agency_id | USAspending.gov | — | Sep 20, 2026 | usaspending_contract_csv@2026.08.2 | 7ae000d9cad0 |
| contractor_id | USAspending.gov | — | Sep 20, 2026 | usaspending_contract_csv@2026.08.2 | 7ae000d9cad0 |
| current_award_value | USAspending.gov | — | Sep 20, 2026 | usaspending_contract_csv@2026.08.2 | 7ae000d9cad0 |
| naics_code | USAspending.gov | — | Sep 20, 2026 | usaspending_contract_csv@2026.08.2 | 7ae000d9cad0 |
| potential_award_value | USAspending.gov | — | Sep 20, 2026 | usaspending_contract_csv@2026.08.2 | 7ae000d9cad0 |
| psc_code | USAspending.gov | — | Sep 20, 2026 | usaspending_contract_csv@2026.08.2 | 7ae000d9cad0 |
| total_obligated | USAspending.gov | — | Sep 20, 2026 | usaspending_contract_csv@2026.08.2 | 7ae000d9cad0 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
This page is a record of one federal award, assembled from the transactions the government published against it. Note 1 describes where the rollup came from. Values are award values, not unit prices.
- 1Rollup values derive from 133 transaction records parsed from USAspending.gov, retrieved Sep 20, 2026 by transform awards@2026.08.1.
- 2Obligations are the sum of signed federal action obligations across all transactions; deobligations are negative and remain negative.
- 3Current and potential award values are taken from the latest reported action, not summed across modifications.