Contractor
SENTINEL POWER SERVICES, LLC
- UEI
- VZH2RXQG6QD5
- Parent UEI
- VZH2RXQG6QD5
- Resolved by
- uei
- Confidence
- 1.000
Active from Mar 2, 2026 to Jul 24, 2026.
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 6973GH24F00893 CHANGE ORDER TO ADD THE CAMLOCKS, DISCONNECTS, ATS AND LOAD BANK SHIPPING REQUIREMNTS AT MIDDLETON IS, AK (MDO) PX JCN: 18027172 | Department of Transportation | AK | May 12, 2026 | $12,216,935 |
| 6973GH20F01676 FABRICATE TEMP SYSTEM SWITCHGEAR TRAILERS FOR TS3,TS4, AND TS5 TO SUPPORT ACEPS II, PHASE 2 INSTALLATIONS | Department of Transportation | OK | Jul 21, 2026 | $3,003,222 |
| 6973GH22D00015 THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO INCORPORATE A NEW CLAUSE. | Department of Transportation | — | Jul 21, 2026 | — |
| 6973GH23F01601 F35 FUNDING DESIGN FOR SBA ATCT CPDS JCN 1505009 | Department of Transportation | AZ | Mar 2, 2026 | $105,325 |
| 6973GH22F01728 IIJA FUNDS. SITE-SPECIFIC PRICING TO REMOVE THE EXISTING 175KW EG AT THE AND ALL ITS ASSOCIATED PARTS AND REPLACE WITH A 200KW EG 277/480V, 3PH IAW THE APPROVED DRAWINGS DATED 9/12/2025 AND THE 2023 125KW EG OUTDOOR BASELINE, ERMS, A FULL POWER SYST | Department of Transportation | CA | Jun 16, 2026 | $602,941 |
| 6973GH26F00829 SITE SURVEY TRAVEL TO SAN JUAN PR (SJU), COVINGTON KY (CVG) ATCT, MIAMI, FL (MIA) ATCT/TRACON AND LOUISVILLE, KY (SDF) ATCT/TRACON | Department of Transportation | KY | May 14, 2026 | $9,537 |
| 6973GH26F00767 SITE SURVEY TRAVEL, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECTS AT UNALAKLEET, AK (UNKA) ASTI JCN:18032213 | Department of Transportation | AK | May 6, 2026 | $45,106 |
| 6973GH23F00726 IIJA FUNDS. SITE-SPECIFIC REQUIREMENTS INCLUDES THE REMOVAL OF 2,000-GALLON AST, UNDERGROUND SUPPLY AND RETURN FUEL LINES TO THE DAY TANK, FUEL MONITORING SYSTEM, AND CONCRETE FST PAD; AND INSTALLATION OF 2,000-GALLON AST, ABOVEGROUND SUPPLY AND RETU | Department of Transportation | NY | May 6, 2026 | $403,324 |
| 0017 CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) INSTALLATION AT LAX | Department of Transportation | CA | Mar 30, 2026 | $5,630,749 |
| 6973GH24F01225 DE-OBLIGATING PER THE FST PMO DUE TO THE NEW RCLR GUIDANCE AT SAN LUIS, CO (QUJ) RCLR JCN: 2200057 | Department of Transportation | CO | Mar 17, 2026 | $13,142 |
| 6973GH23F00724 IIJA FUNDS. SITE-SPECIFIC REQUIREMENTS, INCLUDING REMOVAL OF THE EXISTING 1,000-GAL AST, ABOVEGROUND FUEL OIL SUPPLY AND RETURN PIPING, LOAD BANK AND PAD, INTERIOR 135KW ENGINE GENERATOR, VEEDER ROOT, (7) BOLLARDS, AND CONCRETE PAD; AND INSTALLATION | Department of Transportation | MO | Mar 17, 2026 | $563,159 |
| 6973GH23F00725 IIJA FUNDS. FST SITE-SPECIFIC INCLUDES THE REMOVAL OF THE EXISTING 2,000-GAL AST, ABOVEGROUND FUEL OIL SUPPLY AND RETURN PIPING, INTERIOR 200KW ENGINE GENERATOR, VEEDER ROOT, AND CONCRETE PAD; AND INSTALLATION OF A NEW 200KW EG SUB-BASED DIESEL TANK, | Department of Transportation | MO | Mar 11, 2026 | $705,602 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier VZH2RXQG6QD5, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.