Skip to content
BidBenchmark

Contractor

E CORP

LAYTON, UT
UEI
CWVJEB454CR7
Parent UEI
CWVJEB454CR7
Resolved by
uei
Confidence
1.000
Obligated to date
$61,836,0401
Awards
16
Agencies served
2

Active from Mar 16, 2026 to Jul 20, 2026.

What they win

Benchmark categories this contractor appears in, by award count.

CategoryAwardsObligated
Commercial Building Construction2$0

Recent awards

AwardAgencyPlaceFirst actionCurrent value
697DCK23G00027

REVISE SECTION H AND REMOVE CLAUSES THAT ARE NO LONGER APPLICABLE

Department of TransportationJul 20, 2026
697DCK25F00685

SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED SURFACE PARKING LOTS AND REPAIR CONCRETE AND GRASS AREAS. THE PROJEC

Department of TransportationUTMar 27, 2026$4,784,804
6973GH26C00043

TPS-027 REPLACE SWITCHGEAR MCC

Department of TransportationOKJul 10, 2026$5,246,537
697DCK24F00705

MECHANICAL-ELECTRICAL MODERNIZATION AT MSP ATCT (MINNEAPOLIS, MN)

Department of TransportationMNApr 17, 2026$10,674,902
140P1325C0001

ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL & CAVE EXPERIENCE - REA & TIME EXTENSION

Department of the InteriorNMMay 6, 2026$3,754,785
697DCK23G00016

ADD INTERIM CLAUSES

Department of TransportationJul 2, 2026
697DCK23G00022

ADD INTERIM CLAUSES

Department of TransportationJun 26, 2026
140P1426C0005

GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711

Department of the InteriorWYJun 26, 2026$8,298,013
697DCK24F00462

LCH ATCT ELECTRICAL UPGRADE - SHUTDOWN REA SETTLEMENT

Department of TransportationLAApr 3, 2026$1,936,005
697DCK23G00009

ADD INTERIM CLAUSES

Department of TransportationJun 22, 2026
697DCK24F01123

DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.

Department of TransportationUTApr 23, 2026$10,660,945
697DCK24F00444

ADD FUNDING FOR REA AND ADD INTERIM CLAUSES

Department of TransportationCAJun 15, 2026$1,892,432
697DCK26F00195

ESTABLISH CONSTRUCTION CONTRACT FOR THE REPLACEMENT OF THE HVAC SYSTEM AT THE BURLINGTON, VT AIRPORT TRAFFIC CONTROL TOWER IN SOUTH BURLINGTON, VT. REPLACE HVAC SYSTEM AT BTV ATCT AND BASE BUILDING. "IN ACCORDANCE WITH EO 14222 "IMPLEMENTIN

Department of TransportationVTMar 16, 2026$3,070,439
697DCK24F00016

MOD P00005 TO ADD FUND FOR IMPACT STATEMENT NO. 3 EXPANSION TANKS. AHU-700 COOLING COOL CHANGE IN SCOPE

Department of TransportationCAMay 21, 2026$6,570,738
697DCK26F00387

CHILLER REPLACEMENT AT DTW ATCT (DETROIT, MI): 1.) REPLACE HVAC COMPONENTS ASSOCIATED WITH THE CHILLER REPLACEMENT, INCLUDING THE FOUNDATIONS, AS SHOWN ON THE DRAWINGS AND OTHER COMPONENTS SHOWN ON THE DRAWINGS. 2.) REPLACE FACILITY BUILDING AUT

Department of TransportationMIApr 20, 2026$4,177,355
697DCK24F00519

CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS. MOD P00006 INTERNAL ADMIN MOD TO CHANGE CO TO JACQUELINE JONES FOR

Department of TransportationKSApr 10, 2026$769,086

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.

  1. 1Awards are attributed by Unique Entity Identifier CWVJEB454CR7, the government's own recipient identifier, not by name matching.
  2. 2Award records from USAspending.gov, last refreshed Aug 10, 2026.
E CORP federal contracts · BidBenchmark