Contractor
PARAGON SPACE DEVELOPMENT CORPORATION
- UEI
- RMK3ANU9RLC7
- Parent UEI
- RMK3ANU9RLC7
- Resolved by
- uei
- Confidence
- 1.000
Active from Jun 28, 2016 to Sep 18, 2026.
Sign in to watchRecent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 80NSSC26C0145 SBIR PHASE II MULTISTAGE UMBILICAL DISCONNECT (MUD) SYSTEM | National Aeronautics and Space Administration | AZ | Sep 18, 2026 | $1,274,833 |
| NNH16CL01C IGF::OT::IGF RECOVERY OF POTABLE WATER FROM WASTEWATER IS ESSENTIAL TO THE SUCCESS OF LONG-DURATION HUMAN SPACEFLIGHT. FOR HUMAN MISSIONS TO MARS, THE TECHNOLOGY MATURATION (TA 207) OBJECTIVE IS TO RECOVER GREATER THAN 98 PERCENT OF THE WATER FROM WASTEWATER SOURCES (URINE, HUMIDITY CONDENSATE, ETC.). THIS CONTRACT IS FOR THE DEVELOPMENT OF IONOMER-MEMBRANE WATER PROCESSOR (IWP) BRINE PROCESSOR FOR FLIGHT DEMONSTRATION ON THE INTERNATIONAL SPACE STATION (ISS). REQUIREMENTS FOR THE BRINE PROCESSOR WILL BE BASELINED BY NASA AND AGREED TO BY THE CONTRACTOR UNDER THE PHASE III SBIR NNX16CJ02C. AN ISS FLIGHT DEMONSTRATION IS NEEDED TO VALIDATE AND FULLY CHARACTERIZE BRINE PROCESSOR SYSTEM PERFORMANCE IN A RELEVANT ENVIRONMENT FOR FUTURE EXPLORATION MISSIONS. THE RELEVANT ENVIRONMENT IN THIS CASE INCLUDES BOTH MICRO-GRAVITY AND LONG-DURATION EXPOSURE TO MICRO-G CREW-PRODUCED BRINE VIA THE URINE PROCESSOR. THE BRINE PROCESSOR WILL BE FLOWN AS A CLASS 1E PIECE OF HARDWARE. TASKS INCLUDE 1) COMPLETE TECHNOLOGY MATURATION OF KEY COMPONENT SUBSYSTEMS OF THE IWP FROM THE PHASE III SBIR INCLUDING BLADDER HEAT SEALING, LOW-PROFILE SIDE-MOUNTED FILL PORT, DETRUSOR AND SYSTEM COMPATIBILITY WITH INADVERTENT EXPOSURE TO 14.7 PSIG DURING BRINE FILL; 2) SYSTEM DESIGN CYCLE INCLUDING HEATER AND ENERGY MANAGEMENT TRADE; 3) INTEGRATED SYSTEM AND COMPONENT PRELIMINARY DESIGN; 4) INTEGRATED SYSTEM AND COMPONENT FINAL DESIGN AND REVIEW; 5) MANUFACTURING OF ONE COMPLETE IWP ASSEMBLY, 42 BLADDERS (18 FOR QUALIFICATION TESTING AND 24 FOR FLIGHT), ONE NON-OPERATING TRAINING UNIT WITH SPARES; 6) PROTOFLIGHT QUALIFICATION TESTING AND BLADDER ACCEPTANCE TESTING; 7) HARDWARE ACCEPTANCE REVIEW AND DELIVERY OF A BRINE PROCESSOR AND ASSOCIATED CONSUMABLES, FOR AN ISS TECHNOLOGY DEMONSTRATION; 8) POST-DELIVERY AND ON-ORBIT SUPPORT WHICH INCLUDES GENERATION OF OPERATIONS AND MAINTENANCE HANDBOOK FOR USE BY NASA IN SUPPORT OF CREW TRAINING AND THE DEVELOPMENT OF ON-ORBIT OPERATIONS AND MAINTENANCE, CREW TRAINING SUPPORT, AND ON-ORBIT OPERATIONS SUPPORT AND SUPPORT WITH NASA ON-ORBIT ANOMALY RESOLUTION AND GENERATION OF AN ON-ORBIT TEST REPORT WITH LESSONS LEARNED AND RECOMMENDATIONS FOR IMPROVEMENTS. | National Aeronautics and Space Administration | AZ | Jun 28, 2016 | $14,058,999 |
| 80NSSC24CA061 FY24 SBIR PHASE II - SOFTGOODS WEBBING INTEGRATED STRAIN SENSOR FOR INFLATABLE | National Aeronautics and Space Administration | AZ | Apr 14, 2026 | $849,795 |
| 80JSC026D0006 BRINE PROCESSOR ASSEMBLY | National Aeronautics and Space Administration | — | Apr 15, 2026 | — |
| 80NSSC26P0630 DEVELOPMENT OF THE XEMU LCVG THERMAL CONTROL LOOP | National Aeronautics and Space Administration | AZ | May 12, 2026 | $104,934 |
| 80JSC026F0040 THE PURPOSE OF THIS TASK ORDER IS TO ORDER CLIN 0001 AND 0002 SERVICES AND SUPPLIES FOR FISCAL YEAR (FY) 26. SEE PARENT CONTRACT IN BLOCK 2 FOR SCHEDULE AND DESCRIPTION OF SERVICES AND SUPPLIES. | National Aeronautics and Space Administration | AZ | Apr 30, 2026 | $197,871 |
| 80NSSC25C0295 PHASE I SBIR - MULTISTAGE UMBILICAL DISCONNECT (MUD) SYSTEM | National Aeronautics and Space Administration | AZ | Apr 21, 2026 | $149,915 |
| 80JSC025F7050 THE BUILD, TEST, AND DELIVERY OF 60 BPA BLADDERS. | National Aeronautics and Space Administration | AZ | Apr 2, 2026 | $1,834,655 |
| 80NSSC24CA023 STTR PHASE II - SPACESUIT COVER AGAINST THE ABRASIVE LUNAR ENVIRONMENT (SCALE) & EXPLORATION TEXTILE FOR HIGH OXYGEN ENVIRONMENTS | National Aeronautics and Space Administration | AZ | Mar 10, 2026 | $849,999 |
| 80JSC021D0007 EXERCISE THE OPTION TO EXTEND SERVICES OF THIS CONTRACT BY 43 DAYS. | National Aeronautics and Space Administration | — | Mar 18, 2026 | — |
| 80JSC025F7068 EXTEND THE CONTRACT PERIOD OF PERFORMANCE INCREASE THE TOTAL CONTRACT VALUE AND FUNDING FOR THIS TASK ORDER FROM $159,735.02 TO $200,619.58 | National Aeronautics and Space Administration | AZ | Mar 18, 2026 | $200,620 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier RMK3ANU9RLC7, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Sep 24, 2026.