Contractor
URBAN ELECTRIC, INC
- UEI
- C4DSLZNYMPV3
- Parent UEI
- C4DSLZNYMPV3
- Resolved by
- uei
- Confidence
- 1.000
Active from Mar 11, 2026 to Aug 3, 2026.
What they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Electrical Contracting | 2 | $649,257 |
| Commercial Building Construction | 1 | $5,100,000 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 697DCK26C00154 INTERNET PROTOCOL VOICE COMMUNICATION SYSTEMS | Department of Transportation | GA | Jun 17, 2026 | $1,200,000 |
| 697DCK26C00086 TOWER SIMULATOR SYSTEM (TSS) STANDALONE SIMULATION SYSTEM | Department of Transportation | FL | Mar 23, 2026 | $1,163,418 |
| 6973GH23F01726 IIJA FUNDS: CHANGE ORDER FOR THE REMOB-DEMOB DUE TO THE CUTOVER DELAY, AND A CREDIT BACK FOR THE VINYLE FLOORING AT RALEIGH, NC (RDUC) ATCT JCN:1400778 | Department of Transportation | NC | May 27, 2026 | $794,564 |
| 6973GH22D00016 THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO INCORPORATE A NEW CLAUSE. | Department of Transportation | — | Jul 21, 2026 | — |
| 6973GH26F01098 IIJA FUNDS. 2025 PROPANE BASELINE INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS AT FRESNO, CA (FATA) ATCT JCN:1501845 | Department of Transportation | CA | Jul 20, 2026 | $125,091 |
| 6973GH26F01107 EG FUNDED. SITE SURVEY TRAVEL, REPORT AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE AT NASHVILLE, TN (BNAE) ATCT JCN:235969 | Department of Transportation | TN | Jul 20, 2026 | $34,983 |
| 697DCK26C00144 TOWER SIMULATOR SYSTEM (TSS) STANDALONE SIMULATION SYSTEM | Department of Transportation | GA | Jun 25, 2026 | $5,100,000 |
| 6973GH23F01656 FST CHANGE ORDER TO ADD THE INSTALL FUNDING 2025 OUTDOOR EG BASELINE SCOPE: CONDUCT INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT MEMPHIS, TN (MEMA) ASR JCN: 23000546 | Department of Transportation | TN | Jun 25, 2026 | $389,311 |
| 6973GH24F00941 IIJA FUNDS. SITE-SPECIFIC REQUIREMENTS,INCLUDING REMOVAL OF 1,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM AND CONCRETE FST PAD; AND INSTALLATION OF 1,000-GALLON AST, ABOVEGROUND SUPPLY AND RETURN F | Department of Transportation | SC | Jun 25, 2026 | $259,946 |
| 6973GH25F01306 DE-OBLIDATION DUE TO THE BUDGETARY CONSTRAINTS, FUNDS TO PAY FOR ACTIVE PROJECTS AT AGANA, GU (GUMC) RTR JCN:22002410 | Department of Transportation | GU | Jun 9, 2026 | $0 |
| 6973GH22F01658 BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR MEMPHIS, TN (MEME) RCAG JCN:22002706 | Department of Transportation | TN | May 14, 2026 | $5,500 |
| 6973GH26F00723 (IIJA) FUNDED DESIGN AND MODERNIZATION INSTALL PROJECT(S) MULTIPLE SITES: (MXF)ASR, MAXWELL AFB, AL, JCN:23000763; (ATL)ASR, ATLANTA, GA, JCN:23000713; (LZU)ASR, BUFORD, GA, JCN:23000757, PER LPGBS | Department of Transportation | AL | Apr 29, 2026 | $436,474 |
| 6973GH24F01234 IIJA FUNDS, CHANGE ORDER DUE TO CHANGE IN SCOPE FROM AN OUTDOOR EG TO A DIESEL STANDALONE, INCLUDING PROJECT MANAGEMENT REQUIREMENTS, GPR SURVEY, CONCRETE SAMPLING AND TEST REPORT, AND ELECTRICAL DIAGRAM AT NEWARK, NJ (EZA) ALS, JCN: 1503146 | Department of Transportation | NJ | Apr 27, 2026 | $359,552 |
| 6973GH24F01393 SITE-SPECIFIC REQUIREMENTS INCLUDING REMOVAL OF 500-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, AND CONCRETE FST PAD; AND INSTALLATION OF 250-GALLON AST, ABOVEGROUND SUPPLY AND RETURN FUEL LINES TO TH | Department of Transportation | MI | Apr 22, 2026 | $288,172 |
| 6973GH22F01733 IIJA FUNDS. CHANGE ORDER TO ADD ADDITIONAL DESIGN FUNDES FOR EG AT ERIE, PA (ERI) ASR JCN:22001753 | Department of Transportation | PA | Mar 23, 2026 | $511,035 |
| 6973GH26F00594 IIJA AND F&E FUNDED MODERNIZATION INSTALLATION PROJECT(S) AT MULTIPLE LOCATIONS IN SANFORD, FL (LOCAL IMPLEMENTATION) SANFORD, FL (FNU)GS 26000718, (FNU)LOC 26002138, (FNU)MALSR 26000717, (OOS)GS 26000719, (OOS)LOC 26000527, (OOS)MALSR 2600072 | Department of Transportation | FL | Apr 2, 2026 | $209,009 |
| 6973GH23F01470 UPS DESIGN PROPOSAL. JCN:18061611, LOC:ERI ASR, ERIE PA. THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ALLOCATE ADDITIONAL DESIGN FUNDS FOR UPS. | Department of Transportation | PA | Mar 23, 2026 | $25,654 |
| 6973GH23F00160 IIJA FUNDS. SITE-SPECIFIC REQUIREMENTS, INCLUDING REMOVAL OF THE EXISTING 350KW INDOOR EG, LOAD BANK, 50-GALLON DAY TANK, 2000-GALLON FST AND ERMS SYSTEM; AND INSTALLATION OF A NEW OUTDOOR 400KW AND CONCRETE SUPPORT PAD, ERMS AND FULL ARC FLASH INSTA | Department of Transportation | FL | Mar 11, 2026 | $626,780 |
| 6973GH22F01665 DE-OBLIGATING FUNDS DUE TO NDP TAKING OVER THE PROJECT SINCE UPGRADING THE EQUIPMENT AND STARTING PROJECT OVER AT OCEANA, VA (QVR) ARSR JCN:22006702 | Department of Transportation | VA | Mar 11, 2026 | $45,040 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier C4DSLZNYMPV3, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.