Contractor
DRACE CONSTRUCTION CORP
- UEI
- E8MCAKAVZ8C4
- Parent UEI
- E8MCAKAVZ8C4
- Resolved by
- uei
- Confidence
- 1.000
Active from Mar 30, 2026 to Jul 28, 2026.
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 80SSC026F7010 DESIGN-BUILD (D-B) SITEWIDE ELECTRICAL UPGRADES AT STENNIS SPACE CENTER (SSC), MS | National Aeronautics and Space Administration | MS | Jul 28, 2026 | $8,816,304 |
| 80SSC025F7007 NATIONAL CENTER FOR CRITICAL INFORMATION PROCESSING AND STORAGE (NCCIPS) CHILLER REPLACEMENT AT STENNIS SPACE CENTER, MS | National Aeronautics and Space Administration | MS | Apr 13, 2026 | $2,630,497 |
| 80SSC024F0023 SEWER SYSTEM AND CONVEYANCE, PHASE 2 AT STENNIS SPACE CENTER, MS | National Aeronautics and Space Administration | MS | Apr 16, 2026 | $6,536,078 |
| 80SSC018D0014 THIS REGIONALIZED MULTIPLE AWARD CONSTRUCTION CONTRACT TWO (MACC-II) SHALL RESULT IN THE AWARD OF A MAXIMUM OF TWENTY-FOUR (24) INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) IN SUPPORT MACC-II. THE MACC-II PROVIDES A CRITICAL IN-PLACE CONTRACTUAL MECHANISM THROUGH A REGIONALIZED MULTIPLE AWARD, INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO SUPPORT GENERAL CONSTRUCTION, ALTERATION, MODIFICATION, MAINTENANCE AND REPAIR, DEMOLITION, DESIGN-BUILD, AND NEW CONSTRUCTION OF BUILDINGS, FACILITIES, AND REAL PROPERTY AT JOHN C. STENNIS SPACE CENTER (SSC), JOHNSON SPACE CENTER (JSC) INCLUDING WHITE SANDS TEST FACILITY (WSTF), KENNEDY SPACE CENTER (KSC), AND MARSHALL SPACE FLIGHT CENTER (MSFC) INCLUDING MICHOUD ASSEMBLY FACILITY (MAF). MACC-II WILL ALSO SUPPORT EMERGENCY RESPONSE TO NATURAL DISASTERS AND EMERGENCIES. OTHER NASA CENTERS AND FEDERAL TENANTS AT NASA FACILITIES MAY UTILIZE MACC-II WITH SSC PROCUREMENT OFFICER APPROVAL. THE MACC-II IS NOT A REQUIREMENTS CONTRACT AND THEREFORE NOT MANDATORY. THE MACC-II IS INTENDED TO PROVIDE A HIGHLY FLEXIBLE CONSTRUCTION CONTRACTING VEHICLE FOR PARTICIPATING CENTERS. THIS SOLICITATION INCLUDES 4 SEED PROJECTS, ONE FOR EACH OF THE 4 CENTERS. DETAILS ARE FOUND IN THE INITIAL MODEL TASK ORDERS LISTED IN SECTION J OF THIS SOLICITATION AND REFERENCED IN SECTION B SCHEDULE: THE CONTRACTOR SHALL PROVIDE ALL LABOR, TOOLS, EQUIPMENT AND MATERIALS TO PERFORM EACH TASK AS DEFINED IN THE SPECIFICATIONS AND DRAWINGS IDENTIFIED FOR THE SPECIFIC INITIAL MODEL TASK ORDER. SEE SECTION J. AND REFERENCE BID ITEM 0002-0005. | National Aeronautics and Space Administration | — | Mar 30, 2026 | — |
| N6945021F4500 SANITARY SEWER REPAIRS | Department of Defense | GA | May 5, 2026 | $2,998,888 |
| 80SSC026F7005 DEMOLITION OF NORTH AND SOUTH SEWAGE LAGOONS AT STENNIS SPACE CENTER, MS | National Aeronautics and Space Administration | MS | Apr 15, 2026 | $4,775,000 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier E8MCAKAVZ8C4, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.