Contractor
CREARE LLC
- UEI
- JDKYAKDT4TT6
- Parent UEI
- JDKYAKDT4TT6
- Resolved by
- uei
- Confidence
- 1.000
Active from Dec 5, 2013 to Oct 15, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Engineering Services | 1 | $250,000 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 80NSSC26C0184 SBIR PHASE II | National Aeronautics and Space Administration | NH | Sep 28, 2026 | $1,274,858 |
| 80NSSC25C0183 SBIR I COMPRESSOR FOR IN-SPACE GAS TRANSFER AND PRESSURIZATION | National Aeronautics and Space Administration | NH | Aug 25, 2025 | $156,476 |
| 80NSSC18C0223 THE ADVANCED SPACE SUIT CARRIES CONSUMABLE COOLING WATER MAINTAINED AT AMBIENT PRESSURE WITHIN A SOFT-WALLED, FLEXIBLE RESERVOIR. TO ENSURE UNINTERRUPTED THERMAL CONTROL IT IS CRITICAL TO MONITOR THE VOLUME OF WATER REMAINING, BUT NO KNOWN SENSOR IS SUITABLE FOR THIS TASK. EXISTING MEASUREMENT TECHNIQUES ARE UNACCEPTABLY SENSITIVE TO THE MOTION AND VARYING GEOMETRY OF THE RESERVOIR IN MICROGRAVITY, OR TO ELECTROMAGNETIC INTERFERENCE WITHIN THE SUIT ENVIRONMENT. WE HAVE DEVELOPED A SIMPLE, COMPACT, LOW POWER SENSOR THAT ACCURATELY MEASURES THE VOLUME OF FLUID IN ANY SOFT-WALLED BLADDER. OUR INNOVATIVE SENSING TECHNIQUE WILL PROVIDE AN ACCURATE MEASUREMENT THAT IS INSENSITIVE TO GRAVITY, THE MOTION AND GEOMETRY OF THE RESERVOIR, THE PRESENCE OF AIR POCKETS, AND ELECTROMAGNETIC INTERFERENCE. WE WILL DEVELOP A FULLY INTEGRATED SENSOR SYSTEM SUITABLE FOR USE ON THE ADVANCED SPACE SUIT AND PERFORM FUNCTIONAL VALIDATION AND SPACEFLIGHT QUALIFICATION TESTING. | National Aeronautics and Space Administration | NH | Sep 12, 2018 | $1,122,003 |
| 80NSSC23CA010 CONTINUOUS CORRELATIONS FOR COMPLETE BOILING CURVES OF CRYOGENIC FLUIDS | National Aeronautics and Space Administration | NH | Nov 15, 2022 | $1,124,986 |
| 80NSSC27C0004 PHASE III STTR | National Aeronautics and Space Administration | NH | Oct 7, 2026 | $375,000 |
| 80GSFC26C0029 VENUS MASS SPECTROMETER (VMS) WIDE RANGE PUMP (WRP) FOR DAVINCI | National Aeronautics and Space Administration | NH | Jul 28, 2026 | $4,155,821 |
| 80GSFC22CA001 WIDE RANGE PUMP | National Aeronautics and Space Administration | NH | Dec 14, 2021 | $9,098,144 |
| 80NSSC26C0227 SBIR PHASE I EFFICIENT 1U CUBESAT CRYOCOOLER ELECTRONICS FOR 20 W ROTARY CRYOCOOLERS | National Aeronautics and Space Administration | NH | Sep 14, 2026 | $224,985 |
| 80NSSC24CA180 CCRPP - LOW COST CRYOCOOLER CONTROL ELECTRONICS FOR SMALL SPACE PLATFORMS | National Aeronautics and Space Administration | NH | Sep 6, 2024 | $500,000 |
| 80NSSC25C0441 SBIR PHASE III - CREARE LLC - 90 K 30 W CRYOCOOLER DESIGN AND DEMONSTRATION | National Aeronautics and Space Administration | NH | Sep 16, 2025 | $13,367,984 |
| 80NSSC26P1473 RISK REDUCTION TESTING FOR WIDE RANGE PUMP BALL BEARINGS | National Aeronautics and Space Administration | NH | Aug 28, 2026 | $150,000 |
| 80NSSC25C0442 FY25 SBIR PHASE III - CREARE LLC - DEVELOPMENT OF AN ADVANCED RECUPERATOR | National Aeronautics and Space Administration | NH | Aug 28, 2025 | $1,504,578 |
| 6913G626C100011 FY26 PHASE II AWARD WITH CREARE LLC UNDER TOPIC AI FOR TRANSPORTATION PLANNING AND DESIGN (AI TPD). | Department of Transportation | NH | Jun 8, 2026 | $1,712,463 |
| N6833526F0013 HARDWARE | Department of Defense | NH | Dec 9, 2025 | $1,149,601 |
| 80NSSC25CA011 PHASE III - CRYOCOOLER CONTROL ELECTRONICS (CCE) DEMONSTRATION PHASE | National Aeronautics and Space Administration | NH | Jun 30, 2026 | $2,981,593 |
| 80NSSC24CA113 SBIR PHASE II, LOW MAINTENANCE LUNAR DUST FILTRATION | National Aeronautics and Space Administration | NH | Apr 29, 2026 | $899,561 |
| 80NSSC24CA111 SBIR PHASE II, LIGHTWEIGHT, LOW-POWER CRYOGENIC VALVE FOR ORBITAL PROPELLANT MANAGEMENT | National Aeronautics and Space Administration | NH | Jun 24, 2026 | $849,815 |
| 80NSSC25C0083 SBIR PHASE II - A COMPACT ELECTRICALLY-DRIVEN BOOSTER PUMP FOR SATURATED LIQUID HYDROGEN (LH2) | National Aeronautics and Space Administration | NH | Jun 23, 2026 | $849,977 |
| 80NSSC25C0096 PHASE II SBIR | National Aeronautics and Space Administration | NH | Jun 22, 2026 | $899,497 |
| 80NSSC25C0092 SBIR PHASE II- SELF-HEALING RADIATOR COOLANT TUBES FOR SPACECRAFT THERMAL CONTROL | National Aeronautics and Space Administration | NH | Jun 22, 2026 | $849,994 |
| 80NSSC26C0005 FY25 SBIR PHASE III - VOLUME SENSOR FOR FLEXIBLE FLUID RESERVOIRS IN MICROGRAVITY | National Aeronautics and Space Administration | NH | May 19, 2026 | $374,821 |
| 80NSSC22CA131 SBIR PHASE II MINIATURE VACUUM PUMP FOR PLANETARY ATMOSPHERE AEROSOL SEPARATOR | National Aeronautics and Space Administration | NH | May 14, 2026 | $875,369 |
| N6833524F0368 REPAIR/REFURBISH SERVICES | Department of Defense | NH | Aug 29, 2024 | $454,695 |
| N6833520C0320 UNDEFINITIZED ORDER | Department of Defense | NH | May 2, 2026 | $1,499,011 |
| W912HZ25F0226 THIS MODIFICATION EXERCISES OPTION CLIN 0003, EXTENDING THE PERIOD OF PERFORMANCE THROUGH 29 JULY 2027. ADDITIONALLY, CLAUSES 252.204-7020 AND 252.204-7021 HAVE BEEN ADDED AND SECTION C, PERFORMANCE WORK STATEMENT PARAGRAPH 15.0 HAS BEEN UPDATED. | Department of Defense | NH | Apr 21, 2026 | $820,907 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier JDKYAKDT4TT6, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Oct 21, 2026.