Contractor
SANDHILLS UTILITY SERVICES, LLC
- UEI
- SE64EGT757K9
- Parent UEI
- SE64EGT757K9
- Resolved by
- uei
- Confidence
- 1.000
Active from Mar 2, 2026 to May 6, 2026.
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| W9124725FA113 INSTALL TRANSFORMER FOR CDC ON RHINE ROAD | Department of Defense | NC | May 6, 2026 | $223,606 |
| W912QR26CA020 CAMP MACKALL MICROGRID | Department of Defense | NC | Mar 20, 2026 | $15,925,307 |
| W9124726FA021 RFA 1969-25 FOR PROJECT FB-00009-21. | Department of Defense | NC | Apr 23, 2026 | $32,756 |
| W9124726FA009 TO PROVIDE A TASK ORDER FOR THE FUNDING ANNUAL ELECTRICAL SERVICE FUNDING. | Department of Defense | NC | Mar 4, 2026 | $15,348,603 |
| W9124726FA070 RFA 1977-26 FB-42023-25 REPLACE FAILED CHILLER | Department of Defense | NC | Apr 21, 2026 | $12,844 |
| W9124722FAC35 SANDHILLS UTILITY SERVICES, LLC STATEMENT OF WORKFOR GOVERNMENT PROJECT FA70674-22MONITOR UNMANNED REMOTER SITESAUGUST 17, 20221. SYNOPSISPROVIDE ALL NECESSARY LABOR, MATERIAL, AND EQUIPMENT TO MONITOR 65 GENERATOR SETSREMOTELY VIA REMOTE MONIT | Department of Defense | NC | Apr 16, 2026 | $707,005 |
| W9124722FAC34 THE PURPOSE OF THIS MODIFICATION IS TO: 1.) EXTEND THE PERIOD OF PERFORMANCE TO 30 SEPTEMBER 2025.ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. | Department of Defense | NC | Apr 13, 2026 | $1,859,034 |
| W9124723F2043 SANDHILLS UTILITY SERVICES, LLC STATEMENT OF WORKFOR GOVERNMENT PROJECT FA-70567-20JUNE 23, 20231. SYNOPSISPROVIDE ALL NECESSARY DESIGN, ENGINEERING, EQUIPMENT, LABOR AND MATERIAL FOR THEINSTALLATION OF NEW RUNWAY LIGHTING STRUCTURES. AFTER THE | Department of Defense | NC | Apr 8, 2026 | $1,879,331 |
| W9124724F0392 FA-70739-24, GRID VULNERABILITY STUDY SCOPE OF WORK THE SCOPE OF THIS PROJECT IS TO CONDUCT A COMPREHENSIVE ASSESSMENT OF GRID VULNERABILITIES WITHIN THE SANDHILLS UTILITY SERVICE ELECTRICAL DISTRIBUTION SYSTEM. THIS ASSESSMENT WILL ENCOMPASS VULNER | Department of Defense | NC | Mar 27, 2026 | $194,712 |
| W9124722F0101 SANDHILLS UTILITY SERVICES, LLC STATEMENT OF WORK FOR GOVERNMENT PROJECT FA70598-211. SYNOPSISPROVIDE ALL NECESSARY DESIGN, ENGINEERING, EQUIPMENT, LABOR AND MATERIAL TO INSTALL 2 INTELLIRUPTERS AT CAMP MACKALL TO ACT AS SMART SWITCHES FOR AN AIR | Department of Defense | NC | Mar 27, 2026 | $558,901 |
| W9124725F0051 SANDHILLS UTILITY SERVICES, LLC 1. SYNOPSISSTATEMENT OF WORKFOR GOVERNMENT PROJECT PN96182DECEMBER 4, 2024PROVIDE ALL NECESSARY DESIGN, ENGINEERING, EQUIPMENT, LABOR, AND MATERIAL FOR INSTALL OF TRANSFORMER FOR NEWLY REPAIRED FACILITY. AFTER THE | Department of Defense | NC | Mar 20, 2026 | $2,039,512 |
| W9124724F0078 PROPRIETARY AND CONFIDENTIAL SANDHILLS UTILITY SERVICES, LLCSTATEMENT OF WORKFOR GOVERNMENT PROJECT PT00014-2120 FEBRUARY 20241. SYNOPSISPROVIDE ALL NECESSARY DESIGN, ENGINEERING, EQUIPMENT, LABOR AND MATERIAL TO SUPPLYCONSTANT UTILITY SUPPOR | Department of Defense | NC | Mar 19, 2026 | $218,929 |
| W9124724F0381 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO UNTIL 31 AUGUST 2026. | Department of Defense | NC | Mar 18, 2026 | $390,365 |
| W9124726FA042 PROVIDE ALL NECESSARY DESIGN, ENGINEERING, EQUIPMENT, LABOR, AND MATERIALS FOR THE INSTALLATION OF A NEW TRANSFORMER AND SERVICE TO FEED LIBERTY TRAIL. | Department of Defense | NC | Mar 2, 2026 | $50,033 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier SE64EGT757K9, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.