Active from Mar 3, 2026 to Jun 26, 2026.
What they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Roofing | 1 | $13,265,970 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 80KSC021F0019 REPLACE THE ROOF AND ROOFTOP HVAC EQUIPMENT ON TWO SEPARATE BUILDINGS WITHIN THE BOOSTER FABRICATION FACILITY (BFF) THE ENGINEERING AND ADMINISTRATION (E&A) BUILDING (E&A) AND THE MANUFACTURING BUILDING AT THE KENNEDY SPACE CENTER, FL. | National Aeronautics and Space Administration | FL | Jun 26, 2026 | $13,265,970 |
| 80SSC018D0020 THIS REGIONALIZED MULTIPLE AWARD CONSTRUCTION CONTRACT TWO (MACC-II) SHALL RESULT IN THE AWARD OF A MAXIMUM OF TWENTY-FOUR (24) INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) IN SUPPORT MACC-II. THE MACC-II PROVIDES A CRITICAL IN-PLACE CONTRACTUAL MECHANISM THROUGH A REGIONALIZED MULTIPLE AWARD, INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO SUPPORT GENERAL CONSTRUCTION, ALTERATION, MODIFICATION, MAINTENANCE AND REPAIR, DEMOLITION, DESIGN-BUILD, AND NEW CONSTRUCTION OF BUILDINGS, FACILITIES, AND REAL PROPERTY AT JOHN C. STENNIS SPACE CENTER (SSC), JOHNSON SPACE CENTER (JSC) INCLUDING WHITE SANDS TEST FACILITY (WSTF), KENNEDY SPACE CENTER (KSC), AND MARSHALL SPACE FLIGHT CENTER (MSFC) INCLUDING MICHOUD ASSEMBLY FACILITY (MAF). MACC-II WILL ALSO SUPPORT EMERGENCY RESPONSE TO NATURAL DISASTERS AND EMERGENCIES. OTHER NASA CENTERS AND FEDERAL TENANTS AT NASA FACILITIES MAY UTILIZE MACC-II WITH SSC PROCUREMENT OFFICER APPROVAL. THE MACC-II IS NOT A REQUIREMENTS CONTRACT AND THEREFORE NOT MANDATORY. THE MACC-II IS INTENDED TO PROVIDE A HIGHLY FLEXIBLE CONSTRUCTION CONTRACTING VEHICLE FOR PARTICIPATING CENTERS. THIS SOLICITATION INCLUDES 4 SEED PROJECTS, ONE FOR EACH OF THE 4 CENTERS. DETAILS ARE FOUND IN THE INITIAL (MODEL) TASK ORDERS LISTED IN SECTION J OF THIS SOLICITATION AND REFERENCED IN SECTION B SCHEDULE: THE CONTRACTOR SHALL PROVIDE ALL LABOR, TOOLS, EQUIPMENT AND MATERIALS TO PERFORM EACH TASK AS DEFINED IN THE SPECIFICATIONS AND DRAWINGS IDENTIFIED FOR THE SPECIFIC INITIAL (MODEL) TASK ORDER. SEE SECTION J. AND REFERENCE BID ITEM 0002-0005. | National Aeronautics and Space Administration | — | Jun 2, 2026 | — |
| W912DY23F0314 A00003 - TIME EXTENSION REQUEST. COMPENSATES THE CONTRACTOR IN FULL FOR THE WORK AND TIME EXTENSION AS OUTLINED IN THE CONTRACTOR FINAL PROPOSAL DATED 9 MARCH 2026 AND RESPONSES TO CLARIFICATION DATED 1 APRIL 2026. | Department of Defense | AK | Apr 13, 2026 | $8,701,422 |
| W912QR23F0438 WEATHER TIME EXT. JAN 25 - DEC 25 | Department of Defense | VA | Mar 12, 2026 | $14,188,669 |
| W9127S25FA062 THE INTENT OF THIS PROJECT IS TO REPAIR/REPLACE ROOF ON BUILDING 1380 AND ROOF REPLACEMENT AND BUILDING ENVELOPE REPAIR ON BUILDING 1371 DENTAL CLINIC. | Department of Defense | FL | Mar 11, 2026 | $1,771,243 |
| FA446022F0028 THIS ACQUISITION IS A CONSTRUCTION PROJECT FOR THE DESIGN AND CONSTRUCTION FOR CONVERT MISSION PLANNING CELL B380 OUTLINED IN PROJECT NO. NKAK 20-3000. | Department of Defense | AR | Mar 3, 2026 | $7,336,601 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier C1CCESCMJUY1, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.