Contractor
CMS CORPORATION
- UEI
- F3XNVDG59VH7
- Parent UEI
- TJG6RDGM24F8
- Resolved by
- uei
- Confidence
- 1.000
Active from Mar 5, 2026 to May 1, 2026.
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| FA890324F0055 FAIR OPPORTUNITY PROPOSAL REQUEST (FOPR) - PHASE II - AMEND 0002, FA8903-24-R-0020 FOR REPAIR/CONSTRUCT INTELLIGENCE SURVEILLANCE RECONNAISSANCE (ISR) FACILITY; B2145 AT BEALE AFB, CA NO: BAEY211000 | Department of Defense | CA | Mar 18, 2026 | $228,545,316 |
| FA890322F0156 THE CONTRACTOR SHALL PROVIDE THE NECESSARY EFFORT AND MANAGEMENT FOR REPAIR FUEL TANKS AT MULTIPLE LOCATIONS CANNON AFB, NM AND ELLSWORTH AFB, SD IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW), 29 JULY 2022, HEREIN IDENTIFIED AS SECTION J, ATTACHMENT | Department of Defense | NM | Apr 23, 2026 | $15,685,114 |
| FA254321F0003 REPAIR BY REPLACE POWER PLANT CONTROLS - IAW SOW | Department of Defense | CO | Apr 23, 2026 | $7,628,722 |
| N4425518F4438 INCORPORATE PC040 AND INTEREST REMAINING ON CLAIM 01 COFD | Department of Defense | WA | Mar 19, 2026 | $40,219,394 |
| FA303024F0040 REPAIR OF HEATING, VENTILATION AND AIR CONDITIONING (HVAC) AT BUILDING 3453. | Department of Defense | TX | Mar 12, 2026 | $11,620,778 |
| FA890324F0094 CONSTRUCT IN-TRANSIT MUNITIONS FACILITY, B1202 AT DOVER AFB, DE PROJECT NUMBER FJXT210047 | Department of Defense | DE | Apr 14, 2026 | $16,890,450 |
| W912GB24C0035 CR003 SITE A - OPS BLDG. WINDOWS 1. PROVIDE TWO WINDOWS IN THE SITE A OPERATIONS BUILDING ADMINISTRATIVE/TESTING ROOM.2. PROVIDE EXTERIOR SPLINTERING PROTECTION OF THE WINDOWS. | Department of Defense | — | Apr 14, 2026 | $21,525,553 |
| N4425522F4291 MODIFICATION TO INCORPORATE PROPOSED CHANGE 05 | Department of Defense | WA | Apr 7, 2026 | $4,054,748 |
| FA890323F0127 THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED 06 FEBRUARY 2023, REPAIR/RENOVATE STUDENT DORM BUILDING 10656 AT JBSA LACKLAND, TX PROJECT NO: MPLS100004. | Department of Defense | TX | Apr 2, 2026 | $15,246,237 |
| FA805121F0001 CONSTRUCTION SERVICES- MAXWELL AFB AMRS FFP THE CONTRACTOR SHALL PERFORM SERVICES IN ACCORDANCE WITH THE STATEMENT OF WORK DATED 5 AUGUST 2020 FOR THE ADVANCED METER READING SYSTEM (AMRS) IMPLEMENTATION AT MAXWELL, AL. | Department of Defense | AL | Mar 26, 2026 | $1,583,428 |
| FA303024F0004 REPAIR B401 CYBER NETWORK PROCESSING CENTER. TOTAL PERIOD OF PERFORMANCE IS 844 CALENDARS DAYS. PERIOD OF PERFORMANCE FOR CLINS 0001, 0002, AND 0003 IS 454 CALENDAR DAYS. PERIOD OF PERFORMANCE FOR CLIN 0004 IS 300 CALENDAR DAYS. PERIOD OF PERFORMANCE | Department of Defense | TX | Mar 12, 2026 | $10,321,925 |
| N4425523F4368 P260 P-8A AIRCRAFT AIRFIELD PAVEMENT IMPROVEMENTS, NAVAL AIR STATION WHIDBEY ISLAND - INCORPORATE PC 21, 22, 23 (UNFO) | Department of Defense | WA | Mar 9, 2026 | $55,927,284 |
| FA890324F0108 THE CONTRACTOR SHALL PROVIDE THE NECESSARY EFFORT AND MANAGEMENT IN ACCORDANCE WITH THE SOW ENTITLED, REPAIR TANKS 32 (FAC#41132) AT WAKE ISLAND, IDENTIFIED IN SECTION J, ATTACHMENT 1. | Department of Defense | MH | Mar 5, 2026 | $23,274,963 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier F3XNVDG59VH7, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 10, 2026.