Contractor
LOCKHEED MARTIN CORPORATION
- UEI
- H7PNSVNN5827
- Parent UEI
- ZFN2JJXBLZT3
- Resolved by
- uei
- Confidence
- 1.000
Active from Dec 1, 1992 to Jul 21, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Engineering Services | 18 | $179,677,699 |
| Equipment Maintenance and Repair | 7 | $31,813,214 |
| Program Management Support | 5 | $2,982,587 |
| Logistics Support | 2 | $720,430,305 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 140D0423C0085 SPACE POWER CONVERSION ELECTRONICS (SPCE) USING GALLIUM NITRIDE FIELD-EFFECT TRANSISTORS & ULTRA-HIGH-DENSITY POINT OF LOAD CONVERTORS FOR SMALLER-SIZES AND RADIATION-TOLERANCE (GHOST) | Department of the Interior | FL | Apr 2, 2026 | $17,310,955 |
| FA868118C0021 ARRW DEVELOPMENT | Department of Defense | FL | Aug 13, 2018 | $1,362,972,313 |
| FA868223FB015 JOINT AIR TO SURFACE STANDOFF MISSILE (JASSM)OPERATIONAL PLANNING (OP) 2023 | Department of Defense | FL | Jun 22, 2023 | $50,848,666 |
| W31P4Q23C0035 AIR-TO-GOUND MISSILE SYSTEMS (AGMS) ENGINEERING SERVICES. | Department of Defense | FL | Aug 1, 2023 | $44,566,307 |
| W56HZV24F0105 MINIMUM GUARANTEE DELIVERY ORDER | Department of Defense | FL | Dec 22, 2023 | $44,442,408 |
| FA868224FB001 JOINT AIR TO SURFACE STANDOFF MISSILE (JASSM) | Department of Defense | FL | Oct 17, 2023 | $17,119,525 |
| FA854026FB004 SNIPER CLS- SUSTAINMENT ORDER 4 | Department of Defense | GA | Dec 10, 2025 | $36,229,099 |
| N0016420FJ268 NRE&TEST ARTICLES | Department of Defense | FL | Sep 29, 2020 | $22,143,970 |
| W52P1J19F0077 IGF::OT::IGF | Department of Defense | FL | Dec 14, 2018 | $15,662,231 |
| W56HZV24D0016 TWO-YEAR HYBRID FIRM-FIXED-PRICE (FFP)/COST PLUS FIXED FEE (CPFF) INDEFINITE-DELIVERY INDEFINITE-QUANTITY (IDIQ) FOR VBK. | Department of Defense | — | Dec 22, 2023 | — |
| FA868224FB007 OBSOLESCENCE/ DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) PROGRAM ON THE AGM-158 WEAPON SYSTEM THROUGHOUT ITS PROGRAM LIFE CYCLE. | Department of Defense | FL | May 1, 2024 | $20,989,825 |
| FA868225FB007 THE CONTRACTOR SHALL DEVELOP AND MODIFY CURRENT SOFTWARE TO ALLOW THE JASSM SYSTEM TO EXECUTE NEW CAPABILITIES AND INTEGRATE ON PLATFORMS IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES DATED 02 OCTOBER 2024. | Department of Defense | FL | Mar 5, 2026 | $58,909,789 |
| W58RGZ22F0127 CONTRACT FIELD SERVICE REPRESENTATIVE FOR APACHE AH 64 D/E. | Department of Defense | FL | Dec 20, 2021 | $5,406,400 |
| SPRRA226F0081 DO FOR SERVICES ON NAVY FLIGHT TEST SUPPORT. | Department of Defense | FL | May 5, 2026 | $256,846 |
| W31P4Q23C0005 AIR-TO-GROUND MISSILE SYSTEM (AGMS) PRODUCTION | Department of Defense | FL | Mar 13, 2026 | $1,360,065,230 |
| W912CH25PA004 THIS PROJECT AIMS TO DEMONSTRATE THE EFFECTIVENESS OF COUNTER UNMANNED AERIAL SYSTEMS (CUAS) TECHNOLOGIES IN PASSIVE DETECTING THEN DEFEATING UNMANNED AERIAL SYSTEMS (UAS). | Department of Defense | FL | Mar 4, 2026 | $2,128,265 |
| N0038324FA502 BORESIGHTING EQUIPM | Department of Defense | FL | Aug 29, 2024 | $2,600,000 |
| FA868220F1005 JOINT AIR-TO-SURFACE STANDOFF MISSILE ES3.0 | Department of Defense | FL | Nov 7, 2019 | $19,908,443 |
| FA854025FB012 THIS REQUEST IS TO ESTABLISH A REPAIR AND RETURN REQUIREMENT FOR THE PAKISTAN AIR FORCE SNIPER ATP PROGRAM SUSTAINMENT EFFORT. FMS REQUIREMENT ROUTINE FMS/COUNTRY/CASE: PK-D-QAP | Department of Defense | FL | Mar 18, 2026 | $1,098,297 |
| FA854026FB024 FMS SNIPER ATP, IRST, LANTIRN SUSTAINMENT IDIQ CONTRACTS | Department of Defense | FL | Apr 30, 2026 | $220,320 |
| FA868225FB006 ENG SUPPORT 8.0 | Department of Defense | FL | Mar 16, 2026 | $18,023,923 |
| W912CH25F0174 ESTABLISH AND FUND A CPFF FOR VBK SUPPORT SERVICES PREPARATION ORDERING PERIOD 2 LABOR | Department of Defense | FL | Feb 13, 2025 | $3,800,827 |
| FA868224FB004 JASSM FAILURE REVIEW BOARD (FRB) | Department of Defense | FL | Mar 12, 2026 | $4,411,597 |
| FA854026FB026 FMS SNIPER ATP, IRST, LANTIRN SUSTAINMENT IDIQ CONTRACTS | Department of Defense | FL | Apr 30, 2026 | $322,959 |
| FA868223FB012 THE PURPOSE OF THIS EFFORT IS TO MITIGATE OBSOLESCENCE RISKS OF THE CURRENT PARKER ACTUATOR CONTROL UNIT (ACU) CIRCUIT CARD ASSEMBLY (CCA) AND THE CURRENT FOCAL PLANE ARRAY (FPA) CCA. | Department of Defense | FL | Apr 30, 2026 | $4,247,860 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier H7PNSVNN5827, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Oct 21, 2026.