Contract award
THE UNIVERSITY OF IOWA
THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS) IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.
- PIID
- 80GSFC18C0008
- Award key
- CONT_AWD_80GSFC18C0008_8000_-NONE-_-NONE-
- Recipient UEI
- Z1H9VJS8NG16
- Source as of
- —
Current award value
$184,314,7933
Obligated to date
$184,314,7932
Potential with options
$184,314,7933
- Awarding agency
- National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
- Contractor
- THE UNIVERSITY OF IOWA
- Place of performance
- Iowa City, Iowa
- Set-aside
- No set-aside used
- Pricing
- Cost No Fee
- Competition
- Full and Open Competition2 offers received
- Period of performance
- Mar 5, 2018 — Nov 30, 2026Through Nov 30, 2026 if all options are exercised
- Benchmark category
- Unclassified
Transaction history
Every action recorded against this award, in the order the government reported them.
| Mod | Action date | Reason | Obligation | Value at action |
|---|---|---|---|---|
| 0 | Mar 5, 2018 | Initial award | $0.00 | $184,314,792.75 |
| P00001 | Mar 5, 2018 | C | $1,250,000.00 | $184,314,792.75 |
| P00002 | Apr 5, 2018 | M | $0.00 | $184,314,792.75 |
| P00003 | Feb 14, 2019 | M | $0.00 | $184,314,792.75 |
| P00004 | Jun 26, 2019 | M | $0.00 | $184,314,792.75 |
| P00005 | Jul 18, 2019 | D | $0.00 | $184,314,792.75 |
| P00006 | Jul 18, 2019 | C | $18,364.00 | $184,314,792.75 |
| P00007 | Aug 7, 2019 | M | $0.00 | $184,314,792.75 |
| P00008 | Oct 21, 2019 | D | $0.00 | $184,314,792.75 |
| P00009 | Oct 21, 2019 | C | $1,000,000.00 | $184,314,792.75 |
| P00010 | Mar 10, 2020 | B | $0.00 | $184,314,792.75 |
| P00011 | Apr 16, 2020 | B | $0.00 | $184,314,792.75 |
| P00012 | May 15, 2020 | L | $1,078,686.67 | $184,314,792.75 |
| P00013 | May 22, 2020 | D | $1,173,243.07 | $184,314,792.75 |
| P00014 | Jul 6, 2020 | B | $0.00 | $184,314,792.75 |
| P00015 | Aug 27, 2020 | B | $6,243,803.89 | $184,314,792.75 |
| P00016 | Sep 15, 2020 | B | $16,538,902.37 | $184,314,792.75 |
| P00017 | Sep 28, 2020 | B | $620,953.97 | $184,314,792.75 |
| P00018 | Oct 8, 2020 | B | $3,747,133.74 | $184,314,792.75 |
| P00019 | Oct 30, 2020 | B | $110,464.58 | $184,314,792.75 |
| P00020 | Nov 12, 2020 | B | $824,091.75 | $184,314,792.75 |
| P00021 | Jan 7, 2021 | M | $0.00 | $184,314,792.75 |
| P00022 | Feb 4, 2021 | B | $0.00 | $184,314,792.75 |
| P00023 | Apr 7, 2021 | M | $0.00 | $184,314,792.75 |
| P00024 | May 13, 2021 | B | $0.00 | $184,314,792.75 |
| P00025 | Jun 28, 2021 | B | $1,534,949.49 | $184,314,792.75 |
| P00026 | Sep 1, 2021 | B | $0.00 | $184,314,792.75 |
| P00027 | Sep 30, 2021 | B | $331,099.33 | $184,314,792.75 |
| P00028 | Oct 12, 2021 | B | $3,538,227.00 | $184,314,792.75 |
| P00029 | Oct 15, 2021 | D | $0.00 | $184,314,792.75 |
| P00030 | Nov 17, 2021 | B | $0.00 | $184,314,792.75 |
| P00031 | Dec 16, 2021 | B | $15,666,894.09 | $184,314,792.75 |
| P00032 | Jan 27, 2022 | B | $2,381,406.85 | $184,314,792.75 |
| P00033 | Feb 10, 2022 | B | $0.00 | $184,314,792.75 |
| P00034 | Mar 2, 2022 | B | $4,620,656.57 | $184,314,792.75 |
| P00035 | Mar 31, 2022 | B | $0.00 | $184,314,792.75 |
| P00036 | Apr 26, 2022 | B | $3,723,206.31 | $184,314,792.75 |
| P00037 | Jun 1, 2022 | B | $4,257,712.17 | $184,314,792.75 |
| P00038 | Jun 29, 2022 | M | $0.00 | $184,314,792.75 |
| P00039 | Jul 12, 2022 | B | $0.00 | $184,314,792.75 |
| P00040 | Jul 28, 2022 | B | $59,465,942.73 | $184,314,792.75 |
| P00041 | Aug 30, 2022 | C | $8,000,000.00 | $184,314,792.75 |
| P00042 | Dec 1, 2022 | B | $0.00 | $184,314,792.75 |
| P00043 | Jun 8, 2023 | B | $0.00 | $184,314,792.75 |
| P00044 | Jun 8, 2023 | B | $0.00 | $184,314,792.75 |
| P00045 | Jun 13, 2023 | C | $481,686.95 | $184,314,792.75 |
| P00046 | Sep 5, 2023 | C | $13,005,991.93 | $184,314,792.75 |
| P00047 | Sep 26, 2023 | B | $0.00 | $184,314,792.75 |
| P00048 | Nov 20, 2023 | B | $0.00 | $184,314,792.75 |
| P00049 | May 6, 2024 | B | $3,000,352.68 | $184,314,792.75 |
| P00050 | Jul 26, 2024 | M | $0.00 | $184,314,792.75 |
| P00051 | Sep 20, 2024 | C | $5,050,158.53 | $184,314,792.75 |
| P00052 | Jan 8, 2025 | B | $2,400,000.00 | $184,314,792.75 |
| P00053 | Jan 15, 2025 | D | $0.00 | $184,314,792.75 |
| P00054 | Feb 6, 2025 | D | $0.00 | $184,314,792.75 |
| P00055 | Mar 7, 2025 | B | $747,000.00 | $184,314,792.75 |
| P00056 | Mar 14, 2025 | B | $447,345.00 | $184,314,792.75 |
| P00057 | Mar 21, 2025 | B | $0.00 | $184,314,792.75 |
| P00058 | Mar 21, 2025 | M | $0.00 | $184,314,792.75 |
| P00059 | Apr 11, 2025 | L | $665,615.61 | $184,314,792.75 |
| P00060 | Apr 30, 2025 | M | $0.00 | $184,314,792.75 |
| P00061 | May 5, 2025 | M | $3,574,338.10 | $184,314,792.75 |
| P00062 | May 12, 2025 | C | $77,509.28 | $184,314,792.75 |
| P00063 | Jun 5, 2025 | C | $282,046.29 | $184,314,792.75 |
| P00064 | Jun 13, 2025 | B | $1,200,000.00 | $184,314,792.75 |
| P00065 | Jun 23, 2025 | C | $1,600,000.00 | $184,314,792.75 |
| P00066 | Jul 21, 2025 | M | $2,977,445.80 | $184,314,792.75 |
| P00067 | Aug 19, 2025 | C | $578,190.92 | $184,314,792.75 |
| P00068 | Aug 21, 2025 | D | $0.00 | $184,314,792.75 |
| P00069 | Sep 5, 2025 | B | $4,529,675.92 | $184,314,792.75 |
| P00070 | Dec 3, 2025 | M | $2,000,000.00 | $184,314,792.75 |
| P00071 | Jan 13, 2026 | D | $0.00 | $184,314,792.75 |
| P00072 | Jan 30, 2026 | B | $2,691,860.69 | $184,314,792.75 |
| P00073 | Mar 18, 2026 | D | $0.00 | $184,314,792.75 |
| P00074 | Apr 30, 2026 | D | $2,261,410.31 | $184,314,792.75 |
| P00075 | May 20, 2026 | C | $311,197.04 | $184,314,792.75 |
| P00076 | Jun 18, 2026 | M | $0.00 | $184,314,792.75 |
| P00077 | Jul 20, 2026 | C | $307,229.12 | $184,314,792.75 |
| P00078 | Aug 26, 2026 | M | $0.00 | $184,314,792.75 |
Provenance
Which source record produced each displayed rollup figure.
| Field | Source | File | Retrieved | Parser | Artifact hash |
|---|---|---|---|---|---|
| awarding_agency_id | USAspending.gov | — | Sep 2, 2026 | usaspending_contract_csv@2026.08.2 | 3d93a8bb53b7 |
| contractor_id | USAspending.gov | — | Sep 2, 2026 | usaspending_contract_csv@2026.08.2 | 3d93a8bb53b7 |
| current_award_value | USAspending.gov | — | Sep 2, 2026 | usaspending_contract_csv@2026.08.2 | 3d93a8bb53b7 |
| naics_code | USAspending.gov | — | Sep 2, 2026 | usaspending_contract_csv@2026.08.2 | 3d93a8bb53b7 |
| potential_award_value | USAspending.gov | — | Sep 2, 2026 | usaspending_contract_csv@2026.08.2 | 3d93a8bb53b7 |
| psc_code | USAspending.gov | — | Sep 2, 2026 | usaspending_contract_csv@2026.08.2 | 3d93a8bb53b7 |
| total_obligated | USAspending.gov | — | Sep 2, 2026 | usaspending_contract_csv@2026.08.2 | 3d93a8bb53b7 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
This page is a record of one federal award, assembled from the transactions the government published against it. Note 1 describes where the rollup came from. Values are award values, not unit prices.
- 1Rollup values derive from 79 transaction records parsed from USAspending.gov, retrieved Sep 2, 2026 by transform awards@2026.08.1.
- 2Obligations are the sum of signed federal action obligations across all transactions; deobligations are negative and remain negative.
- 3Current and potential award values are taken from the latest reported action, not summed across modifications.