Skip to content
BidBenchmark

Contractor

CREARE LLC

HANOVER, NH
UEI
JDKYAKDT4TT6
Parent UEI
JDKYAKDT4TT6
Resolved by
uei
Confidence
1.000
Obligated to date
$111,003,8251
Awards
48
Agencies served
3

Active from Dec 5, 2013 to Oct 15, 2026.

Sign in to watch

What they win

Benchmark categories this contractor appears in, by award count.

CategoryAwardsObligated
Engineering Services1$250,000

Recent awards

AwardAgencyPlaceFirst actionCurrent value
80NSSC26C0184

SBIR PHASE II

National Aeronautics and Space AdministrationNHSep 28, 2026$1,274,858
80NSSC25C0183

SBIR I COMPRESSOR FOR IN-SPACE GAS TRANSFER AND PRESSURIZATION

National Aeronautics and Space AdministrationNHAug 25, 2025$156,476
80NSSC18C0223

THE ADVANCED SPACE SUIT CARRIES CONSUMABLE COOLING WATER MAINTAINED AT AMBIENT PRESSURE WITHIN A SOFT-WALLED, FLEXIBLE RESERVOIR. TO ENSURE UNINTERRUPTED THERMAL CONTROL IT IS CRITICAL TO MONITOR THE VOLUME OF WATER REMAINING, BUT NO KNOWN SENSOR IS SUITABLE FOR THIS TASK. EXISTING MEASUREMENT TECHNIQUES ARE UNACCEPTABLY SENSITIVE TO THE MOTION AND VARYING GEOMETRY OF THE RESERVOIR IN MICROGRAVITY, OR TO ELECTROMAGNETIC INTERFERENCE WITHIN THE SUIT ENVIRONMENT. WE HAVE DEVELOPED A SIMPLE, COMPACT, LOW POWER SENSOR THAT ACCURATELY MEASURES THE VOLUME OF FLUID IN ANY SOFT-WALLED BLADDER. OUR INNOVATIVE SENSING TECHNIQUE WILL PROVIDE AN ACCURATE MEASUREMENT THAT IS INSENSITIVE TO GRAVITY, THE MOTION AND GEOMETRY OF THE RESERVOIR, THE PRESENCE OF AIR POCKETS, AND ELECTROMAGNETIC INTERFERENCE. WE WILL DEVELOP A FULLY INTEGRATED SENSOR SYSTEM SUITABLE FOR USE ON THE ADVANCED SPACE SUIT AND PERFORM FUNCTIONAL VALIDATION AND SPACEFLIGHT QUALIFICATION TESTING.

National Aeronautics and Space AdministrationNHSep 12, 2018$1,122,003
80NSSC23CA010

CONTINUOUS CORRELATIONS FOR COMPLETE BOILING CURVES OF CRYOGENIC FLUIDS

National Aeronautics and Space AdministrationNHNov 15, 2022$1,124,986
80NSSC27C0004

PHASE III STTR

National Aeronautics and Space AdministrationNHOct 7, 2026$375,000
80GSFC26C0029

VENUS MASS SPECTROMETER (VMS) WIDE RANGE PUMP (WRP) FOR DAVINCI

National Aeronautics and Space AdministrationNHJul 28, 2026$4,155,821
80GSFC22CA001

WIDE RANGE PUMP

National Aeronautics and Space AdministrationNHDec 14, 2021$9,098,144
80NSSC26C0227

SBIR PHASE I EFFICIENT 1U CUBESAT CRYOCOOLER ELECTRONICS FOR 20 W ROTARY CRYOCOOLERS

National Aeronautics and Space AdministrationNHSep 14, 2026$224,985
80NSSC24CA180

CCRPP - LOW COST CRYOCOOLER CONTROL ELECTRONICS FOR SMALL SPACE PLATFORMS

National Aeronautics and Space AdministrationNHSep 6, 2024$500,000
80NSSC25C0441

SBIR PHASE III - CREARE LLC - 90 K 30 W CRYOCOOLER DESIGN AND DEMONSTRATION

National Aeronautics and Space AdministrationNHSep 16, 2025$13,367,984
80NSSC26P1473

RISK REDUCTION TESTING FOR WIDE RANGE PUMP BALL BEARINGS

National Aeronautics and Space AdministrationNHAug 28, 2026$150,000
80NSSC25C0442

FY25 SBIR PHASE III - CREARE LLC - DEVELOPMENT OF AN ADVANCED RECUPERATOR

National Aeronautics and Space AdministrationNHAug 28, 2025$1,504,578
6913G626C100011

FY26 PHASE II AWARD WITH CREARE LLC UNDER TOPIC AI FOR TRANSPORTATION PLANNING AND DESIGN (AI TPD).

Department of TransportationNHJun 8, 2026$1,712,463
N6833526F0013

HARDWARE

Department of DefenseNHDec 9, 2025$1,149,601
80NSSC25CA011

PHASE III - CRYOCOOLER CONTROL ELECTRONICS (CCE) DEMONSTRATION PHASE

National Aeronautics and Space AdministrationNHJun 30, 2026$2,981,593
80NSSC24CA113

SBIR PHASE II, LOW MAINTENANCE LUNAR DUST FILTRATION

National Aeronautics and Space AdministrationNHApr 29, 2026$899,561
80NSSC24CA111

SBIR PHASE II, LIGHTWEIGHT, LOW-POWER CRYOGENIC VALVE FOR ORBITAL PROPELLANT MANAGEMENT

National Aeronautics and Space AdministrationNHJun 24, 2026$849,815
80NSSC25C0083

SBIR PHASE II - A COMPACT ELECTRICALLY-DRIVEN BOOSTER PUMP FOR SATURATED LIQUID HYDROGEN (LH2)

National Aeronautics and Space AdministrationNHJun 23, 2026$849,977
80NSSC25C0096

PHASE II SBIR

National Aeronautics and Space AdministrationNHJun 22, 2026$899,497
80NSSC25C0092

SBIR PHASE II- SELF-HEALING RADIATOR COOLANT TUBES FOR SPACECRAFT THERMAL CONTROL

National Aeronautics and Space AdministrationNHJun 22, 2026$849,994
80NSSC26C0005

FY25 SBIR PHASE III - VOLUME SENSOR FOR FLEXIBLE FLUID RESERVOIRS IN MICROGRAVITY

National Aeronautics and Space AdministrationNHMay 19, 2026$374,821
80NSSC22CA131

SBIR PHASE II MINIATURE VACUUM PUMP FOR PLANETARY ATMOSPHERE AEROSOL SEPARATOR

National Aeronautics and Space AdministrationNHMay 14, 2026$875,369
N6833524F0368

REPAIR/REFURBISH SERVICES

Department of DefenseNHAug 29, 2024$454,695
N6833520C0320

UNDEFINITIZED ORDER

Department of DefenseNHMay 2, 2026$1,499,011
W912HZ25F0226

THIS MODIFICATION EXERCISES OPTION CLIN 0003, EXTENDING THE PERIOD OF PERFORMANCE THROUGH 29 JULY 2027. ADDITIONALLY, CLAUSES 252.204-7020 AND 252.204-7021 HAVE BEEN ADDED AND SECTION C, PERFORMANCE WORK STATEMENT PARAGRAPH 15.0 HAS BEEN UPDATED.

Department of DefenseNHApr 21, 2026$820,907

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.

  1. 1Awards are attributed by Unique Entity Identifier JDKYAKDT4TT6, the government's own recipient identifier, not by name matching.
  2. 2Award records from USAspending.gov, last refreshed Oct 21, 2026.