Contractor
KEKOLU-RIO VISTA JOINT VENTURE, LLC
- UEI
- PEX3GRV7EEJ3
- Parent UEI
- PEX3GRV7EEJ3
- Resolved by
- uei
- Confidence
- 1.000
Active from Jun 12, 2024 to May 6, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Commercial Building Construction | 5 | $3,366,213 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| W519TC26FA281 TEAD - RAIL MAINTENANCE | Department of Defense | UT | May 6, 2026 | $283,961 |
| FA820124F0137 PROVIDE HILL AFB WITH A STREAMLINED AVENUE TO EXECUTE SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER), WHICH INCLUDE SERVICES SUCH AS DEMOLITION, PLUMBING, ELECTRICAL, MECHANICAL, REPAIRS, MAINTENANCE, LANDSCAPING, CONCRETE, ETC. | Department of Defense | UT | Jun 12, 2024 | $243,132 |
| W519TC26FA264 ROAD PROJECT B-1233 PAVEMENT | Department of Defense | UT | Apr 16, 2026 | $191,698 |
| FA820126F0142 BLDG. 503 CONSTRUCT EQUIPMENT ISOLATION ENCLOSURE | Department of Defense | UT | Apr 14, 2026 | $1,914,622 |
| FA820126F0137 BLDG 590 RENOVATE 2ND FLOOR | Department of Defense | UT | Apr 9, 2026 | $882,744 |
| W519TC25F2265 EXTENDING THE END DATE FOR PRIVATELY-OWNED VEHICLE ACCESS CONTROL PROJECT FROM 30 SEPTEMBER 2025 TO 31 MARCH 2026. | Department of Defense | UT | Apr 6, 2026 | $124,063 |
| FA820126F0028 PROVIDE HILL AFB WITH A STREAMLINED AVENUE TO EXECUTE SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER), WHICH INCLUDE SERVICES SUCH AS DEMOLITION, PLUMBING, ELECTRICAL, MECHANICAL, REPAIRS, MAINTENANCE, LANDSCAPING, CONCRETE, ETC. | Department of Defense | UT | Jan 6, 2026 | $307,649 |
| W519TC25FA245 THIS DOCUMENT CONSTITUTES TASK ORDER W519TC-25-F-IGRO TO REPAIR THE AREA 10 IGLOO ROADWAYS. ALL WORK SHALL BE EXECUTED IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE BASIC CONTRACT AND THE SCOPE OF WORK, FOR PERFORMANCE AT TOOELE ARMY DEPOT. | Department of Defense | UT | Sep 19, 2025 | $4,560,000 |
| FA820126F0006 PROVIDE HILL AFB WITH A STREAMLINED AVENUE TO EXECUTE SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER), WHICH INCLUDE SERVICES SUCH AS DEMOLITION, PLUMBING, ELECTRICAL, MECHANICAL, REPAIRS, MAINTENANCE, LANDSCAPING, CONCRETE, ETC. | Department of Defense | UT | Nov 17, 2025 | $134,769 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier PEX3GRV7EEJ3, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Oct 21, 2026.