Contractor
DOWL, LLC
- UEI
- G51EQ3EJ89A4
- Parent UEI
- G51EQ3EJ89A4
- Resolved by
- uei
- Confidence
- 1.000
Active from Jun 21, 2023 to Sep 21, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Engineering Services | 10 | $3,946,047 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 69056726F00081N A/E ENGINEERING SUPPORT FOR OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS | Department of Transportation | WA | Jul 13, 2026 | $20,000 |
| 69056724F00023N OR FS MULTI 2023(2), MOUNT HOOD NF DRAINAGE STRUCTURES 30% PRELIMINARY ENGINEERING FOR MT. HOOD DRAINAGE STRUCTURES | Department of Transportation | WA | Apr 17, 2024 | $857,870 |
| 69056723F00052N FLPP OR IP 2022(1), OREGON INTEGRATED PLANNING FLAP NEEDS ASSESSMENT PLANNING TASKS | Department of Transportation | WA | Jun 21, 2023 | $125,178 |
| 69056724F00071N WFL RESEARCH 2024(2), ANCSA 17B GUIDEBOOK DEVELOPMENT PLANNING TASKS | Department of Transportation | WA | Sep 19, 2024 | $237,784 |
| 69056725F00074N A/E DESIGN FOR WA ERFO NPS MORA 2022-2(2) MOUNT RAINIER ERFO REPAIRS PHASE 2 | Department of Transportation | WA | Aug 20, 2025 | $1,072,529 |
| 69056724F00064N MT DAR MALM 2025(2), ULM BRIDGE REPLACEMENT PLANNING TASKS | Department of Transportation | WA | Sep 24, 2024 | $628,304 |
| 69056725F00064N WA ERFO FS GIFPN603 2022-1(1) GIFFORD PINCHOT ERFO REPAIRS 2022 THIS MODIFICATION IS FOR UPDATING THE HORIZONTAL AND VERTICAL ROADWAY ALIGNMENT AND UPDATING PLAN SHEETS. | Department of Transportation | WA | Jul 16, 2026 | $229,023 |
| 69056726F00028N COMPLETE THE DESIGN AND NEPA DOCUMENTATION FOR THE DENALI PARK PEDESTRIAN BRIDGE AND TRAIL PROJECT | Department of Transportation | WA | Apr 1, 2026 | $477,291 |
| 69056723F00035N OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS THIS MODIFICATION IS FOR COR CHANGE. | Department of Transportation | WA | Apr 1, 2026 | $275,440 |
| 69056726F00044N A/E DESIGN FOR MT BR MAO 307(2), CANYON FERRY DAM SPILLWAY BRIDGE REHABILITATION | Department of Transportation | WA | Mar 23, 2026 | $22,629 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier G51EQ3EJ89A4, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Oct 21, 2026.