Contractor
CURTIN MARITIME CORP
- UEI
- CMCFMRN32267
- Parent UEI
- CMCFMRN32267
- Resolved by
- uei
- Confidence
- 1.000
Active from Feb 27, 2026 to May 19, 2026.
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 70Z08426PDL940015 VESSEL RENTAL FOR CG OPERATIONS EXERCISE | Department of Homeland Security | CA | Apr 16, 2026 | $22,400 |
| W912P724C0019 THE WORK INCLUDES ANNUAL MAINTENANCE DREDGING OF REDWOOD CITY CHANNEL TO ELEVATION -30-FT (MLLW) PLUS 1-FT OF PAID OD AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPEC SEC 00 10 00 PRICING SCHEDULE AND 01 11 00 SUMMARY OF WORK. | Department of Defense | CA | Apr 28, 2026 | $3,785,956 |
| W912PM25CA006 MAINTENANCE DREDGING, MILITARY OCEAN TERMINAL SUNNY POINT (MOTSU) | Department of Defense | NC | Apr 21, 2026 | $6,664,260 |
| W912EP23C0017 SETTLEMENT OF REAS FOR ACCEPTANCE SECTIONS 13 AND 15 CLINS 0038 (AS-15) AND 0039 (AS-13) ADDED TO THE CONTRACT FOR THE ADDITIONAL EXCAVATED VOLUME. | Department of Defense | PR | Mar 30, 2026 | $55,446,186 |
| N4008525C0050 48 CALENDAR DAY NO COST TIME EXTENSION | Department of Defense | VA | Mar 27, 2026 | $5,466,335 |
| W912P725CA022 RICHMOND INNER HARBOR (RIH) FY25 MAINTENANCE DREDGING PROJECT, CONTRA COSTA COUNTY, CA. | Department of Defense | CA | Mar 18, 2026 | $5,273,832 |
| W912DR25C0002 PROJECT NAME: FY25 BALTIMORE HARBOR AND CHANNELS MAINTENANCE DREDGING, MARYLAND CHANNELS, CHESAPEAKE BAY, MD. THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO IMPLEMENT CHANGE AD - REQUEST FOR EQUITABLE ADJUSTMENT - DIFFERING SITE CONDITIONS. | Department of Defense | MD | Mar 12, 2026 | $30,549,755 |
| W912PL26CA003 BREAKWATER REPAIR PROJECT LOCATED IN DANA POINT HARBOR. APPROX. 45,000 CY OF SEDIMENT WILL BE DREDGED FOR ACCESS TO THE BREAKWATER AND DEPOSITED IN A NEARSHORE PLACEMENT AREA. | Department of Defense | CA | Mar 6, 2026 | $4,889,212 |
| W912BU25CA039 INLAND WATERWAY CHESAPEAKE AND DELAWARE CANAL MAINTENANCE DREDGING PROJECT | Department of Defense | DE | Mar 3, 2026 | $10,833,195 |
| W912PL25C0039 CNTR FOR NAVAL WPNS STN SEAL BEACH EMERG DREDGING,ORANGE CTY REFNO.R00002 SS002 WEATHER DELAYS NO COST TIME EXTTOTAL CONTRACT PRICE REMAINS UNCHANGED.THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 31 CALENDAR DAYS BY REASON OF THIS MODIFICATION. | Department of Defense | CA | Mar 2, 2026 | $1,990,206 |
| W9123625C5013 THIS PROJECT CONSISTS OF MAINTENANCE DREDGING BY HOPPER DREDGE, MECHANICAL DREDGE, OR A COMBINATION OF THE TWO IN THE THIMBLE SHOAL CHANNEL (PART OF THE NORFOLK HARBOR FEDERAL NAVIGATION PROJECT). | Department of Defense | VA | Feb 27, 2026 | $7,267,349 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier CMCFMRN32267, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.