Contractor
THORNTON TOMASETTI, INC.
- UEI
- DRAGFFDYMT53
- Resolved by
- uei
- Confidence
- 1.000
Active from Feb 27, 2017 to Sep 29, 2026.
Sign in to watchRecent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| DTFR5317C00002 IGF::OT::IGF THE MAIN OBJECTIVE OF THIS PROPOSED EFFORT IS TO DEVELOP A METHOD FOR INCREASING THE RELIABILITY OF ULTRASONIC INSPECTIONS OF RAIL HEADS THROUGH THE USE OF PA ULTRASONIC SYSTEMS AND NOVEL FLAW CHARACTERIZATION ALGORITHMS. IN ORDER TO FULLY UNDERSTAND AND OPTIMIZE THE RAIL HEAD FLAW AND INSPECTION DATA RELATIONSHIP, WE PROPOSE TO FORMULATE VIRTUAL INSPECTIONS USING OUR PROPRIETARY SOFTWARE PZFLEX, A FINITE ELEMENT ANALYSIS SOFTWARE SPECIALIZED FOR TRANSDUCER DESIGN AND SIMULATING WAVE PROPAGATION IN STRUCTURES. AUTOMATED PREDICTIVE ANALYSIS OPERATING ON A LIBRARY OF SIMULATED PA INSPECTION DATA WILL BE IMPLEMENTED TO CHARACTERIZE FLAWS. | Department of Transportation | NY | Feb 27, 2017 | $149,550 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier DRAGFFDYMT53, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Oct 21, 2026.